GSI Beam Scheduling - Requests

Select columns: all, many, few, safety related.
Select rows according to scheduled date: all, past, present, future, not-yet-scheduled, all-but-past.
Click on a column title to sort; click on a cell to apply filter.
Click here to submit a new request.

REQNR REQDAT EXPNR EXPTIT SPOKES SPOPHO SPOMAI CONTACT CONPHO CONMAI MAIPAR AREA ION ENRICH ENERGY INTENS OTHER SHIFTS WHEN SAFGAS SAFMAT SAFIMP SAFHEAV SAFSOUR SAFBTG SAFHV SAFRF SAFLAS SAFOTH RUNBEG RUNEND RUNCOM DATUM_EINTRAG DATUM_CHANGE
1108 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite Z6 12C (ECR)   <11.5 MeV/u 1 pmicroA low duty cycle, 18:00-6:00                         22.11.2004 23.11.2004 prio:3 text:"M001, Scheeler, 12C (ECR), <11.5 MeV/u, 1 pmicroA, low duty cycle, 18:00-6:00, Z6" 08.09.2004 27.01.2010
1109 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite HTP 12C (ECR)   <400 MeV/u 2e8/spill low duty cycle                         15.11.2004 19.11.2004 prio:3 text:"M001, Scheeler, 12C (ECR), <400 MeV/u, 2e8/spill, low duty cycle, HTP, HHD" 08.09.2004 27.01.2010
1110 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite HTP 12C (ECR)   <400 MeV/u 2e8/spill low duty cycle                         22.11.2004 26.11.2004 prio:3 text:"M001, Scheeler, 12C (ECR), <400 MeV/u, 2e8/spill, low duty cycle, HTP, HHD" 08.09.2004 27.01.2010
1111 09.09.2004 U209 Nuclear Structure Investigations No, Lr Hessberger 2735 f.p.hessberger@gsi.de       main Y7 48Ca 48Ca 4.2-5.5 MeV/u 500 pnA   33 january 2004 (parallel to RISING exp.)         239Pu, 241Am, 242Cm, Cf-sf (<0.1 microCi)         high beam currents 14.01.2005 25.01.2005 prio:1 text:"U209, Hessberger, 48Ca (ECR), 4.2-5.5 MeV/u, 1 pmicroA , Y7" 09.09.2004 27.01.2010
1112 30.09.2004 S282 Two-photon decay in heavy He-like systems Dunford 001-630-252-4052 dunford@anl.gov Braeuning-Demian 2796 a.braeuning-demian@gsi.de main HTA Au ( or Bi, U, Pb), He-like, stripper in TH4-DK3   100 MeV/u and 170 MeV/u 1e8/spill (SIS) SIS cooler, 12 s extraction, flat top 18 second hafl of 2005 none Be-windows, 0.1 mm thick, 35 mm diameter Yes: Be windows, Glass windows     Yes: air ~ 15 cm         26.07.2005 31.07.2005 prio:1 text:"S282, Dunford/Braeuning-Demian, Pb (PIG), He-like, stripper in TH4-DK3, 100 MeV/u and 170 MeV/u, 1e8/spill (SIS), SIS cooler, 12 s extraction, flat top, HTA" 30.09.2004 27.01.2010
1775 04.10.2004 S277 Single particle occupancies near 54Ca... Krücken 089-289-12433 Reiner.Kruecken@ph.tum.de Aumann 2668 T.Aumann@gsi.de 2 days parasitic / rest main FRS 2 days 48Ca parasitic, 2 days 48Ca main, rest 86Kr34+ main 48Ca 500 MeV/u Ca: 10e5/spill , Kr: 10e10 / spill 8s extraction 48 mid November 2005 - April 2006, best at beginning or end of this period due to. MINIBALL availability, should be scheduled together with S245 (beam request will be handed in shortly) which wants to use same setup     Standar GSI Vacuum Windows Remove Part of S2 SRS set-up, build up Ge holding structure   secondary beam: ca 400 MeV/u, 10e4 Hz, 4m 5 kV, 1 microAmp Ge High Voltage       02.04.2006 17.04.2006 prio:1 text:"S277, Krücken/Aumann, 2 days 48Ca parasitic, 2 days 48Ca main, rest 86Kr34+ main, 500 MeV/u, Ca: 10e5/spill , Kr: 10e10 / spill, 8s extraction, FRS" 04.10.2004 27.01.2010
1116 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main Y7 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       07.04.2005 22.05.2005 prio:1 text:"U184, Hofmann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, Y7" 16.10.2004 27.01.2010
1114 08.10.2004 S104 Investigation of Actinide Nuclei by Fragmentation of 238U Schmidt 06159 71 2739 k.h.schmidt@gsi.de Schmidt 06159 71 2739 k.h.schmidt@gsi.de parasite FRS 208Pb   1000 MeV/u, 500 MeV/u 1e6/spill (SIS) 10 s extraction 6 days Third block 2005 P10, 0.2 L/min   Standard FRS vacuum windows     208Pb, <900 MeV/u,1e4 part/sec, air, 5 m 4000 V , 2mA       26.07.2005 31.07.2005 prio:2 text:"S104, K.-H. Schmidt, 208Pb(PIG), 1000 MeV/u, 500 MeV/u, 1e6/spill, 10 s extraction, FRS" 08.10.2004 27.01.2010
1115 19.10.2004 U207 Optical Spectroscopy of Nobelium Backe 06131-3925563 backe@kph.uni-mainz.de Block 2742 m.block@gsi.de main Y7 52Cr   4-5 MeV/u 100 pnA   6 not before March 2005 XeF, XeCl, 10l   thin foil window,       5kV/nA   Excimer/Dye (20W), Nd:YAG/OPO (25W)   04.07.2005 05.07.2005 prio:1 text:"U207, Backe/Block, 52Cr (PIG), 4-5 MeV/u, 100 pnA, Y7" 19.10.2004 27.01.2010
1118 26.10.2004 S247 Study of nuclear density distributions in light halo-nuclei by proton elastic scatering in inverse kinematics Khanzadeev +7 81371 46741, 2662 khanzade@pnpi.spb.ru p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de parasite HTC 12C   700 MeV/u 1e5/spill   10 (parasitic) last block 2005, 5 days before main run target H2, 500 l at 10 bar no two 0.5 mm Be window, 80 mm diameter ALADIN magnet, IKAR chamber 241Am inside IKAR chamber, 1e-10 Cu 5 m air, 1.6 m H2 10 bar, <1e5/spill, 700 Mev/u 15 kV, 1 uA       08.11.2005 13.11.2005 prio:3 text:"S247, Khanzadeev/Egelhof, 12C (ECR), 700 MeV/u, 1e5/spill, HTC" 26.10.2004 27.01.2010
1117 18.10.2004 U211 Even-even nucleus 260Sg Sulignano 2736 B.Sulignano@gsi.de       main Y7 54Cr 54Cr 5.0 MeV/u 1 pmicroA   63 early in 2005, after 48Ca/Hofmann   alcohol for cooling         +-300 kV SHIP high voltage       02.03.2005 14.03.2005 prio:1 text:"U211, Sulignano, 54Cr (ECR), 4.5-5.3 MeV/u, 1 pmicroA, Y7" 18.10.2004 27.01.2010
1119 26.10.2004 S247 Study of nuclear density distributions in light halo-nuclei by proton elastic scatering in inverse kinematics Khanzadeev +7 81371 46741, 2662 khanzade@pnpi.spb.ru p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de main HTC 12C, 18O 18O 800 MeV/u >1e11/spill   22 shifts 12C + 36 shifts 18O, 3 days rest in between last block 2005, 5 days after parasitic run target H2, 500 l at 10 bar no two 0.5 mm Be window, 80 mm diameter ALADIN magnet, IKAR chamber 241Am inside IKAR chamber, 1e-10 Cu 5 m air, 1.6 m H2 10 bar, <1e5/spill, 700 Mev/u 15 kV, 1 uA       25.11.2005 27.11.2005 prio:1 text:"S247, Khanzadeev/Egelhof, 12C (ECR), 800 MeV/u, >1e11/spill, FRS/HTC" 26.10.2004 27.01.2010
1510 30.01.2006 U217 Mass Measurements at SHIPTRAP Block 2742 m.block@gsi.de       Main Y7 050 Cr / ECR 50Cr 3.4 4.0 MeV/u 100-500 pnA   9 July 2006     Window foil between SHIP and SHIPTRAP   223 Ra, 10kBq.         strong magnetic field, high beam current 09.08.2007 13.08.2007 prio:1 text:"U217, Block, 48Ca / ECR, 3.4 4.0 MeV/u, 1 puA, Y7 - SHIPTRAP" 30.01.2006 27.01.2010
1121 03.11.2004 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth 2151 j.stroth@gsi.de parasite (therapy nights) HAD 40Ca   2 AGeV 10^8 / spill 14 s extraction 6 week 5 - 6, 2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 31.01.2005 03.02.2005 prio:2 text:"S301, Stroth, 40Ca (PIG), 2 GeV/u, 1e8/spill, 9 s extraction, HAD" 03.11.2004 27.01.2010
1107 08.09.2004 B Ausbildung Betriebspersonal Scheeler 2316 U.Scheeler@gsi.de       parasite UNILAC         low duty cycle                         13.11.2006 17.11.2006 prio:3 text:"B, Scheeler, operating training, day only" 08.09.2004 27.01.2010
1997 12.10.2006 U216 RBS Commissioning Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU 12C2+   1.4MeV/u few nA 5ms, >25Hz 8 13.-15. Nov. 2006     standard UHV viewport               13.11.2006 15.11.2006 prio:2 text:"U216, Bender/Bender, 12C, 1.4MeV/u, few nA, HLI, UU" 12.10.2006 27.01.2010
1049 22.04.2004 U074 Roth/Blazevic 2294 a.blazevic@gsi.de Wahl 2291 h.wahl@gsi.de parasite Z6 Zn   5.0 MeV/u 500 pnA, single pulses low energy- and time-spread 2x15 16.08-10.09.2004                     30.08.2004 03.09.2004 prio:2 22.04.2004 27.01.2010
1113 17.12.2003 U201 Commissioning of SHIPTRAP Quint 2141 w.quint@gsi.de Block 2742 m.block@gsi.de main Y7 40Ar   4-5 MeV/u 10-50 pnA   9 2004 block 3-4                     22.02.2005 24.02.2005 prio:1 text:"U201, Quint/Block, 40Ar (PIG), 4-5 MeV/u, 500 pnA, 50 Hz, 5 ms, Y7" 17.12.2003 27.01.2010
1047 24.03.2004 S251 FOPI Upgrade Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB Au or U or Pb   >=1000 MeV/u 5e6/spill longest extraction 9                       15.11.2004 28.11.2004 prio:2 text:"S251, Herrmann/Hildenbrand, Ta (MEVVA), max E, 5e6/spill, longest extraction, HTB" 24.03.2004 27.01.2010
1048 21.04.2004 E043 Charge transfer from complex targets... Braeuning-Demian 2796 a.braeuning-demian@gsi.de         X4 U73+ (PIG) or Pb   11 MeV/u     12 Sep-Oct 2004, not before August 2004   Be-window 40 mm x 100 micron Be-window 40 mm x 100 micron; glass window CF100/CF160 the apparatus sits on a frame equipped with rolls             09.09.2004 13.09.2004 prio:2 21.04.2004 27.01.2010
1052 11.05.2004 E047 Electron spectrometer commissioning Hagmann 2437 s.hagmann@gsi.de       main ESR 238U89+...92+   50-400 MeV/u     4/12 Nov-Dec 2004                     08.12.2004 12.12.2004 prio:2 text:"E047, Hagmann, U (PIG), 50-400 MeV/u, ESR" 11.05.2004 27.01.2010
1050 06.05.2004 U184 Heavy elements Hofmann 2734/2685 s.hofmann@gsi.de       main Y7 136Xe 136Xe 4.64, 4.53, 4.76 MeV/u 100-200 pnA high transmission of UNILAC 30 7-16.05.2004   alcohol for cooling         +-300 kV SHIP HV       06.05.2004 16.05.2004 prio:1 interrupted because of background 06.05.2004 27.01.2010
1051 06.05.2004 S287 Dipole strength in Ni isotopes Aumann 2668 t.aumann@gsi.de       main HTC 86Kr   700 MeV/u 2e10/spill   39 1st block 2005     thin vacuum window phi 50 cm     68Ni, 500 meV/u, 1e5/spill, 5 m air         26.04.2005 08.05.2005 prio:1 text:"S287, Aumann, 86Kr (MUCIS) 2e10/spill, 700 MeV/u, FRS/HTC" 06.05.2004 27.01.2010
1053 14.05.2004 U182 Methodological Developments for Studies... Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 40Ar or 80Kr   6.5 - 9.0 MeV/u 100 pnA, >= 5 Hz 5 ms 2x3 if Ar-40 or 2x2 if Kr-80 Nov 04, specifically 6.-7.11. if Kr-80 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity 13.11.2004 13.11.2004 prio:2 text:"U182, Kratz/Schaedel, 80Kr (MUCIS), 6.5 - 9.0 MeV/u, 100 pnA, >= 5 Hz, 1 ms, X1" 14.05.2004 27.01.2010
1054 14.05.2004 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, >= 5 Hz (50 Hz desirable if available) 5 ms 6 shifts 2.-3. Nov 2004 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity 04.11.2004 04.11.2004 prio:1 text:"U182/U210, Schaedel, 12C (ECR), 6.5-7.5 MeV/u, 500 pnA, 5 ms, 50 Hz" 14.05.2004 27.01.2010
1055 14.05.2004 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 3 shifts 1.11. + 3 shifts 4.11. + 6 shifts 26.-27.11. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 26.11.2004 27.11.2004 prio:1 text:" " 14.05.2004 27.01.2010
1058 14.05.2004 S243 Final focusing and HED matter Varentsov 1329 D.Varentsov@gsi.de Varentsov 1329 D.Varentsov@gsi.de parasite, single shot HHT U - 300-400 AMeV >1e9 (1e10)/spill (MAX!) fast extraction, strong bunch compression 5-7 (10% or less parasitic mode) 27.9-3.10.2004 no no no no no no no no no no 27.09.2004 03.10.2004 prio:2 text:"S243, Varentsov, 238U (PIG), 300-400 MeV/u, 2e9/spill, fast extr, bunch compr, HHT" 14.05.2004 27.01.2010
1057 14.05.2004 S243 Commissioning of HHT beamline + Diamond detector tests Berdermann 2207 E.Berdermann@gsi.de Varentsov 1329 D.Varentsov@gsi.de parasite, single shot, days HHT N - 300 AMeV 1e10-1e11/spill fast extraction, bunch compression 3-5 (10% or less mode) 16-20.08.2004 no no no no no no no no no no 16.08.2004 20.08.2004 prio:3 14.05.2004 27.01.2010
1060 17.05.2004 U165 Molecular fragmentation Lutz     Mann 2724 r.mann@gsi.de main X4 Z>=54Xe, q>=40, best U65+   3-8 MeV/u 100 pnA, 50 Hz 5 ms 6 3-4 block 2004             computer       01.07.2005 02.07.2005 prio:1 text:"U165, Lutz/Mann, 197Au, 3-8 MeV/u, 100 pnA, 50 Hz, 5 ms, X4" 17.05.2004 27.01.2010
1063 21.05.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 12C   11.4 MeV/u 2 pnA, 5 ms pulse   9 8-10.11.2004                     08.11.2004 10.11.2004 prio:2 text:"UBIO, Scholz, 12C (ECR), 11.4 MeV/u, 2 pnA, 5 ms pulse; Ti (PIG), X6" 21.05.2004 27.01.2010
1062 21.05.2004 S249 Precise Measurement of Stopping Power Golubev   alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite HTA U   100, 500 MeV/u 1e8/spill   10-12 15-30. September 2004                     20.09.2004 24.09.2004 prio:2 21.05.2004 27.01.2010
1064 21.05.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 70Zn   11.4 MeV/u 2 pnA, 5 ms pulse   6 6-7.09.2004                     06.09.2004 07.09.2004 prio:2 21.05.2004 27.01.2010
1065 21.05.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 12C   11.4 MeV/u 2 pnA, 5 ms pulse   9 9-11.08.2004                     09.08.2004 11.08.2004 prio:2 21.05.2004 27.01.2010
1067 04.06.2004 U190 Stopping power measurements... Golubev ITEP alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite Z6 12C   5.9, 11.4 MeV/u high intensity   10 day shifts 4-8.08.2004   high explosive RDX, 55 g per Target         pulse generator for fast valves, 2 kV       04.08.2004 08.08.2004 prio:2 04.06.2004 27.01.2010
1068 15.06.2004 S214 Bound states of eta and omega Gillitzer 02461-6112 A.Gillitzer@fz-juelich.de Weick 2158 H.Weick@gsi.de main FRS d   1750 MeV/u 2e11/spill parasitic test with C, Ni 1 GeV/u before 33 January 2005, not March/April C2H6, 1 cc/min         3-4 m 3He through the air 1.5 kV       22.07.2005 24.07.2005 prio:1 text:"S214, Gillitzer/Weick, d (MUCIS), 1750 MeV/u, 2e11/spill, FRS" 15.06.2004 27.01.2010
1070 23.06.2004 U204 Measurement of ion-induced desorption Kraemer 2082 a.kraemer@gsi.de Kraemer 2082 a.kraemer@gsi.de parasite HHT U28+   10MeV/u, 100MeV/u, 500MeV/u, 1000MeV/u 2e9/spill 3ms 30 10.9.-19.9.2004                     10.09.2004 19.09.2004 prio:2 text:"U204, Kraemer, U28+ 10/50/100/200 MeV/u, U73+ 10/50/100/200/500/1000 MeV/u, 1e9/spill, 3 ms" 23.06.2004 27.01.2010
1071 24.06.2004 S287 Dipole strength in Ni isotopes Aumann 2668 t.aumann@gsi.de       parasite, therapy nights HTC any   500 MeV/u 1000/spill slow extraction 12 shifts parasitic (1:10) or three therapy nights 1st block 2005, before main run     thin vacuum window phi 50 cm     500 MeV/u, 1e3/spill, 5 m air         22.02.2005 27.02.2005 prio:2 text:"S287, Aumann, 40Ar (PIG), 500 MeV/u, 1e3/spill, slow extr, HTC" 24.06.2004 27.01.2010
1072 02.07.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Ni   11.4 MeV/u 2 pnA 5ms 6 26.-27.7.2004     Hostaphan exit window     Ni 11 MeV/u, ~50mm air         26.07.2004 27.07.2004 prio:2 02.07.2004 27.01.2010
1069 22.06.2004 U184 Beam velocity monitor Hofmann 2734 S.Hofmann@gsi.de Mann 2724 R.Mann@gsi.de parasite X4 as beam at Y7   exactly as for Y7 10 pnA ~ 5% of Y7     11. 11. until 25. 11. parallel to Y7                     11.11.2004 25.11.2004 prio:2 text:"U184, Hofmann/Mann, same beam as in Y7, X4" 22.06.2004 27.01.2010
1073 22.07.2004 S225 Life time measurements in He-like ions... ( detector test) Marrus     Braeuning-Demian 2796 a.braeuning-demian@gsi.de parasite HTA 70Zn (10+?) , ECR,   200-400 MeV/u 1e7/spill (SIS) SIS cooler, 10 s extraction, flat top 3 27.08.04 - 30.08.04     stainless steel window     yes: beam extracted in air, 30 cm         28.08.2004 29.08.2004 prio:3 text:"S225, Braeuning-Demian, 70Zn (ECR), 200-400 MeV/u, 1e7/spill, SIS cooler, 10 s extraction, flat top" 22.07.2004 27.01.2010
1074 23.07.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite Y7 12C   <11.5 MeV/u 1 pmicroA low duty cycle                         01.11.2004 05.11.2004 prio:3 text:"M001, Scheeler, 12C (ECR), <11.5 MeV/u, 1 pmicroA, low duty cycle, Z6, Y7" 23.07.2004 27.01.2010
1075 23.07.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite HTP 12C   <400 MeV/u 2e8/spill low duty cycle                         08.11.2004 12.11.2004 prio:3 text:"M001, Scheeler, 12C (ECR), <400 MeV/u, 2e8/spill, low duty cycle, HTP, HHD" 23.07.2004 27.01.2010
1076 26.07.2004 S269-1 Shape evolution in light n-rich nuclei Mayet   Pascale.Mayet@fys.kuleuven.ac.be Gerl 2643 j.gerl@gsi.de main S4 48Ca 48Ca 400 MeV/u 1e9/spill 4 s extraction, constant spill structure 21 January 2005 standard MW, MUSIC (FRS) no Ti and C windows (FRS) Ge detector ? standard gamma sources beam goes through air 100 Me/u, 1000 pps max 5000V , 100 mue A       14.01.2005 20.01.2005 prio:1 text:"S269-1, Mayet/Gerl, 48Ca (ECR), 400 MeV/u, 1e9/spill, 4 s extraction, constant spill structure, FRS-S4" 26.07.2004 27.01.2010
1077 26.07.2004 S269-4 New shell structure at N>>Z Grawe   h.grawe@gsi.de       main S4 40Ca 40Ca 400 MeV/u 1e9/spill 4 s extraction, constant spill structure 21 January 2005 standard MW, MUSIC (FRS)   Ti and C window (FRS) ge - detector ? standard gamma ray sources beam goes through air 100 MeV/u 1000 pps 5000 V, 100 mue A       21.01.2005 27.01.2005 prio:1 text:"S269-4, Grawe, 40Ca (PIG), 400 MeV/u, 1e9/spill, 4 s extraction, constant spill structure, FRS-S4" 26.07.2004 27.01.2010
1082 04.08.2004 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Au   11.4 MeV/u 3 pnA   12 4-7.08.2004                     24.06.2005 25.06.2005 prio:1 text"UMAT, Trautmann, Au (PIG), 11.4 MeV/u, X0" 04.08.2004 27.01.2010
1078 26.07.2004 S269-9 Magnetic moments of Xe and Te Speidel   speidel@iskp.uni-bonn.de Mandal   s.mandal@gsi.de main S4 136Xe 136Xe 500 MeV/u 1e9/spill 4 s extraction constant spill structure 21 first half March 2005 standard MW, MUSIC (FRS)   Ti and C window (FRS) Ge detector standard gamma ray sources beam goes through air 100 MeV/u 1000 pps 5000 V 100 mue A       28.02.2005 07.03.2005 prio:1 text:"S269-9, Speidel/Mandal, 136Xe (MUCIS), 500 MeV/u, 1e9/spill, 4s extr constant spill, FRS-S4 26.07.2004 27.01.2010
1245 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 U   11.4 MeV/u 2 pnA 5ms pulse 9 1.-2.12.2005                     04.12.2005 05.12.2005 prio:1 text:"UBIO, Scholz, U (PIG), 11.4 MeV/u, 2 pnA, 1 ms , X6" 31.05.2005 27.01.2010
1080 26.07.2004 S283 First spectroscopic investigation of 69Br Becker   f.becker@gsi.de Becker f.becker@gsi.de main S4 78Kr 78Kr 600 MeV/u 1e9/spill 4 s extraction constant spill structure 21 second half April 2005 standard MW, MUSIC (FRS)   Ti and C windows (FRS) Ge-detector standard gamma ray sources beam goes through air 100 MeV/u 1000 pps 5000 V, 100 mue A       07.04.2005 14.04.2005 prio:1 text:"S283, Becker, 78, 86Kr (MUCIS), 600 MeV/u, 1e9/spill, 4s extr constant spill, FRS-S4" 26.07.2004 27.01.2010
1081 26.07.2004 S269-3 Gamma decay of the GDR Bracco   bracco@mi.infn.it Aumann   t.aumann@gsi.de main S4 86Kr 86Kr 700 MeV/u 1e10/spill 4 s extraction constant spill structure 21 second half April 2005 standard MW MUSIC (FRS)   Ti and C windows (FRS) Ge-detctor standard gamma ray sources beam goes through air 300 MeV/u 1000 pps 5000 V , 100 mue A       15.04.2005 21.04.2005 prio:1 text:"S269-3, Bracco/Aumann, 86Kr (MUCIS), 700 MeV/u, 1e10/spill, 4s extr constant spill, FRS-S4" 26.07.2004 27.01.2010
1083 04.08.2004 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de Voss 2173 K.-O.Voss@gsi.de parasite X0 U   11.4 MeV/u   5 Hz 6 14-15.09.2004                     14.09.2004 15.09.2004 prio:2 04.08.2004 27.01.2010
1084 04.08.2004 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite X0 U   11.4 MeV/u     9 28-30.11.2004                     28.11.2004 30.11.2004 prio:2 text:"UMAT, Trautmann, 238U, 11.4 MeV/u, 1 ms, X0" 04.08.2004 27.01.2010
1085 04.08.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       parasite X0 Zn   3.6 MeV/u   5 Hz 6 4-5.09.2004                     04.09.2004 05.09.2004 prio:2 04.08.2004 27.01.2010
1087 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA Au   148 MeV/u     9 2-4.08.2004                     02.08.2004 04.08.2004 prio:3 04.08.2004 27.01.2010
1088 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA U   300 MeV/u     6 1-2.10.2004                     01.10.2004 02.10.2004 prio:3 text:"SMAT, Trautmann, U(PIG), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1089 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA U   300 MeV/u     9 1-3.12.2004                     01.12.2004 03.12.2004 prio:3 text:"SMAT, Trautmann, U (PIG), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1090 06.08.2004 E000 ESR development Steck 2406 M.Steck@gsi.de       parasite ESR 70Zn (ECR)         72                       16.08.2004 08.09.2004 prio:2 06.08.2004 27.01.2010
1104 31.08.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Kr   11.4 MeV/u 2 pnA 5ms 3 5.11.2004     Hostaphan exit window     Kr 11 MeV/u, ~50mm air         05.11.2004 05.11.2004 prio:1 text:"UBIO, Scholz, Kr (MUCIS), 11.4 MeV/u, 2 pnA, 1 ms, X6" 31.08.2004 27.01.2010
1079 26.07.2004 S285 Triaxiality in even-even core nuclei Saito 2656 t.saito@gsi.de Saito   t.saito@gsi.de main S4 152Sm 152Sm 750 MeV/u 1e8/spill 4 s extraction constant spill structure 21 first half of March 2005 standard MW, MUSIC (FRS)   Ti and C window (FRS) Ge Detector standard gamma ray sources beam going through air 100 MeV/u 1000 pps 5000 V, 100 mue A       08.03.2005 14.03.2005 prio:1 text:"S285, Saito, 152Sm (PIG), 750 MeV/u, 1e8/spill, 4s extr constant spill, FRS-S4" 26.07.2004 27.01.2010
1105 02.09.2004 SBIO   Scholz 1340 m.scholz@gsi.de       Therapy nights HTM 12C   100-400 MeV/u 2x10e8 / Spill Therapy conditions 4-5 approx. 8 days after begin of first therapy block 2005,                     04.02.2005 08.02.2005 prio:2 text:"SBIO, Scholz, 12C (ECR), 100-400 MeV/u, 2e8/spill, nights, HTM/HTA" 02.09.2004 27.01.2010
1059 14.05.2004 S255 EOS of HED matter Varentsov 1329 D.Varentsov@gsi.de Varentsov 1329 D.Varentsov@gsi.de parasite, single shot HHT U   300-400 AMeV MAX (>1e9/spill) fast extraction, strong bunch compression 5-7 (10% or less parasitic mode) 4-12.12.2004 no no no no no no no no no no 06.12.2004 12.12.2004 prio:3 text:"S255, Varentsov, U (PIG), 300-400 MeV/u, 1e9/spill, fast extraction, strong bunch compression, HHT" 14.05.2004 27.01.2010
1056 14.05.2004 U189 Projectile spectroscopy Rosmej 1301 o.rosmej@gsi.de       parasitic Z6 Mg   11.4 MeV/u 1-10 emicroA   18 4-10.12                     01.12.2004 07.12.2004 prio:2 text:"U189, Rosmej, Mg (ECR), 11.4 MeV/u, 1-10 emicroA, Z6" 14.05.2004 27.01.2010
1086 04.08.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       main X0 12C   4.8 MeV/u max intensity sharp energy, long pulse 9 28-30.10.2004                     28.10.2004 30.10.2004 prio:1 text:"UMAT, Fischer, 12C (ECR), 4.8 MeV/u, max I, sharp energy, long pulse, X0" 04.08.2004 27.01.2010
1580 27.02.2006 UBIO PT04 electron spectroscopy Hagmann 2437 s.hagmann@gsi.de       main X4 Kr   3.6AMeV 1nA 5ms pulse 6 6-7April                     06.04.2006 07.04.2006 prio:1 text:"UBIO PT04, Hagmann, Kr, 3.6AMeV, 1nA, 5ms pulse, X3" 27.02.2006 27.01.2010
1180 26.01.2005 U205 Decay properties near Z=108 and N=162 Tuerler 089-289-12202 andreas.tuerler@radiochemie.de Schaedel 2460 m.schaedel@gsi.de main X1 26Mg5+ (ECR) 26Mg 192.7 MeV/u 1 pmicroA, 50 Hz 5.5 ms, rotating 248Cm target ARTESIA 60 between 15.7 and 2.9.2005 O2 100 ml/min in He   Be-window, irradiation in standard rotating target (248 Cm) wheel gas transport system X1->X1A     26Mg, 6 MeV/u, 1 pmicroA through 100 mm He, 1 bar       open radioactivity, 248 Cm target wheel 03.08.2005 22.08.2005 prio:1 text:"U205, Tuerler/Schaedel, 26Mg5+ (ECR), 192.7 MeV, 1 pmicroA, 50 Hz, 5.5 ms, rotating 248Cm target ARTESIA, X1" 26.01.2005 27.01.2010
1223 06.04.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de Varentsov 1329 D.Varentsov@gsi.de parasite, single-shot HHT any ion - 400 AMeV 1e8 /spill tuning up to 1e10/spill fast extraction, bunch compression 18 Autumn 2005, after exp. S302; not 16-Oct-24-Oct-2005           detectors in chamber floated with Argon 100V - 400 V       06.03.2006 10.03.2006 prio:3 text:"S280, Berdermann/D. Varentsov, 208Pb (PIG), 400 AMeV, 1e9/spill, fast extraction, bunch compression, HHT" 06.04.2005 27.01.2010
1214 08.10.2004 S104 Investigation of Actinide Nuclei by Fragmentation of 238U Schmidt 06159 71 2739 k.h.schmidt@gsi.de Schmidt 06159 71 2739 k.h.schmidt@gsi.de parasite FRS 208Pb   1000 MeV/u, 500 MeV/u 1e6/spill (SIS) 10 s extraction 6 days Third block 2005 P10, 0.2 L/min   Standard FRS vacuum windows     208Pb, <900 MeV/u,1e4 part/sec, air, 5 m 4000 V , 2mA       26.06.2005 29.06.2005 prio:3 text:"S104, K.-H. Schmidt, Au(PIG), 1000 MeV/u, 500 MeV/u, 1e6/spill, 10 s extraction, days only, FRS" 08.10.2004 27.01.2010
1215 08.10.2004 S104 Investigation of Actinide Nuclei by Fragmentation of 238U Schmidt 06159 71 2739 k.h.schmidt@gsi.de Schmidt 06159 71 2739 k.h.schmidt@gsi.de parasite FRS 208Pb   1000 MeV/u, 500 MeV/u 1e6/spill (SIS) 10 s extraction 6 days Third block 2005 P10, 0.2 L/min   Standard FRS vacuum windows     208Pb, <900 MeV/u,1e4 part/sec, air, 5 m 4000 V , 2mA       24.06.2005 24.06.2005 prio:3 text:"S104, K.-H. Schmidt, Au(PIG), 1000 MeV/u, 500 MeV/u, 1e6/spill, 10 s extraction, days only, FRS" 08.10.2004 27.01.2010
1241 19.05.2005 U216 ERDA: Investigation of NEG coated Surfaces Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de main UU 131Xe 131Xe 1.4 MeV/u 50 Hz, maximum intensity   9 Week 42 Ionisation Chamber, C4H10, 0.06 gas liters / h   standard vacuum glas window (4x)               19.01.2006 22.01.2006 prio:2 text:"U216, Bender/Bender, 136Xe, 1.4 MeV/u, 50 Hz, maximum intensity, UU" 19.05.2005 27.01.2010
1212 04.08.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       main X0 C   4.8 MeV/u   5 Hz 12 4-5.09.2004                     06.07.2005 09.07.2005 prio:1 text"UMAT, Fischer, 12C (ECR), 4.8 MeV/u, large duty cycle, good energy definition, max beam current, X0" 04.08.2004 27.01.2010
1229 29.04.2005 E062 ESR measurements of p,gamma rates Heil +49 7247 82 3984 michael.heil@ik.fzk.de Litvinov 2142 y.litvinov@gsi.de parasite ESR   112Sn 200 MeV/u maximum SIS cooler, fast extraction 21 shifts no no no no no no no no no no Gas-Jet operation 06.12.2005 12.12.2005 prio:2 text:"E062, Heil/Litvinov, 112Sn (ECR), 200 MeV/u, 10e9/spill, SIS cooler, fast extraction, deceleration < 10 MeV/u, H-target, ESR" 29.04.2005 27.01.2010
1231 03.05.2005 U216 ERDA: Oxide Layers on stainless steel Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU Xe (ECR)   1.4 MeV/u >=20 Hz   9 Week 29/30/31 Ionisation Chamber, C4H10, 0.06 gas liters / h   standard vacuum glas window (4x)               26.07.2005 28.07.2005 prio:1 text:"U216, Bender, Xe (ECR), 1.4 MeV/u, UU" 03.05.2005 27.01.2010
1221 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Sn   11.4 MeV/u 2 pnA 5ms pulse 9 8,-9.12.2005                     07.12.2005 09.12.2005 prio:2 text:"UBIO, Scholz, Sn(ECR), 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 31.05.2005 27.01.2010
1246 02.06.2005 S294 Fragmentation of neutron-rich projectiles around 132Sn J. Benlliure + 34 647344121 j.benlliure@usc.es K.-H. Schmidt 2737 k.h.schmidt@gsi.de parasite FRS 136Xe   950 MeV/u 1e9/spill 10 s extraction 15 1 or 2 weeks before the 238U beam (same proposal) P10 No standard FRS vacuum windows No No 136Xe through 5 meters of air 4000 V / 2 mA No No No 23.11.2006 26.11.2006 prio:3 text:"S294, J. Benlliure/K.-H. Schmidt, 132Xe (MUCIS), 1150 MeV/u, 1e7/spill, 10 s extraction, FRS" 02.06.2005 27.01.2010
1247 03.06.2005 S294 Fragmentation of neutron-rich projectiles around 132Sn J. Benlliure + 34 647344121 j.benlliure@usc.es K.-H. Schmidt 2737 k.h.schmidt@gsi.de main FRS 238U   950 MeV/u maximum possible, e.g. 1e10/spill 10 s extraction 18 as soon as possible in 2006, e.g. 1st block (we only use the standard FRS setup at S4) P10 No standard FRS vacuum windows No No 132Xe through 5 meters of air 4000 V / 2 mA No No No 27.11.2006 07.12.2006 prio:2 text:"S294, J. Benlliure/K.-H. Schmidt, 238U, 950 MeV/u,2e9/spill, 10 s extraction, FRS" 03.06.2005 27.01.2010
1830 09.06.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de       parasite, 1:3 HTA secondary protons - p > 2 GeV/c 1e5 protons/spill spill=4s total 4.5, in 2 runs: 2+2.5 March /April 2006           protons through 30 cm air max. 1kV       20.04.2007 24.04.2007 prio:2 text:"S280, Berdermann, 1H (MUCIS), > 2 GeV, 1e5/spill, spill=4s, 1:10 block mode, HTA , 09.06.2005 27.01.2010
1256 20.06.2005 S291 Residual radioactivity induced by U ions - experimental investigation and longtime predictions Mustafin 24-01 E.Mustafin@gsi.de       main HTA U   950 MeV/u up to 1e8/spill of SIS   20             U ions goes through air, path-length is about 30 cm         23.02.2006 24.02.2006 prio:1 text:"S291, Mustafin, U (PIG), 950 MeV/u, 1e8/spill, HTA" 20.06.2005 27.01.2010
1253 09.06.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de       parasite, 1:3 HTA secondary protons - p > 2 GeV/c 1e5 protons /spill spill=4 s 3 Autumn 2005; not 16-Oct-24-Oct-2005           protons through 30 cm air 100V - 400 V       01.11.2005 05.11.2005 prio:3 text:"S280, Berdermann, protons (MUCIS), > 2 GeV/c, 1e5 /spill, 4 s extraction, HTA" 09.06.2005 27.01.2010
1257 28.06.2005 U190 Stopping power measurements... Golubev ITEP alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite Z6 40 Ar   5.9 MeV/u high intensity   3 days (6 shifts daytime) 03 - 05. 11. 2005             pulse generator for fast valves, 2 kV       08.11.2005 10.11.2005 prio:2 text:"U190, Golubev/Weyrich, 40 Ar (PIG), 5.9 MeV/u, high intensity, Z6" 28.06.2005 27.01.2010
1258 28.06.2005 U190 Stopping power measurements... Golubev ITEP alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite Z6 12 C   5.9 MeV/u high intensity   2 days (3-4 shifts nighttime after therapy) 06. - 07. 11. 2005             pulse generator for fast valves, 2 kV       01.11.2005 03.11.2005 prio:2 text:"U190, Golubev/Weyrich, 12C (ECR), 5.9 MeV/u, high intensity, Z6" 28.06.2005 27.01.2010
1250 09.11.2004 E000   Steck 2406 m.steck@gsi.de       parasite ESR 208Pb   400 MeV/u   SIS cooler, deceleration in ESR to 140 MeV/u 6 July 26-29 H2 target                   26.07.2005 29.07.2005 prio:2 text:"E000, Steck, 208Pb(PIG), 400 MeV/u, SIS cooler, deceleration in ESR to 140 MeV/u, ESR" 09.11.2004 27.01.2010
1217 24.02.2005 S302 HED matter generated by intense heavy ion beams Mintsev   minvb@icp.ac.ru Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT U, Pb   300-400 MeV/u 2e9-1e10 (max) fast extraction, bunch compression 10-30 autumn and winter 2005                     30.11.2005 07.12.2005 prio:3 text:"S302, Mintsev/Varentsov, U(PIG), 300-400 MeV/u, 2x10^9, fast extraction, bunch compression, HHT" 24.02.2005 27.01.2010
1216 16.03.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 12C   11.4 MeV/u 2 pnA 5ms pulse 9 18.-20.7..2005                     18.07.2005 20.07.2005 prio:1 text:"UBIO, Scholz, 12C, 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 16.03.2005 27.01.2010
1233 04.05.2005 S308 g-factor of the 11- isomer in 196-Po A. Maj, J. Gerl +48126628141 Adam.Maj@ifj.edu.pl J. Gerl 2643 j.gerl@gsi.de main FRS 238U 73+ ? 750 MeV/u minimum 0.05 pnA slow extraction (4s) 15 November/December 2005 no no no no gamma sources yes no no no no 28.11.2005 29.11.2005 prio:2 text:"S308, Maj, / Gerl, 238U (PIG), 750 MeV/u, 2x10^9, 4s extraction, FRS" 04.05.2005 27.01.2010
1227 26.04.2005 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de main (or parasite if available) X1 40Ar   ca. 7.5 MeV/u >= 500 pnA, 50 Hz if possible 5 ms 4 x 3 shifts November 2005, at least one day break between each set of 3 shifts 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus)   Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber       open radioactivity 10.11.2005 11.11.2005 prio:1 text:"U182, Kratz/Schaedel, 40Ar (PIG), 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 26.04.2005 27.01.2010
1228 29.04.2005 E013/E017 Beta decay of highly charged ions Bosch 2713 f.bosch@gsi.de       after commissioning 1 shot/10 min ESR 142Nd (PIG)   450 MeV/u 1e8/spill SIS-cooler 12 June 2 - June 7                     02.06.2005 06.06.2005 prio:1 text:"E013/E017, Bosch, 142Nd (PIG), 450 MeV/u, 1e8/spill, SIS-cooler, SIS/ESR" 29.04.2005 27.01.2010
1234 04.05.2005 S311 spin-alignment and g-factors of isomeric states G. Neyens, G. Simpson 003216327216 gerda.neyens@fys.kuleuven.ac.be J. Gerl 2643 j.gerl@gsi.de main FRS 238U 73+ ? 750 MeV/u minimum 0.05 pnA slow extraction (4s) 27 November/December 2005 no no no no gamma sources yes no no no no 16.10.2005 24.10.2005 prio:1 text:"S311, Neyens, Simpson/Gerl, 238U (PIG) 73+, 750 MeV/u, 2x10^9, slow extraction (4s), FRS" 04.05.2005 27.01.2010
1240 17.05.2005 E012 Direct Mass Measurements Wollnik   Hermann.Wollnik@exp2.physik.uni-giessen.de Litvinov 2142 y.litvinov@gsi.de Test, Parasite ESR Pb (PIG)   400-600 MeV/u 1e8/spill SIS cooler, fast extraction 6, without nights   no no no no no no no no no no 16.09.2005 25.09.2005 prio:2 text:"E012, Wollnik/Litvinov, U(PIG), 400-600 MeV/u, 1e8/spill, SIS cooler, fast extraction, FRS, ESR" 17.05.2005 27.01.2010
1810 26.10.2004 S247 Study of nuclear density distributions in light halo-nuclei by proton elastic scatering in inverse kinematics Khanzadeev +7 81371 46741, 2662 khanzade@pnpi.spb.ru p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de parasite HTC 12C   700 MeV/u 1e5/spill   36 last block 2005, 5 days before main run target H2, 500 l at 10 bar no two 0.5 mm Be window, 80 mm diameter ALADIN magnet, IKAR chamber 241Am inside IKAR chamber, 1e-10 Cu 5 m air, 1.6 m H2 10 bar, <1e5/spill, 700 Mev/u 15 kV, 1 uA       18.05.2006 28.05.2006 prio:1 text:"S247, Khanzadeev/Egelhof, 18O, 800 MeV/u, 1e11/spill, FRS/HTC" 26.10.2004 27.01.2010
1259 13.07.2005 UMAT Microprobe B. Fischer 2651 B.Fischer@gsi.de       main X0 Ni +/- 10 mass units nat. isotopes 4.8 MeV/u max. max. macro-pulse; high energy definition 9 Oct. 05 as soon as possible no no vacuum window 1 mm² as usual no no beam going 50 µm through air no no no no 24.11.2005 27.11.2005 prio:1 text:"UMAT, B. Fischer, Ni (PIG), 4.8 MeV/u, 5ms, high en. def., X0" 13.07.2005 27.01.2010
1265 15.07.2005 E039 Precision X-Ray Spectroscopy Beyer 2140 h.beyer@gsi.de Egelhof 2662 p.egelhof@gsi.de parasitic ESR 238 U   90 MeV/u 5e8 (ESR)   12 ( 6 for preparation, 6 for experiment ) October 2005     X-ray window at interaction chamber Americium source         liquid helium operation 17.10.2005 20.10.2005 prio:3 text:"E039, Beyer/Egelhof, U(PIG), 400 MeV/u dec to 90 MeV/u, 5e8 (ESR), ESR" 15.07.2005 27.01.2010
1266 15.07.2005 E064 Light-ion induced reactions in storage rings Chartier +44 151 794 6775/ 3348 mc@ns.ph.liv.ac.uk Egelhof 2662 p.egelhof@gsi.de parasite ESR any beam available   400 MeV/u maximum, at least1e8 stored particles   15 november/december internal hydrogen target                   02.12.2005 05.12.2005 prio:2 text:"E064, Chartier/Egelhof, 132Xe (MUCIS), 400 MeV/u, >1e8 stored particles, ESR" 15.07.2005 27.01.2010
1272 26.10.2004 S247 Study of nuclear density distributions in light halo-nuclei by proton elastic scatering in inverse kinematics Khanzadeev +7 81371 46741, 2662 khanzade@pnpi.spb.ru p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de main HTC 12C, 18O 18O 800 MeV/u >1e11/spill   22 shifts 12C + 36 shifts 18O, 3 days rest in between last block 2005, 5 days after parasitic run target H2, 500 l at 10 bar no two 0.5 mm Be window, 80 mm diameter ALADIN magnet, IKAR chamber 241Am inside IKAR chamber, 1e-10 Cu 5 m air, 1.6 m H2 10 bar, <1e5/spill, 700 Mev/u 15 kV, 1 uA       14.11.2005 24.11.2005 prio:2 text:"S247, Khanzadeev/Egelhof, 12C (ECR), 800 MeV/u, 10^9/spill, nights only, FRS/HTC" 26.10.2004 27.01.2010
1273 04.05.2005 S308 g-factor of the 11- isomer in 196-Po A. Maj, J. Gerl +48126628141 Adam.Maj@ifj.edu.pl J. Gerl 2643 j.gerl@gsi.de main FRS 238U 73+ ? 750 MeV/u minimum 0.05 pnA slow extraction (4s) 15 November/December 2005 no no no no gamma sources yes no no no no 30.11.2005 04.12.2005 prio:1 text:"S308, Maj, / Gerl, 238U (PIG), 750 MeV/u, 2x10^9, 4s extraction, FRS" 04.05.2005 27.01.2010
1274 24.02.2005 S302 HED matter generated by intense heavy ion beams Mintsev   minvb@icp.ac.ru Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT U, Pb   300-400 MeV/u 2e9-1e10 (max) fast extraction, bunch compression 10-30 autumn and winter 2005                     17.10.2005 24.10.2005 prio:2 text:"S302, Mintsev/Varentsov, U(PIG), 300-400 MeV/u, 2x10^9, fast extraction, bunch compression, HHT" 24.02.2005 27.01.2010
1267 20.07.2005 U213 ion-plasma interaction Blazevic 2294 a.blazevic@gsi.de Blazevic 2294 a.blazevic@gsi.de parasite Z6 26Mg5+(ECR)   5.0 250 pnA sharp in time 6 15.-17.8., 3 days (no nightshifts) - - - - - - - - - - 17.08.2005 19.08.2005 prio:2 text:"U213, Blazevic/Blazevic, 26Mg5+(ECR), 5.0, 250 pnA, sharp in time, Z6" 20.07.2005 27.01.2010
1122 03.11.2004 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth 2151 j.stroth@gsi.de main HAD 40Ca   2 AGeV 10^8 / spill 14 s extraction 84 4th block i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 16.09.2005 15.10.2005 prio:1 text:"S301, Salabura/Stroth, 40Ca (MEVVA) + 40Ar (MUCIS/CHORDIS), 2 AGeV, 1.8 AGeV, 10^8 / spill, 14 s extraction, HAD" 03.11.2004 27.01.2010
1123 03.11.2004 S291 Residual radioactivity induced by U ions - experimental investigation and longtime predictions Mustafin 24-01 E.Mustafin@gsi.de       main HTA U   100, 500 and 1000 MeV/u up to 1e9/spill of SIS   20             U ions goes through air, path-length is about 30 cm         30.05.2005 31.05.2005 prio:1 text:"S291, Mustafin, U (PIG), 100, 500 and 1000 MeV/u, up to 1e9/spill of SIS, Cave A" 03.11.2004 27.01.2010
1124 04.11.2004 S276 Investigation of the nuclear mean field by precision measurements of the spectator response to the participant blast Henzl ++49-6159-71-2433 v.henzl@gsi.de       main FRS 112Sn, 124Sn (both ECR) 112Sn, 124Sn both 1 A GeV > 2e+8 /spill 1-10s extraction 8 shifts + 1 day to set up FRS   P10 - 12l/hour   standard FRS vacuum windows installation of standard MUSIC detectors   5m through air / max 1e+4 per second / 1AGeV 10kV / 2mA       06.06.2007 07.06.2007 prio:1 text:"S276, Henzl, 124Sn (PIG), 1 A GeV, 1e+8 /spill, 1-10s extraction, FRS" 04.11.2004 27.01.2010
1125 05.11.2004 S244 isomer experiment Nb-82 Regan   p.regan@surrey.ac.uk Gerl   j.gerl@gsi.de main S4 Mo-92   750 max spill flat long extraction 21 October/November 2005                     25.02.2006 01.03.2006 prio:1 text:"S244, Regan/Gerl, 107Ag(MEVVA), 750 MeV/u, max, spill flat long extraction, FRS-S4" 05.11.2004 27.01.2010
1128 05.11.2004 S299 isomer experiment Pb<208 Podolyak   z.podolyak@surrey.ac.uk Gerl   j.gerl@gsi.de main S4 Pb-208   750 max spill flat long extraction 21 October/November 2005                     02.03.2006 08.03.2006 prio:1 text:"S299, Podolyak/Gerl, 208Pb(PIG), 1 GeV/u, max I, spill flat long extraction, FRS-S4" 05.11.2004 27.01.2010
1130 08.11.2004 S297 Strange Baryons/Kaonic Clusters Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB protons   4.8 GeV 1e8/spill max. extraction 3 any time 2005, after Al production run Drift chambers (Ar, CH4, C4H8)   50 mu Ti exit window beam pipe     from exit window to Cave wall (15 m)         07.07.2005 09.07.2005 prio:2 text:"S297, Herrmann/Hildenbrand, p, 4.8 GeV, 1e8/spill, max. extraction, HTB" 08.11.2004 27.01.2010
1129 08.11.2004 S297 Strange Baryons/Kaonic Clusters Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB Al, 27+   2000 MeV/u (max.) 1e7/spill max. extraction 63 any time 2005, before protons Drift chambers (Ar, CH4, C4H8)   50 mu Ti exit window beam pipe     from exit window to Cave wall (15 m)         04.08.2005 22.08.2005 prio:1 text:"S297, Herrmann/Hildenbrand, Al27(PIG), 1900 MeV/u, 1e7/spill, max. extraction, HTB" 08.11.2004 27.01.2010
1131 08.11.2004 E000 ESR development Steck 2406 M.Steck@gsi.de       parasite ESR 48Ca (ECR) same as for U209 400 MeV/u min. 1e8/spill SIS cooler, single bunch 10 2005, January 17-25 (workdays, daytime only)                     17.01.2005 25.01.2005 prio:2 text:"E000, Steck, 48Ca (ECR), 400 MeV/u, 1e8/spill, SIS cooler, single bunch, ESR" 08.11.2004 27.01.2010
1138 10.11.2004 S286 Fast TRD tests Garabatos 2660 c.garabatos@gsi.de       main HTA 14N   2000 MeV/u 1e10/s   20 2nd half of 2005           p, pi, e, 1-2 GeV/c, 1e6/spill, 1 m 5 kV/100 microA       06.02.2006 15.02.2006 prio:2 text:"S286, Garabatos, 14N, 2000 MeV/u, 3e10/spill, HTD" 10.11.2004 27.01.2010
1132 09.11.2004 E000   Steck 2406 m.steck@gsi.de       main ESR 238U92+   400 MeV/u   SIS cooler, deceleration in ESR to 140 MeV/u 6 December 6 and 7 H2 target                   06.12.2004 07.12.2004 prio:2 text:"E000, Steck, 238U92+, 400 MeV/u, SIS cooler, deceleration in ESR to 140 MeV/u, ESR" 09.11.2004 27.01.2010
1133 09.11.2004 S262 Machine development Salabura 0048-12-6324888 salabura@if.uj.edu.pl Simon 2657 r.simon@gsi.de main HAD, HTC N7+   2 GeV/u space charge limit 1.4 10^11 flat top SIS extraction efficiency > 85%, 4s extraction 6 day shifts 2005, starting with 2nd block           4 x 10^6 secondary pions, 1 GeV/c, air, 5 m       monitor radiation level in NE5 01.08.2005 03.08.2005 prio:1 text:"S262, Salabura/Simon, N7+, 2 GeV/u, 2shifts/day, space charge limit 1.4 10^11 flat top SIS, extraction efficiency > 85%, 4s extraction, HAD, HTC" 09.11.2004 27.01.2010
1134 09.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Ca   11.4 MeV/u 2 pnA 5ms 9 17.1.2005     Hostaphan exit window     Ca 11 MeV/u, ~50mm air         17.01.2005 19.01.2005 prio:2 text:"UBIO, Scholz, 48Ca (ECR), 11.4 MeV/u, 2 pnA, 5ms, X6" 09.11.2004 27.01.2010
1135 09.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 12C   11.4 MeV/u 2 pnA 5ms 9 14.2.2005     Hostaphan exit window     12C 11 MeV/u, ~50mm air         18.02.2005 20.02.2005 prio:2 text:"UBIO, Scholz, 12C (ECR), 11.4 MeV/u, 2 pnA, 5ms, X6" 09.11.2004 27.01.2010
1136 09.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Ni...Xe   11.4 MeV/u 2 pnA 5ms 6 17.2.2005     Hostaphan exit window     Ni...Xe 11 MeV/u, ~50mm air         02.03.2005 03.03.2005 prio:2 text:"UBIO,Scholz, 54Cr (ECR), 11.4 MeV/u, 2 pnA, 5 ms, X6" 09.11.2004 27.01.2010
1137 09.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 U   11.4 MeV/u 2 pnA 5ms 9 1.3.2005     Hostaphan exit window     U 11 MeV/u, ~50mm air         10.03.2005 11.03.2005 prio:2 text:"UBIO, Scholz, 152Sm (PIG), 11.4 MeV/u, 2 pnA, 5ms, X6" 09.11.2004 27.01.2010
1139 18.10.2004 U211 Even-even nucleus 260Sg Sulignano 2736 B.Sulignano@gsi.de       main Y7 54Cr 54Cr 5.0 MeV/u 1 pmicroA   63 early in 2005, after 48Ca/Hofmann   alcohol for cooling         +-300 kV SHIP high voltage       16.09.2005 23.09.2005 prio:1 text:"U211, Sulignano, 54Cr (ECR), 5.0 MeV/u, 1 pmicroA, Y7" 18.10.2004 27.01.2010
1835 11.11.2004 E053 Laser cooling of C3+ ion beams... Schramm 089/28914063 ulrich.schramm@physik.uni-muenchen.de Steck 2406 m.steck@gsi.de parasite ESR 12C3+   120 MeV/u >=1e8/spill in SIS SIS cooler 18 2005, block 2                 yes   03.04.2006 08.04.2006 prio:2 text:"E053, Schramm/Steck, 12C3+ (PIG), 120 MeV/u, >=1e8/spill in SIS, SIS cooler, ESR" 11.11.2004 27.01.2010
1142 16.11.2004 E047/U161 commissioning spectrometer Hagmann -2437 s.hagmann@gsi.de       parasitic X4 C......Xe with q from 1.4 AMeV   3.6 1nA, large duty cycle good collimation 2 times 6 shifts 1st block 2005                     24.01.2005 25.01.2005 prio:2 text:"E047/U161, Hagmann, 48Ca7+ (ECR), 3.6 MeV/u, 1nA, large duty cycle, good collimation, X4" 16.11.2004 27.01.2010
1143 16.11.2004 U074 Energy loss of ions in dense plasmas Blazevic 2294 a.blazevic@gsi.de Wahl 2291 h.wahl@gsi.de parasite Z6 Ar   4.0 MeV/u 500 pnA, single pulses low energy- and time-spread 15 21. - 24. 2. 2005 - - - - - - - - - - 22.02.2005 26.02.2005 prio:2 text:"U074, Blazevic/Wahl, 40Ar (PIG), 4.0 MeV/u, 500 pnA, single pulses, low energy- and time-spread, Z6" 16.11.2004 27.01.2010
1141 12.11.2004 E043 Charge transfer from complex targets... Braeuning-Demian 2711 a.braeuning-demian@gsi.de       main X4 U73+ (PIG) or Pb   11.4 MeV/u   5 ms, 50 Hz 12 January 2005                     07.02.2005 10.02.2005 prio:1 text:"E043, Braeuning-Demian, 238U73+ (PIG) , 11.4 MeV/u, 5 ms, 50 Hz, X4" 12.11.2004 27.01.2010
11029 27.01.2010 UMAT X0 Severin 2715 d.severin@gsi.de Trautmann 2716 c.trautmann@gsi.de parasite X0 Sm   11.4   5Hz, lange Pulse 9 15. - 17.4.09                     22.04.2010 24.04.2010 prio:2 text:"UMAT, Severin/Trautmann, 152Sm, 4,8 MeV/u, 5Hz, 1ms, X0" 27.01.2010 15.04.2010
1144 17.11.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       main X0 12C   4.8 MeV/u max intensity sharp energy, long pulse 9 2005 block 1                     11.02.2005 14.02.2005 prio:1 text:"UMAT, Fischer, 12C (ECR), 4.8, 11.4 MeV/u, max intensity, sharp energy, long pulse, X0" 17.11.2004 27.01.2010
1145 17.11.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       main X0 58Ni   3 MeV/u max intensity sharp energy, long pulse 9 2005 block 1                     15.02.2005 17.02.2005 prio:1 text:"UMAT, Fischer, 58Ni (PIG), 3.6 MeV/u, max intensity, sharp energy, long pulse, X0" 17.11.2004 27.01.2010
1146 03.11.2004 S291 Residual radioactivity induced by U ions - experimental investigation and longtime predictions Mustafin 24-01 E.Mustafin@gsi.de       main HTA U   100, 500 and 1000 MeV/u up to 1e9/spill of SIS   20             U ions goes through air, path-length is about 30 cm         27.05.2005 28.05.2005 prio:1 text:"S291, Mustafin, U (PIG), 100, 500 and 1000 MeV/u, up to 1e9/spill of SIS, Cave A" 03.11.2004 27.01.2010
1148 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 U   11.4 MeV/u     6 Feb 2005                     05.02.2005 06.02.2005 prio:1 text:"UMAT, Trautmann, 238U (PIG), 11.4 MeV/u, 5 ms, X0" 18.11.2005 27.01.2010
1149 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Sm   11.4 MeV/u     9 Mar 2005                     12.03.2005 14.03.2005 prio:2 text:"UMAT, Trautmann, 152Sm (PIG), 11.4 MeV/u, X0" 18.11.2005 27.01.2010
1150 18.11.2004 U068 Test of calorimetric detectors Egelhof 2662 p.egelhof@gsi.de Kraft-Bermuth 2650 s.kraft@gsi.de parasite X8 12C   1.4 or 4.8 50 pnA   6-9 Block 1, 2005   liquid helium pumped He4 cryostat cryostat           liquid helium operation 29.01.2005 30.01.2005 prio:1 text:"U68, Egelhof/Kraft-Bermuth, 12C (ECR), 3.6 MeV/u, 50 pnA, X8" 18.11.2004 27.01.2010
1151 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA 86Kr   300 MeV/u     6 14-15.4.2005                     15.04.2005 16.04.2005 prio:2 text:"SMAT, Trautmann, Kr (MUCIS), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1153 19.11.2004 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 40Ar   ca. 7.5 MeV/u >= 500 pnA, 5 Hz 5 ms 2 shifts (daytime) 23. Feb 2005 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus)   Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber       open radioactivity 23.02.2005 23.02.2005 prio:3 text:"U182, Kratz/Schaedel, 40Ar (PIG), 7.5 MeV/u, 500 pnA, 5 Hz, 5 ms, X1" 19.11.2004 27.01.2010
1152 19.11.2004 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 40Ar   ca. 7.5 MeV/u >= 500 pnA, >= 5 Hz ( 50 Hz if possible) 5 ms 2 shifts (daytime) 25. Feb 2005 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus)   Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber       open radioactivity 25.02.2005 25.02.2005 prio:3 text:"U182, Kratz/Schaedel, 40Ar (PIG), 7.5 MeV/u, 500 pnA, 50 Hz, 5 ms, X1" 19.11.2004 27.01.2010
1154 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA 86Kr   300 MeV/u     6 14-15.4.2005                     05.06.2005 06.06.2005 prio:2 text:"SMAT, Trautmann, U (MEVVA), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1156 24.11.2004 E064 Light-ion induced reactions in storage rings Chartier +44 151 794 6775/ 3348 mc@ns.ph.liv.ac.uk Egelhof 2662 p.egelhof@gsi.de parasite ESR 86 Kr   400 MeV/u 1e8 stored particles   12 7.-10.4. 2005 internal hydrogen target                   07.04.2005 10.04.2005 prio:2 text:"E064, Chartier/Egelhof, 78 Kr (MUCIS), 400 MeV/u, 1e8 stored particles, ESR" 24.11.2004 27.01.2010
1155 16.11.2004 E047/U161 commissioning spectrometer Hagmann -2437 s.hagmann@gsi.de       parasitic X4 C......Xe with q from 1.4 AMeV   3.6 1nA , large duty cycle good collimation 6 shifts 1st block 2005                     26.02.2005 27.02.2005 prio:1 text:"E047/U161, Hagmann, 40Ar (PIG), 3.6 MeV/u, 50 Hz, 5 ms, good collimation, X4" 16.11.2004 27.01.2010
1157 26.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 48Ca   11.4 MeV/u 2 pnA 5ms pulse 6 7.-8.4.2005                     03.05.2005 04.05.2005 prio:2 text:"UBIO, Scholz, 48Ca (ECR), 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 26.11.2004 27.01.2010
1158 26.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 86Kr   11.4 MeV/u 2 pnA 5ms pulse 6 18.-20.4.2005                     15.04.2005 17.04.2005 prio:2 text:"UBIO, Scholz, 86Kr (MUCIS), 11.4 MeV/u, 2 pnA, max pulse length, X6" 26.11.2004 27.01.2010
1159 26.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 58Ni   11.4 MeV/u 2 pnA 5ms pulse 9 2.-4.5..2005                     22.04.2005 24.04.2005 prio:2 text:"UBIO, Scholz, 58Ni (PIG), 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 26.11.2004 27.01.2010
1160 26.11.2004 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 238U   11.4 MeV/u 2 pnA 5ms pulse 9 18.-20.5..2005                     11.05.2005 13.05.2005 prio:2 text:"UBIO, Scholz, 238U (PIG), 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 26.11.2004 27.01.2010
1161 26.11.2004 SBIO   Scholz 1340 m.scholz@gsi.de       therapy nights HTM 12C   100-400 MeV/u 2e8/spill therapy conditions 6 (prob. 3 full nights, 3 half nights) 1.-6.7.2005                     30.06.2005 05.07.2005 prio:2 text:"SBIO, Scholz, 12C (ECR), 100-400 MeV/u, 2e8/spill, nights, last 3 nights only 1/2, therapy conditions, HTM" 26.11.2004 27.01.2010
1162 26.11.2004 SBIO   Scholz 1340 m.scholz@gsi.de       therapy nights HTM 12C   100-400 MeV/u 2e8/spill therapy conditions 6 (prob. 3 full nights, 3 half nights) 1.11.-21.11.2005                     08.11.2005 13.11.2005 prio:2 text:"SBIO, Scholz, 12C (ECR), 100-400 MeV/u, 2e8/spill, nights, last 3 nights only 1/2, therapy conditions, HTM" 26.11.2004 27.01.2010
1164 29.11.2004 E067 Test of Time Dilation at the ESR Karpuk, Sergej +49 6131 39 25982 karpuk@uni-mainz.de Nörtershäuser, Wilfried +49 6159 71 2459 W.Noertershaeuser@gsi.de ? ESR 7Li+,   58.86 MeV/u >10 muA in ESR UNILAC Stripper to produce metastable ions 3x21 1) Nov/Dec 2005 2)Feb/Mar 2006 3)May/June 2006               1W@200MHz Diode Laser (776nm, 500mW)   21.10.2005 24.10.2005 prio:3 text:"E067, Karpuk/Nörtershäuser, 7Li+ (ECR), 58.86 MeV/u, >10 uA in ESR, UNILAC Stripper to produce metastable ions, ESR" 29.11.2004 27.01.2010
1165 30.11.2004 U190 Stopping power measurements... Golubev ITEP alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite Z6 12C   5.9 MeV/u high intensity   2 days (shifts when therapy does not run) 05. + 06. 02. 2005             pulse generator for fast valves, 2 kV       29.01.2005 30.01.2005 prio:2 text:"U190, Golubev/Weyrich, 12C, 5.9 MeV/u, high intensity, Z6" 30.11.2004 27.01.2010
1166 30.11.2004 U190 Stopping power measurements... Golubev ITEP alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite Z6 136 Xe   5.9 MeV/u high intensity   2 days (4 shifts daytime) 03. + 04. 03. 2005             pulse generator for fast valves, 2 kV       03.03.2005 04.03.2005 prio:3 text:"U190, Golubev/Weyrich, 136 Xe, 5.9 MeV/u, high intensity, Z6" 30.11.2004 27.01.2010
1800 01.12.2004 S245 Studies of bound and unbound nuclei near and at the driplines Jonson +46 31 772 3262 bjn@fy.chalmers.se Simon 2887 h.simon@gsi.de main FRS 40Ar   900-1000 MeV/u max normal long extraction 30 has to be scheduled with S277 R.Krücken beg. 2006           see S277 at S2         19.04.2006 27.04.2006 prio:1 text:"S245, Jonson/Simon, 40Ar, 900-1000 MeV/u, max I, normal long extraction, FRS-S2" 01.12.2004 27.01.2010
1168 03.12.2004 S286 Alice Garabatos 2660 c.garabatos@gsi.de Andronic 2769 a.andronic@gsi.de therapy nights (most probably) HTD 12C (most probably); a heavier beam is desirable though   2000 MeV/u 1e10/s   9 2nd half of 2005           pi/e and C, 1-2 GeV/c, 1e6/spill, 1-2 m 2.5 kV/100 microA       27.10.2005 31.10.2005 prio:3 text:"S286, Garabatos/Andronic, 12C, 2000 MeV/u, 1e10/s, HTD" 03.12.2004 27.01.2010
1171 07.12.2004 S000 beamline test Niebur 2641 W.Niebur@gsi.de       parasite HTD 12C   2 GeV/u     6 7-9.02.2005                     07.02.2005 09.02.2005 prio:3 text:"HTD beamline test, Niebur, 12C, 2 GeV/u (if not possible, 850 MeV/u), days, HTD" 07.12.2004 27.01.2010
1170 06.12.2004 S296 Quasifree Hadronic Scattering Studies of Exotic Nuclei Lemmon +44 (0)1925 603926 R.Lemmon@dl.ac.uk Aumann   T.Aumann@gsi.de main HTC 012 C6+   700 MeV/u 1e5/spill (SIS)   27 Block 4 : September 14 - November 24, 2005 We use the LAND/ALADIN setup (liquid hydrogen target, isobutane gas detectors, etc.)                   27.09.2007 09.10.2007 prio:2 text:"S296, Lemmon/Aumann, 12C6+, 700 MeV/u, 1e5/spill, HTC" 06.12.2004 27.01.2010
1174 22.12.2004 S271 2 proton decay of 19Mg Mukha 0032 16 235273 Ivan.Mukha@fys.kuleuven.ac.be Suemmerer 2737 k.suemmerer@gsi.de parasite! therapy days and/or nights FRS 12C (ECR)   350 MeV/u 1e9/spill   <=7 Block 4/2004                     06.11.2005 07.11.2005 prio:2 text:"S271, Mukha/Suemmerer, 12C (ECR), 350 MeV/u, 1e9/spill, FRS" 22.12.2004 27.01.2010
1175 13.01.2005 S251 FOPI Upgrade Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de parasite HTB Ni 28+   1900 MeV/u 5e7/spill long extraction 1/10 time of main user parallel to S287, 2nd block 2005 Gas detector test (10 l volume) flushed by non-inflammable mixture   50 mum Ti beam exit window (50 mm dia) no no from window to rear wall of Cave B no no no no 22.04.2005 25.04.2005 prio:2 text:"S251, Herrmann/Hildenbrand, Ni 28+, 1900 MeV/u, 5e7/spill, long extraction, HTB" 13.01.2005 27.01.2010
1172 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Kr   11.4 MeV/u     9 Apr 2005                     23.02.2006 25.02.2006 prio:1 text:"UMAT, Trautmann, 238U (PIG), 11.4 MeV/u, short pulses, X0" 18.11.2005 27.01.2010
1176 13.01.2005 S297 Strange Baryons/Kaonic Clusters Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB protons   4.8 GeV 1e8/spill long extraction 21 4th block 2005 (before October 31) FOPI drift chambers (Ar, C4H8, CH4) liquid deuterium target 50 mum Ti beam exit window no no from window to rear wall of Cave B no no no no 27.10.2005 05.11.2005 prio:2 text:"S297, Herrmann/Hildenbrand, protons (MUCIS), 3.6 GeV, 1e8/spill, long extraction, HTB" 13.01.2005 27.01.2010
1177 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite HTP 152Sm(PIG)   various   low duty cycle                         08.03.2005 12.03.2005 prio:3 text:"M001, Scheeler, 152Sm (PIG), various energies, low duty cycle, HTP" 08.09.2004 27.01.2010
1178 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite Z6 (PIG)   various   low duty cycle                         02.03.2005 04.03.2005 prio:4 text:"M001, Scheeler, (PIG), various energies, low duty cycle, Z beam line" 08.09.2004 27.01.2010
1179 06.12.2004 S295 Photodissociation experiments of astrophysical interest Zilges 06151 162925 zilges@ikp.tu-darmstadt.de Sümmerer 2737 k.suemmerer@gsi.de main HTC 94,100Mo   600 MeV/u 1e9/spill slow extraction 24 Block III 2005 (same setup in Cave C as S287)     large vaccum window behind ALADIN (~1m^2)     Mo, 500 MeV/u, <10^5/spill, air, 5m         18.05.2005 26.05.2005 prio:1 text:"S295, Zilges/Sümmerer, 94,100Mo (MEVVA), 600 MeV/u, 1e9/spill, slow extraction, FRS/HTC" 06.12.2004 27.01.2010
1181 17.02.2005 E039 Precision X-Ray Spectroscopy Beyer 2140 h.beyer@gsi.de Beyer 2140 h.beyer@gsi.de parasitic ESR 189Au79+ (ECR)   108 MeV/u 5e8 (ESR) > 6 weeks preparation time inside ESR 45 after November 2005   Be-windows at ESR gas jet   Pb shielding of FOCAL spectrometers             27.02.2006 12.03.2006 prio:2 text:"E039, Beyer, 208Pb (PIG), 108 MeV/u, 5e8 (ESR), > 6 weeks preparation time inside ESR, ESR" 17.02.2005 27.01.2010
1295 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA 86Kr   300 MeV/u     6 14-15.4.2005                     16.10.2005 16.10.2005 prio:2 text:"SMAT, Trautmann, U (MEVVA), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1305 13.10.2005 S305 Fragmentation of 136Xe Jungclaus 0034-914977654 andrea.jungclaus@uam.es Wollersheim 2670 h.j.wollersheim@gsi.de main FRS 136Xe ECR 136Xe 1 GeV/u 1e10/spill flat spil, slow extraction 21 May 2006 within RISING stopped beam                     23.06.2006 25.06.2006 prio:1 text:"S305, Jungclaus/Wollersheim, 136Xe (MUCIS), 1 GeV/u, FRS" 13.10.2005 27.01.2010
1184 17.02.2005 E016/U120 electron/recoil spectrometer test Hagmann 2437 s.hagmann@gsi.de Hagmann 2437 s.hagmann@gsi.de PARASITIC X4 any heavy > Ar, any q NO 3.6 1nA long pulses if possible 6 after 12 April, early -- -- -- -- -- -- -- -- -- -- 18.04.2005 20.04.2005 prio:2 text:"E016/U120, Hagmann, Ca 3.6 MeV/u, 1nA, long pulses if possible, X4" 17.02.2005 27.01.2010
1182 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 26.06.2005 26.06.2005 prio:1 text:"U210, Novikov/Schaedel, 2 shifts,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1183 17.02.2005 U189 Projectile spectroscopy Rosmej 1323 o.rosmej@gsi.de Korostiy 1301 s.korostiy@gsi.de parasitic Z6 Ca   5.9 Me V/u; 11.4 MeV/u 1-10 emicroA   18 25-26.04.2005; 4-8.05.2005                     28.04.2005 28.04.2005 prio:3 text:"U189, Rosmej/Korostiy, Ca, 5.9 Me V/u; 11.4 MeV/u, 1-10 emicroA, Z6" 17.02.2005 27.01.2010
1185 17.02.2005 U120/U161 Electron spectroscopy Hagmann 2437 s.hagmann@gsi.de   Hagmann s.hagmann@gsi.de MAIN X4 Ag -- 3.6 1nA large duty cacle 12 June 2005, shortly after 24. of June -- -- -- -- -- -- -- -- -- -- 27.06.2005 30.06.2005 prio:1 text:"U120/U161, Hagmann, Au(PIG), 3.6, 1nA, large duty cycle, X4" 17.02.2005 27.01.2010
1187 18.02.2005 E065 DR isotopic shift Brandau/Kozhuharov 2089/2718 c.brandau@gsi.de/c.kozhuharov@gsi.de Brandau/Kozhuharov 2089/2718 c.brandau@gsi.de/c.kozhuharov@gsi.de main ESR 142Nd57+, 150Nd57+   70 MeV/u 1e8/spill (SIS) SIS cooler 23 total (isotope change in the middle of the run)                       05.08.2005 12.08.2005 prio:2 text:"E065, Brandau/Kozhuharov/Brandau/Kozhuharov, 142Nd57+, 150Nd57+, 70 MeV/u, 1e8/spill (SIS), SIS cooler, ESR" 18.02.2005 27.01.2010
1188 13.01.2005 S251 FOPI Upgrade Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de parasite HTB Kr 36+   1900 MeV/u 5e7/spill long extraction 1/10 time of main user parallel to S287 / S214, 2nd block 2005 Gas detector test (10 l volume) flushed by non-inflammable mixture   50 mum Ti beam exit window (50 mm dia) no no from window to rear wall of Cave B no no no no 01.05.2005 06.05.2005 prio:2 text:"S251, Herrmann/Hildenbrand, 86Kr, 1900 MeV/u, 5e7/spill, long extraction, HTB" 13.01.2005 27.01.2010
1094 15.06.2004 S214 Bound states of eta and omega Gillitzer 02461-6112 A.Gillitzer@fz-juelich.de Weick 2158 H.Weick@gsi.de main FRS d   1750 MeV/u 2e11/spill parasitic test with C, Ni 1 GeV/u before 33 January 2005, not March/April C2H6, 1 cc/min         3-4 m 3He through the air 1.5 kV       10.07.2005 21.07.2005 prio:2 text:"S214, Gillitzer/Weick, d (MUCIS), 1750 MeV/u, 2e11/spill, FRS" 15.06.2004 27.01.2010
1189 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 17.07.2005 17.07.2005 prio:1 text:"U210, Novikov/Schaedel, 2 shifts,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1190 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 21.07.2005 21.07.2005 prio:1 text:"U210, Novikov/Schaedel, 2 shifts,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1191 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 03.07.2005 03.07.2005 prio:1 text:"U210, Novikov/Schaedel, 1.5 shift,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1192 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 10.07.2005 10.07.2005 prio:1 text:"U210, Novikov/Schaedel, 1.5 shift,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1193 17.02.2005 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasite X1 12C   6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 12 shifts 2 shifts on 26.6.,17.7.,21.7. +1.5shifts on 3.7.,6.7.,10.7. 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 13.07.2005 13.07.2005 prio:1 text:"U210, Novikov/Schaedel, 1.5 shift,12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 17.02.2005 27.01.2010
1195 21.02.2005 S260 AMS Ting   r.simon@gsi.de Simon 2657 r.simon@gsi.de main HTA Au or Pb   600 MeV/u 1e6/spill long extraction 6 nights july, august 2005                     24.06.2005 29.06.2005 prio:2 text:"S260, Ting/Simon, Au(PIG), 120, 180, 700MeV/u, 1e6/spill, nights only, HTA 21.02.2005 27.01.2010
1197 23.02.2005 U205 Decay properties near Z=108 and N=162 Tuerler 089-289-12202 andreas.tuerler@radiochemie.de Schaedel 2460 m.schaedel@gsi.de parasite X1 48Ca (ECR) 48Ca 7.2 MeV/u 1 pmicroA,,5 Hz 5 ms 13 from 25.4 to 29.4.2005 O2 100 ml/min in He no Be-window, irradiation in standard rotating target (248 Cm) wheel gas transport system X1->X1A no no 48Ca, 6 MeV/u, 1 pmicroA through 100 mm He, 1 bar no no no open radioactivity, 230,232 Th target wheel 25.04.2005 29.04.2005 prio:2 text:"U205, Tuerler/Schaedel, 48Ca (ECR), 7.2 MeV/u, 1 pmicroA,,5 Hz, 5 ms, X1" 23.02.2005 27.01.2010
1220 28.02.2005 U165 Molecular fragmentation Lutz / Werner 0521106 5352 werner@physik.uni-bielefeld.de Mann 2724 r.mann@gsi.de main X4 Z >= Xe (U, Pb, Bi,...) low q, high q ---- 3 ...8 AMeV > 100 pnA , 50 Hz 5 ms 9 (3 days)   N2, CO, CO2, < 1mbar none none none none not Low power detector supplies none none no 29.07.2005 31.07.2005 prio:1 text:"U165, Lutz / Werner/Mann, 132Xe (ECR), 3-8 AMeV, > 100 pnA , 50 Hz, 5 ms, X4" 28.02.2005 27.01.2010
1218 28.02.2005 SBIO Fragmentation in tissue-equivalent targets Schardt 2432 d.schardt@gsi.de d.schardt@gsi.de 2432 d.schardt@gsi.de parasite - therapy days HTA 12C   100-400 MeV/u 1e4-1e6/spill 4 s extraction 6 therapy block June/July 2005 no no vacuum window, Al 0.1 mm, 50mm diam. no no 12C, 1e4-1e6/spill, air, 4m no no no no 30.06.2005 05.07.2005 prio:3 text:"SBIO, Schardt, 12C, 100-400 MeV/u, 1e6/spill, 4 s extraction, HTA" 28.02.2005 27.01.2010
1196 06.05.2004 S287 Dipole strength in Ni isotopes Aumann 2668 t.aumann@gsi.de       main HTC 58Ni   700 MeV/u 1e7/spill   9 1st block 2005     thin vacuum window phi 50 cm     68Ni, 500 meV/u, 1e5/spill, 5 m air         22.04.2005 25.04.2005 prio:1 text:"S287, Aumann, 58Ni (PIG) 1e7/spill, 700 MeV/u, FRS/HTC" 06.05.2004 27.01.2010
1198 13.01.2005 S251 FOPI Upgrade Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de parasite HTB Mo   1900 MeV/u 5e7/spill long extraction 1/10 time of main user parallel to S293 , 2nd block 2005 Gas detector test (10 l volume) flushed by non-inflammable mixture   50 mum Ti beam exit window (50 mm dia) no no from window to rear wall of Cave B no no no no 18.05.2005 23.05.2005 prio:2 text:"S251, Herrmann/Hildenbrand, Mo, 1900 MeV/u, 5e7/spill, long extraction, HTB" 13.01.2005 27.01.2010
1207 02.03.2005 S249 Precise Measurement of Stopping Power Golubev   alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite HTA U   200, 500, 950 MeV/u 1e7/spill   8 28-30 May 2005                     28.05.2005 30.05.2005 prio:1 text:"S249, Golubev/Weyrich, U, 200, 500, 950 MeV/u, 1e7/spill, HTA" 02.03.2005 27.01.2010
1213 03.03.2005 U189 Projectile spectroscopy Rosmej 1323 o.rosmej@gsi.de Korostiy 1301 s.korostiy@gsi.de parasitic Z6 Ca   5.9 Me V/u; 11.4 MeV/u 1-10 emicroA   18 28-29.04.2005;( 3 shifts) 5-9.05.2005(15 Shifts)                     05.05.2005 09.05.2005 prio:2 text:"U189, Rosmej/Korostiy, Ca, 5.9 Me V/u; 11.4 MeV/u, 1-10 emicroA, Z6" 03.03.2005 27.01.2010
1226 09.11.2004 E000   Steck 2406 m.steck@gsi.de       main ESR 238U92+   400 MeV/u   SIS cooler, deceleration in ESR to 140 MeV/u 6 December 6 and 7 H2 target                   24.05.2005 29.05.2005 prio:2 text:"E000, Steck, 238U92+, 400 MeV/u, SIS cooler, deceleration in ESR to 140 MeV/u, ESR" 09.11.2004 27.01.2010
1200 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       21.04.2005 21.04.2005 prio:2 text:"U184, Mann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, X4" 16.10.2004 27.01.2010
1201 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       01.05.2005 02.05.2005 prio:2 text:"U184, Mann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, X4" 16.10.2004 27.01.2010
1202 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       10.05.2005 10.05.2005 prio:2 text:"U184, Mann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, X4" 16.10.2004 27.01.2010
1203 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       18.05.2005 22.05.2005 prio:2 text:"U184, Mann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, X4" 16.10.2004 27.01.2010
1204 16.10.2004 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       28.05.2005 31.05.2005 prio:2 text:"U184, Mann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, X4" 16.10.2004 27.01.2010
1205 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 U   11.4 MeV/u     9 Apr 2005                     14.05.2005 16.05.2005 prio:2 text:"UMAT, Trautmann, U (PIG), 11.4 MeV/u, max pulse length, X0" 18.11.2005 27.01.2010
1206 02.03.2005 S249 Precise Measurement of Stopping Power Golubev   alexander.golubev@itep.ru Weyrich 2291 k.weyrich@gsi.de parasite HTA U   200, 500, 950 MeV/u 1e7/spill   8 28-30 May 2005                     25.05.2005 26.05.2005 prio:3 text:"S249/S291, Golubev/Weyrich, U, 200, 500, 950 MeV/u, 1e7/spill, HTA" 02.03.2005 27.01.2010
1235 08.09.2004 M001 Dosimetry experiments Fehrenbacher 2007 U.Scheeler@gsi.de       parasite HTC d (MUCIS)   <400 MeV/u 2e8/spill low duty cycle                         11.07.2005 24.07.2005 prio:3 text:"M001, Dosimetry experiments, d (MUCIS), HTC" 08.09.2004 27.01.2010
1222 16.03.2005 U201 Commissioning of SHIPTRAP Quint 2141 w.quint@gsi.de Block 2742 m.block@gsi.de Main Y7 58Ni   4.36 MeV/u 100-500 pnA   9 September 2005   alcohol for cooling Window foil between SHIP and SHIPTRAP   239Pu, 241Am, 242Cm 1 microCi, Sf Source Cf         strong magnetic field, high beam current 07.10.2005 09.10.2005 prio:1 text:"U207, Quint/Block, 58Ni (PIG), 4.36 MeV/u, 100-500 pnA, Y7" 16.03.2005 27.01.2010
1210 09.11.2004 E000   Steck 2406 m.steck@gsi.de       parasite ESR 78Kr   400 MeV/u     12 December 6 and 7 H2 target                   11.04.2005 14.04.2005 prio:2 text:"E000, Steck, 78Kr, 400 MeV/u, SIS cooler, ESR" 09.11.2004 27.01.2010
1225 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Kr   11.4 MeV/u     9 Apr 2005                     27.07.2005 29.07.2005 prio:2 text:"UMAT, Trautmann, Pb (PIG), 11.4 MeV/u, short pulse length, X0" 18.11.2005 27.01.2010
1232 04.05.2005 S310 g-factors of isomeric states near Sn-100 D.L. Balabanski, M. Hass ++390737402523 dimiter.balabanski@unicam.it J. Gerl 2643 j.gerl@gsi.de main FRS 112Sn 50+ ? 600 MeV/u minimum 0.05 pnA slow extraction (4 s) 24 October 2005 no no no no gamma sources yes no no no no 05.12.2005 12.12.2005 prio:1 text:"S310, Balabanski, Hass/ Gerl, 112Sn (ECR), 600 MeV/u, 10e9/spill, 4s extraction, FRS" 04.05.2005 27.01.2010
1236 03.11.2004 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth 2151 j.stroth@gsi.de parasite HAD 27Al   1.9 AGeV 10^8 / spill 14 s extraction 21 week 5 - 6, 2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 15.08.2005 21.08.2005 prio:2 text:"S301, Stroth, 27Al (PIG), 2 GeV/u, 1e8/spill, 9 s extraction, 1:1 block mode, HAD" 03.11.2004 27.01.2010
1237 04.05.2005 S311 spin-alignment and g-factors of isomeric states G. Neyens, G. Simpson 003216327216 gerda.neyens@fys.kuleuven.ac.be J. Gerl 2643 j.gerl@gsi.de main FRS 238U 73+ ? 750 MeV/u minimum 0.05 pnA slow extraction (4s) 27 November/December 2005 no no no no gamma sources yes no no no no 12.10.2005 15.10.2005 prio:2 text:"S311, Neyens, Simpson/Gerl, 124Sn (ECR), 500 MeV/u, 1e6/spill, slow extraction (4s), FRS" 04.05.2005 27.01.2010
1264 13.05.2005 U212 UNILAC-Experiment of FP6/CARE/HIPPI Hofmann 2409 i.hofmann@gsi.de Groening 2344 la.groening@gsi.de Main UNILAC 40Ar1+, 40Ar10+   varying from 1.4 to 11.4 MeV/u up to 10 emA of 40Ar10+   25 between Jan.2006 and Sept.2006                     30.05.2006 05.06.2006 prio:1 text:"U212, Hofmann/Groening, 40Ar1+, 40Ar10+, varying from 1.4 to 11.4 MeV/u, up to 10 emA of 40Ar10+, HSI, DTL, TK" 13.05.2005 27.01.2010
1230 03.05.2005 U216 ERDA: Understanding Ion induced Desorption on Si Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU 54Cr (ECR) 54 Cr 1.4 MeV/u >=20 Hz   6 Week 23 during maschine exp. Ionisation Chamber, C4H10, 0.06 gas liters / h   standard vacuum glas window (4x)               07.06.2005 08.06.2005 prio:2 text:"U216, Bender, 54Cr (ECR), 1.4 MeV/u, >=20 Hz, UU" 03.05.2005 27.01.2010
1239 13.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Pb   11.4 MeV/u 2 pnA 5ms pulse 3 26.7.2005                     26.07.2005 26.07.2005 prio:2 text:"UBIO, Scholz, Pb, 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 13.05.2005 27.01.2010
1260 15.06.2004 S214 Bound states of eta and omega Gillitzer 02461-6112 A.Gillitzer@fz-juelich.de Weick 2158 H.Weick@gsi.de main FRS d   1750 MeV/u 2e11/spill parasitic test with C, Ni 1 GeV/u before 33 January 2005, not March/April C2H6, 1 cc/min         3-4 m 3He through the air 1.5 kV       07.07.2005 09.07.2005 prio:3 text:"S214, Gillitzer/Weick, d (MUCIS), 1750 MeV/u, 2e11/spill, FRS" 15.06.2004 27.01.2010
1262 26.04.2005 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de main (or parasite if available) X1 40Ar   ca. 7.5 MeV/u >= 500 pnA, 50 Hz if possible 5 ms 4 x 3 shifts November 2005, at least one day break between each set of 3 shifts 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus)   Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber       open radioactivity 08.11.2005 08.11.2005 prio:1 text:"U182, Kratz/Schaedel, 40Ar (PIG), 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 26.04.2005 27.01.2010
1300 11.08.2005 UBIO delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 Sn   3.6 MeV/u 1microA 5ms pulse 9 13,-15.10.2005 no no no no no no no no no no 13.10.2005 15.10.2005 prio:1 text:"UBIO, Scholz/Hagmann, Sn, 3.6 MeV/u, 1microA, 5ms pulse, X3" 11.08.2005 27.01.2010
1238 13.01.2005 S297 Strange Baryons/Kaonic Clusters Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB protons   4.8 GeV 1e8/spill long extraction 21 4th block 2005 (before October 31) FOPI drift chambers (Ar, C4H8, CH4) liquid deuterium target 50 mum Ti beam exit window no no from window to rear wall of Cave B no no no no 26.10.2005 26.10.2005 prio:1 text:"S297, Herrmann/Hildenbrand, protons (MUCIS), 3.6 GeV, 1e8/spill, long extraction, HTB" 13.01.2005 27.01.2010
1242 19.05.2005 U216 ERDA: Ion induced Electron Yields Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU 112Sn 112Sn 1.4 MeV/u maximum intensity   9 Week 49/50 Ionisation Chamber, C4H10, 0.06 gas liters / h   standard vacuum glas window (4x)               06.12.2005 08.12.2005 prio:1 text:"U216, Bender/Bender, 112Sn, 1.4 MeV/u, maximum intensity, UU" 19.05.2005 27.01.2010
1243 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de main Y7 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           15.11.2005 22.11.2005 prio:1 text:"U206, Andreyev/Hofmann, 52Cr (PIG), 5 MeV/u, 500 pnA, Y6" 11.04.2005 27.01.2010
1785 11.04.2005 U215 Reaction 30Si + 238U Nishio     Hofmann 2734/2685 s.hofmann@gsi.de main Y7 30Si   4.8-5.6 MeV/u 500 pnA   66 Sept. 2005 - May 2006     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           08.04.2006 01.05.2006 prio:1 text:"U215, Nishio/Hofmann, 30Si (ECR), 4.8-5.6 MeV/u, 500 pnA, Y7" 11.04.2005 27.01.2010
1208 26.05.2005 S304 SPALADIN Ducret +33 1 69087308 jean-eric.ducret@cea.fr Trautmann 2774 w.trautmann@gsi.de Main HTC 028 Si14+, 136Xe54+   500, 1000 MeV/u 30000 / spill 10 s extraction 24 shifts 4th block H, 300 l (STP), P10 (1m^3), closed volumes No Aladin magnet vacuum windows TPC MUSIC IV & TOF wall to install behind ALADIN No No 3000 V, 3 mA (phototube power supply) No No / 06.04.2009 13.04.2009 prio:1 text:"S304, Ducret/Simon, 136Xe54+, 500, 1000 MeV/u, PIG, 30000 / spill, 10 s extraction, HTC" 26.05.2005 27.01.2010
1209 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Cr   11.4 MeV/u 2 pnA 5ms pulse 9 20.9.-23.9.2005                     21.09.2005 23.09.2005 prio:2 text:"UBIO, Scholz, Cr(ECR), 11.4 MeV/u, 2 pnA, 5ms pulse, X6" 31.05.2005 27.01.2010
1211 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Sn   11.4 MeV/u 2 pnA 5ms pulse 9 10.-12.10.2005                     10.10.2005 12.10.2005 prio:1 text:"UBIO, Scholz, Sn(ECR), 11.4 MeV/u, 2 pnA, 5ms, X6" 31.05.2005 27.01.2010
1219 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 U   11.4 MeV/u 2 pnA 5ms pulse 9 19.21.10.2005                     20.10.2005 22.10.2005 prio:1 text:"UBIO, Scholz, U(PIG), 11.4 MeV/u, 2 pnA, 5ms, X6" 31.05.2005 27.01.2010
1224 31.05.2005 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 C   11.4 MeV/u 2 pnA 5ms pulse 9 21.-23.11.2005                     21.11.2005 23.11.2005 prio:2 text:"UBIO, Scholz, C (ECR), 11.4 MeV/u, 2 pnA, 5ms, X6" 31.05.2005 27.01.2010
1248 09.06.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de       parasite, 1:3, FRS main user FRS 84Kr and 131Xe - 100 MeV/u, 500 MeV/u and 1 GeV/u 1e9/spill spill=8s 18 spring or early summer 2006             max. 1kV       12.11.2006 17.11.2006 prio:3 text:"S280, Berdermann, 132Xe, 100 MeV/u, 500 MeV/u and 1 GeV/u, 1e8/spill, spill=8s, FRS" 09.06.2005 27.01.2010
1254 14.06.2005 U213 ion-plasma interaction Blazevic 2294 a.blazevic@gsi.de Blazevic 2294 a.blazevic@gsi.de parasite Z6 54Cr(ECR), mean charge state   5.0 250 pnA sharp in time 15 16. - 23. 9. 05 - - - - - - - - - - 16.09.2005 20.09.2005 prio:2 text:"U213, Blazevic/Blazevic, 54Cr(ECR), mean charge state, 5.0, 250 pnA, sharp in time, Z6" 14.06.2005 27.01.2010
1255 15.06.2005 S240 Response of GLAST calorimeter to relativistic ions Lott 33-5-57120890 lott@cenbg.in2p3.fr Trautmann 49-6159-712774 w.trautmann@gsi.de therapy night Cave C Carbon, deuteron   1700 MeV/u 1e4/spill   1 July           Air, 1 e4p/spill, path length: a few meters 1.5 kV, 15 mA       06.07.2005 06.07.2005 prio:2 text:"S240, Lott/Trautmann, Carbon, deuteron, 1700 MeV/u, 1e4/spill, Cave C" 15.06.2005 27.01.2010
1325 03.11.2005 S223 Coul.Diss. of 23Al Suemmerer 2737 k.suemmerer@gsi.de - - - Main HTC 36Ar - 350     36 >= July/August 2006 Ar/C2H6 (50%/50%) for drift chambers - - - - - - - - - 24.05.2007 04.06.2007 prio:1 text:"S223, Suemmerer, 36Ar (EZR), 350 MeV/u, HTC" 03.11.2005 27.01.2010
1275 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de main Y7 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           24.09.2005 25.09.2005 prio:1 text:"U206, Andreyev/Hofmann, 54Cr (ECR), 5 MeV/u, 500 pnA, Y6" 11.04.2005 27.01.2010
1278 25.07.2005 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Lange 2151, 2147 j.stroth@gsi.de, J.S.Lange@gsi.de parasite HAD 12C   0.8 AGeV 10^8 / spill 9 s extraction 8 17.11-24.11.2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 22.11.2005 24.11.2005 prio:3 text:"S301, Salabura/Stroth, 12C (ECR), 0.8 AGeV, 10^8 / spill, 9 s extraction, HAD" 25.07.2005 27.01.2010
1279 25.07.2005 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Lange 2151, 2147 j.stroth@gsi.de, J.S.Lange@gsi.de parasite HAD 12C   0.8 AGeV 10^8 / spill 9 s extraction 8 17.11-24.11.2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 25.11.2005 27.11.2005 prio:2 text:"S301, Salabura/Stroth, 12C (ECR), 0.8 AGeV, 10^8 / spill, 9 s extraction, HAD" 25.07.2005 27.01.2010
1280 26.04.2005 U182 Element 106 and 108 chemistry Kratz 06131-392-5704 j.kratz@gsi.de Schaedel 2460 m.schaedel@gsi.de main (or parasite if available) X1 40Ar   ca. 7.5 MeV/u >= 500 pnA, 50 Hz if possible 5 ms 4 x 3 shifts November 2005, at least one day break between each set of 3 shifts 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus)   Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber       open radioactivity 13.11.2005 13.11.2005 prio:1 text:"U182, Kratz/Schaedel, 40Ar (PIG), 7.5 MeV/u, >= 500 pnA, 50 Hz, 5 ms, X1" 26.04.2005 27.01.2010
1283 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 U   11.4 MeV/u     6 Feb 2005                     17.10.2005 19.10.2005 prio:1 text:"UMAT, Trautmann, 238U (PIG), 11.4 MeV/u, 1 ms, X0" 18.11.2005 27.01.2010
1284 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 U   11.4 MeV/u     6 Feb 2005                     01.12.2005 03.12.2005 prio:1 text:"UMAT, Trautmann, 238U (PIG), 11.4 MeV/u, 1 ms, X0" 18.11.2005 27.01.2010
1285 25.07.2005 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Lange 2151, 2147 j.stroth@gsi.de, J.S.Lange@gsi.de parasite HAD 12C   0.8 AGeV 10^8 / spill 9 s extraction 8 17.11-24.11.2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 14.11.2005 16.11.2005 prio:3 text:"S301, Salabura/Stroth, 12C (ECR), 0.8 AGeV, 10^8 / spill, 9 s extraction, HAD" 25.07.2005 27.01.2010
1287 13.05.2005 U212 UNILAC-Experiment of FP6/CARE/HIPPI Hofmann 2409 i.hofmann@gsi.de Groening 2344 la.groening@gsi.de Main UNILAC 40Ar1+, 40Ar10+   varying from 1.4 to 11.4 MeV/u up to 10 emA of 40Ar10+   25 between Jan.2006 and Sept.2006                     30.10.2006 03.11.2006 prio:2 text:"U212, Hofmann/Groening, 40Ar1+, 40Ar10+, MUCIS+PIG varying from 1.4 to 11.4 MeV/u, up to 10 emA of 40Ar10+, days only, HSI, DTL, TK" 13.05.2005 27.01.2010
1289 10.08.2005 E055 Direct mass measurements at FRS-ESR Scheidenberger 2706 c.scheidenberger@gsi.de Litvinov 2142 y.litvinov@gsi.de main ESR 238U   400-800 MeV/u 2e9/spill SIS cooler, ESR isochronous, fast extraction 60 2nd block 2006 no no no no no no no no no no 27.07.2006 08.08.2006 prio:1 text:"E055, Scheidenberger/Litvinov, 238U, 400-800 MeV/u, 2e9/spill, SIS cooler, ESR isochronous, fast extraction, ESR" 10.08.2005 27.01.2010
1291 10.08.2005 E055 Direct mass measurements at FRS-ESR Scheidenberger 2706 c.scheidenberger@gsi.de Litvinov 2142 y.litvinov@gsi.de parasite ESR 040 Ca   350-450 MeV/u 10particles/spill-1e8particles/spill SIS cooler, ESR isochronous, fast extraction 6 October 2005 no no no no no no no no no no 25.04.2007 29.04.2007 prio:3 text:"E055, Scheidenberger/Litvinov, 64Ni, 350-450 MeV/u, 10particles/spill-1e8particles/spill, SIS cooler, ESR isochronous, fast extraction, FRS-ESR" 10.08.2005 27.01.2010
1327 05.11.2005 STHE-PT07 ALTEA Narici +39 06 72594519 livio.narici@roma2.infn.it Schardt 06159 71 2432 D.Schardt@gsi.de main / therapy nights HTA C to Ni   100 to 800 MeV/n 1e2 to 1e4 and 1e9 1-3 ms spill for some irradiations 6                       16.02.2006 19.02.2006 prio:2 text:"SBIO-PT07, Narici/Schardt, 12C (ECR) 50Cr(PIG), 100 to 800 MeV/n, 1e2 to 1e4 and 1e9, 1-3 ms spill for some irradiations, HTA" 05.11.2005 27.01.2010
1308 01.11.2005 U217 Mass Measurements at SHIPTRAP Block 2742 m.block@gsi.de       Main Y7 58Ni   4.36 MeV/u 100-500 pnA   9 February 2006     Window foil between SHIP and SHIPTRAP   223 Ra, 10kBq.         strong magnetic field, high beam current 06.02.2006 08.02.2006 prio:1 text:"U217, Block, 58Ni(PIG), 4.36 MeV/u, 100-500 pnA, Y7" 01.11.2005 27.01.2010
1318 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA U   300 MeV/u     6 1-2.10.2004                     13.03.2006 14.03.2006 prio:1 text:"SMAT, Trautmann, Pb (PIG), 160 MeV/u, 5e8/spill, HTA" 04.08.2004 27.01.2010
1319 13.01.2005 S297 Strange Baryons/Kaonic Clusters Herrmann 2768 n.herrmann@gsi.de Hildenbrand 2767 k.hildenbrand@gsi.de main HTB protons   4.8 GeV 1e8/spill long extraction 21 4th block 2005 (before October 31) FOPI drift chambers (Ar, C4H8, CH4) liquid deuterium target 50 mum Ti beam exit window no no from window to rear wall of Cave B no no no no 25.01.2006 30.01.2006 prio:2 text:"S297, Herrmann/Hildenbrand, protons (MUCIS)/12C (ECR), 3.6 GeV, 1e8/spill, long extraction, HTB" 13.01.2005 27.01.2010
1320 29.04.2005 E049 Beta decay of highly charged ions Bosch 2713 f.bosch@gsi.de       main ESR Pb (PIG)   450 MeV/u 1e8/spill SIS-cooler 12 June 2 - June 7                     13.01.2006 24.01.2006 prio:1 text:"E049, Bosch, 208Pb (PIG), 550 MeV/u, 1e8/spill, SIS-cooler, SIS/FRS/ESR" 29.04.2005 27.01.2010
1321 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Kr   11.4 MeV/u     9 Apr 2005                     01.03.2006 03.03.2006 prio:1 text:"UMAT, Trautmann, Pb (PIG), 11.4 MeV/u, short pulse length, X0" 18.11.2005 27.01.2010
1322 18.11.2005 UMAT Material science Trautmann 2716 C.Trautmann@gsi.de       main X0 Kr   11.4 MeV/u     9 Apr 2005                     11.04.2005 13.04.2005 prio:1 text:"UMAT, Trautmann, (MEVVA), 11.4 MeV/u, max pulse length, X0" 18.11.2005 27.01.2010
1329 25.11.2005 E045 Two-electron Lamb shift... Stoehlker 2712 t.stoehlker@gsi.de         ESR U91+, U92+   350 MeV/u 1e8 in ESR SIS cooler, deceleration in ESR to 20-50 MeV/u 21 2006 block 2-3     Thin Fe X-ray window               11.12.2006 17.12.2006 prio:3 text:"E045, Stoehlker, U91+, U92+, 350 MeV/u, 1e8 in ESR, SIS cooler, deceleration in ESR to 20-50 MeV/u, ESR electron cooler " 25.11.2005 27.01.2010
1840 07.02.2006 U219 TASCA commissioning Schaedel, M. 2460 m.schadel@gsi.de Schaedel     parasite X8 30Si   6.5-7.5 MeV/u                             24.04.2006 27.04.2006 prio:2 text"U219, Schaedel, 30Si, 6.5-7.5 MeV/u, 5ms, 5Hz, X8" 07.02.2006 27.01.2010
1290 08.09.2004 M001 Ausbildung Betriebspersonal SIT HD Scheeler 2316 U.Scheeler@gsi.de       parasite HTP (PIG)   various   low duty cycle                         07.10.2005 09.10.2005 prio:2 text:"M001, Scheeler, operator training/machine experiment" 08.09.2004 27.01.2010
1306 17.10.2005 S300 isomer experiment A=100 Bruce +44 (0)1273 642536 alison.bruce@bton.ac.uk Gerl   j.gerl@gsi.de main S4 U-238   750 max spill flat long extraction 21 May/June/July 2006                     11.12.2006 17.12.2006 prio:1 text:"S300, Bruce/Gerl, U-238, 750, max, spill flat long extraction, S4" 17.10.2005 27.01.2010
1334 16.10.2004 U223 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main Y7 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       13.04.2007 20.05.2007 prio:1 text:"U223, Hofmann, 64 Ni (EZR), 5 MeV/u, 1 puA, Y7" 16.10.2004 27.01.2010
1336 09.11.2004 E000   Steck 2406 m.steck@gsi.de       main ESR 238U92+   400 MeV/u   SIS cooler, deceleration in ESR to 140 MeV/u 6 December 6 and 7 H2 target                   13.03.2006 14.03.2006 prio:2 text:"E000, Steck, 208Pb8 (PIG), 400 MeV/u, SIS cooler, ESR" 09.11.2004 27.01.2010
1326 03.11.2005 S293 proton-induced fission with SPALADIN Boudard A. 33 1 69 08 43 44 aboudard@cea.fr Trautmann W.   W.Trautmann@gsi.de Main FRS 238 U, 208Pb, 181Ta No 1000 MeV/u around 5000 particles /second on target Good focalization on target 24 B.T. (accepted by the EA) Fall 2006 Liquid H target (10 Cm3) P10 in MUSIC4 detector ALADIN-MUSIC4 vacuum standard Install the H2 liquid target (common with S304) No 5000 p/s 208Pb at 1GeV/u through 8 m air No No No Liquid H target (10 Cm3)     prio:2 text:"S293, Boudard/W.Trautmann,Ta, 1GeV/u, 5e3/s on target, FRS-S4" 03.11.2005 27.01.2010
1328 08.11.2005 U209-2 Nuclear Structure Investigations of SHE Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de main Y7 Ar-40 (PIG), Cr-54 (ECR) Cr-54 4.6-5.1 2000 pnA (Ar-40), 1000 pnA (Cr-54) 5.5 ms UNILAC 36 (Ar-40) + 66 (Cr-54) 2nd Quarter 2006 or later no ethanol for detector coolin (ca. 20 l) no no no no no no no high beam currents 04.03.2006 14.03.2006 prio:1 text:"U209-2, Heßberger/Heßberger, Cr-54 (ECR), 4.6-5.1, 2000 pnA, 5.5 ms UNILAC, Y7" 08.11.2005 27.01.2010
1380 11.08.2005 UBIO-PT04 delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 Sn   3.6 MeV/u 1microA 5ms pulse 9 13,-15.10.2005 no no no no no no no no no no 18.01.2006 22.01.2006 prio:1 text:"UBIO-PT04, Hagmann, Pb(PIG), 3.6 MeV/u, 1microA, X3" 11.08.2005 27.01.2010
1381 11.08.2005 UBIO-PT04 delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 Sn   3.6 MeV/u 1microA 5ms pulse 9 13,-15.10.2005 no no no no no no no no no no 26.01.2006 29.01.2006 prio:1 text:"UBIO-PT04, Hagmann, C(ECR), 3.6 MeV/u, 1microA, X3" 11.08.2005 27.01.2010
1382 11.08.2005 UBIO-PT04 delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 Sn   3.6 MeV/u 1microA 5ms pulse 9 13,-15.10.2005 no no no no no no no no no no 06.02.2006 08.02.2006 prio:2 text:"UBIO-PT04, Hagmann, 58Ni(PIG), 3.6 MeV/u, 1microA, X3" 11.08.2005 27.01.2010
1383 17.11.2004 UMAT Material science Fischer 2651 B.Fischer@gsi.de       main X0 58Ni   3 MeV/u max intensity sharp energy, long pulse 9 2005 block 1                     14.02.2006 15.02.2006 prio:1 text:"UMAT, Fischer, 12C (ECR), ca. 9 MeV/u, max intensity, sharp energy, long pulse, X0" 17.11.2004 27.01.2010
1384 08.11.2005 U209-2 Nuclear Structure Investigations of SHE Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de main Y7 Ar-40 (PIG), Cr-54 (ECR) Cr-54 4.6-5.1 2000 pnA (Ar-40), 1000 pnA (Cr-54) 5.5 ms UNILAC 36 (Ar-40) + 66 (Cr-54) 2nd Quarter 2006 or later no ethanol for detector coolin (ca. 20 l) no no no no no no no high beam currents 14.03.2006 14.03.2006 prio:2 text:"U209-2, Heßberger/Mann, energy measurement to U209, X4" 08.11.2005 27.01.2010
1386 17.10.2005 FRS000 FRS test Geissel     Weick   h.weick@gsi.de parasitic S4 Pb-208   750 max spill flat long extraction 21 March 2006                     13.03.2006 14.03.2006 prio:3 text:"FRS test, Geissel/Weick, Pb208, 750MeV/u, spill flat long extraction, S4" 17.10.2005 27.01.2010
1440 13.12.2005 S317 High-Intensity Effect and Beam Loss Issues in FAIR Hofmann +49 6159 71 2409 I.Hofmann@gsi.de Franchetti +49 6159 712410 G.Franchetti@gsi.de Main SIS/UNILAC Ar40+,Xe,N,Ne: ion which garantees high reproducibility and allow to reach space charge limit   11.4 MeV/u, SIS18 injection energy maximum intensity (space charge limit)   6 shifts, 2 shifts per day for 3 days Block 2                     08.12.2006 10.12.2006 prio:1 text:"S317, Hofmann/Franchetti, Ar: ion which garantees high reproducibility and allow to reach space charge limit, 11.4 MeV/u, SIS18 injection energy, maximum intensity (space charge limit), day only, SIS/UNILAC" 13.12.2005 27.01.2010
1845 09.09.2004 U200 Nuclear Structure Investigations No, Lr Hessberger 2735 f.p.hessberger@gsi.de       main Y7 48Ca 48Ca 4.2-5.5 MeV/u 500 pnA   33           239Pu, 241Am, 242Cm, Cf-sf (<0.1 microCi)         high beam currents 31.03.2006 05.04.2006 prio:1 text:"U200, Hessberger, 48Ca (ECR), 4.2-5.5 MeV/u, 1 pmicroA , Y7" 09.09.2004 27.01.2010
1875 26.02.2006 U000   beamline test             UNILAC                                   26.02.2006 26.02.2006 prio:3 text:"U000, beamline test,, 238U, 5.9 MeV/u, 5Hz, Y7" 26.02.2006 27.01.2010
1880 20.02.2006 U000   bemaline test             UNILAC                                   20.02.2006 22.02.2006 prio:3 text:"U000, beamline test, 238U, 5.9 MeV/u, 5Hz, Y7" 20.02.2006 27.01.2010
1385 08.11.2005 U209-2 Nuclear Structure Investigations of SHE Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de main Y7 Ar-40 (PIG), Cr-54 (ECR) Cr-54 4.6-5.1 2000 pnA (Ar-40), 1000 pnA (Cr-54) 5.5 ms UNILAC 36 (Ar-40) + 66 (Cr-54) 2nd Quarter 2006 or later no ethanol for detector coolin (ca. 20 l) no no no no no no no high beam currents 08.03.2006 08.03.2006 prio:2 text:"U209-2, Heßberger/Mann, energy measurement to U209, X4" 08.11.2005 27.01.2010
1790 02.11.2005 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de Hofmann 2734/2685 s.hofmann@gsi.de main Y7 50Ti   5.00 MeV/u 1 pmicroA   2 * 105 2006-2007   alcohol for cooling         +-300kV       04.05.2006 17.05.2006 prio:1 text:"U184, Hofmann/Hofmann, 54Cr (ECR), 5.0 MeV/u, 1 pmicroA, Y6" 02.11.2005 27.01.2010
1590 27.02.2006 UBIO PT04 electron spectroscopy Hagmann 2437 s.hagmann@gsi.de       parasite X4 protons   3.6AMeV 1nA 5ms pulse 8 8-11mai                     08.05.2006 11.05.2006 prio:2 text:"UBIO PT04, Hagmann, protons, 3.6AMeV, 1nA, 5ms pulse, X3" 27.02.2006 27.01.2010
1311 13.10.2005 S305 Fragmentation of 136Xe Jungclaus 0034-914977654 andrea.jungclaus@uam.es Wollersheim 2670 h.j.wollersheim@gsi.de main FRS 136Xe ECR 136Xe 1 GeV/u 1e10/spill flat spil, slow extraction 21 May 2006 within RISING stopped beam                     26.06.2006 09.07.2006 prio:2 text:"S305, Jungclaus/Wollersheim, 136Xe (MUCIS), 1 GeV/u, FRS" 13.10.2005 27.01.2010
1294 11.08.2005 UBIO delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 C   3.6 MeV/u 1microA 5ms pulse 9 4,-6.11.2005 no no no no no no no no no no 04.11.2005 06.11.2005 prio:1 text:"UBIO, Scholz/Hagmann, C, 3.6 MeV/u, 1microA, 5ms pulse, X3" 11.08.2005 27.01.2010
1299 11.08.2005 UBIO delta-electron emissin Scholz 1340 m.scholz@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 C   11.4 MeV/u 1microA 5ms pulse 9 26,-28.11.2005 no no no no no no no no no no 28.10.2005 29.10.2005 prio:1 text:"UBIO, Scholz/Hagmann, C, 11.4 MeV/u, 1microA, 5ms pulse, X3" 11.08.2005 27.01.2010
1301 24.08.2005 UMAT Mikrosonde Fischer 2651 B.Fischer@gsi.de       main X0 12C   4,8 MeV/u max, 50 Hz 5 ms, minimum energy spread 9 1. - 3. November 2005 no no 1 mm² vacuum window as usual no no 50 µm of air no no no no 30.10.2005 01.11.2005 prio:1 text:"UMAT, Fischer, 12C, 4,8 MeV/u, max, 50 Hz, 5 ms, minimum energy spread, X0" 24.08.2005 27.01.2010
1307 31.10.2005 U216 ERDA: Properties of Gold-coated Samples Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de Main (at least 30 Hz) UU Pb   1.4 MeV/u maximum intensity   9 March 2006 Ionisation Chamber, C4H10, 0.06 gas liters / h   standard vacuum glas window (4x)               25.02.2006 26.02.2006 prio:2 text:"U216, Bender/Bender, 136Xe (ECR), 1.4 MeV/u, UU" 31.10.2005 27.01.2010
1332 30.11.2005 U213 ion-plasma interaction Blazevic 2294 a.blazevic@gsi.de Blazevic 2294 a.blazevic@gsi.de parasite Z6 Ar, mean charge state, (ECR)   4.0 250 pnA sharp in time 15 5 days in March - - - - - - - - - - 09.03.2006 13.03.2006 prio:2 text:"U213, Blazevic/Blazevic, 54Cr, mean charge state, (ECR), 4.0, 250 pnA, sharp in time, Z6" 30.11.2005 27.01.2010
1410 07.12.2005 UBIO   Scholz 1340 m.scholz@gsi.de       Parasite X6 Au   11.4 2TnA 5ms 6 23.-24.1.2006                     23.01.2006 24.01.2006 prio:2 text:"UBIO, Scholz, Pb, 11.4, 2TnA, 1ms, 5Hz, X6" 07.12.2005 27.01.2010
1885 11.01.2006 S000 2006-1 SIS start             SIS                                   11.01.2006 12.01.2006 prio:1 text:"SIS start" 11.01.2006 27.01.2010
1540 07.02.2006 S319 Test experiment for HypHI Saito 2656 t.saito@gsi.de Saito 2656 t.saito@gsi.de parasite HTC 6Li   2000 MeV/u 1e5/spill   3 Between June 26th and 30th, 2006           Beams in the air         02.10.2009 11.10.2009 prio:1 text:"S319, Saito/Saito, 6Li, ECR, 2000 MeV/u, 1,2e8/spill, HTC" 07.02.2006 27.01.2010
1570 21.02.2006 E062 ESR measurements of p,gamma rates Heil +49 7247 82 3984 michael.heil@ik.fzk.de Litvinov 2142 y.litvinov@gsi.de parasite ESR 112 Sn(ECR) enriched 112Sn 200 MeV/u maximum, 1e8/spill SIS cooler, fast extraction 21 shifts no no no no no no no no no no Gas-Jet operation 02.03.2009 15.03.2009 prio:2 text:"E062, Heil/Litvinov, 96Ru (PIG), 200 MeV/u, >5e6/spill, SIS cooler, fast extraction, ESR" 21.02.2006 27.01.2010
1870 18.07.2006 SiSt   Fehrenbacher             HTA 12C                                 18.07.2006 24.07.2006 prio:2 text:"SiSt, Fehrenbacher, 12C, (ECR), HTA" 18.07.2006 27.01.2010
1337 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de main Y7 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           26.06.2006 03.07.2006 prio:1 text:"U206, Andreyev/Mann, 52Cr (PIG), 5 MeV/u, 500 pnA, Y6" 11.04.2005 27.01.2010
1309 01.11.2005 U207 Optical spectroscopy of nobelium Backe 06131-3925563 backe@kph.uni-mainz.de Block 2742 m.block@gsi.de Main Y7 52Cr   4-5 MeV/u 100-500 pnA   12 2 runs of 6 shifts each with 1 week in between     Window foil between SHIP and SHIPTRAP             strong magnetic field, high beam current 23.06.2006 24.06.2006 prio:1 text:"U207, Backe/Block, 52Cr, 4-5 MeV/u, 100-500 pnA, Y7" 01.11.2005 27.01.2010
1387 26.01.2005 U205 Decay properties near Z=108 and N=162 Tuerler 089-289-12202 andreas.tuerler@radiochemie.de Schaedel 2460 m.schaedel@gsi.de main X1 25Mg (ECR) 25Mg 6.5-7.5MeV/u 1 pmicroA, 50 Hz 5.5 ms, rotating 248Cm target ARTESIA 60 between 15.7 and 2.9.2005 O2 100 ml/min in He   Be-window, irradiation in standard rotating target (248 Cm) wheel gas transport system X1->X1A     25Mg, 6 MeV/u, 1 pmicroA through 100 mm He, 1 bar       open radioactivity, 248 Cm target wheel 27.07.2006 07.08.2006 prio:1 text:"U205, Tuerler/Schaedel, 25Mg5+ (ECR), 192.7 MeV, 1 pmicroA, 50 Hz, 5.5 ms, rotating 248Cm target ARTESIA, X1" 26.01.2005 27.01.2010
1598 28.02.2006 U217 Mass Measurements at SHIPTRAP Block 2742 m.block@gsi.de Herfurth 1360 f.herfurth@gsi.de Main Y7 40Ca, PIG   3.5-5.0 MeV/u 500 pnA, 50Hz   9 Woche 29     Window foil between SHIP and SHIPTRAP               18.07.2006 21.07.2006 prio:1 text:"U217, Block/Herfurth, 40Ca, PIG, 3.5-5.0 MeV/u, 500 pnA, 50Hz, Y7" 28.02.2006 27.01.2010
1605 10.03.2006 STHE PT06 Watercalorimeter Dosimetry Krauss 0531-592-6230 achim.krauss@ptb.de Heeg -2156 p.heeg@gsi.de therapy nights HTM 12C6+ (ECR) none therapy energies 2e8/spill none 3 November 2006 none none none about 100kg, moved by trolley none 12C-beam going through air none none none none 16.11.2006 18.11.2006 prio:2 text:"STHE-PT06, Krauss/Heeg, 12C6 (ECR), ther. en., nights, 2e8/spill, HTM" 10.03.2006 27.01.2010
1705 06.04.2006 S306 Investigation of inversion of nd3/2-nf7/2,p3/2 Datta Pramanik +91-33-23375345 ext 2364, +91-9831427568 ushasi.dattapramanik@saha.ac.in Emling Hans H.Emling@gsi.de main CAVEC (LAND-setup) 040 Ar(18+) 40Ar 550 MeV/nucleon 1e11/spill(SIS)   40 shifts within Dec.2006 to April2007 no no no na na unstable beam will go through air of 5m na na na   17.01.2009 27.01.2009 prio:1 text:"S306, Datta Pramanik/Aumann, 40Ar(18+), 550 MeV/nucleon, 5E10/spill(SIS), CAVEC (LAND-setup)" 06.04.2006 27.01.2010
1635 20.03.2006 UMAT Material science Trautmann 2716 c.trautmann@gsi.de Trautmann 2716 c.trautmann@gsi.de main or parasite X0 Ti - 11.4 MeV/u max 5 ms, 50 Hz if possible 9 4.-7.5.06 oder 12.-14.5.06 no no no no no no no no no no 04.05.2006 07.05.2006 prio:2 text:"UMAT, Trautmann/Trautmann, Ti, 11.4 MeV/u, max, 5 ms, 50 Hz if possible, X0" 20.03.2006 27.01.2010
1625 20.03.2006 UMAT Material science Trautmann 2716 c.trautmann@gsi.de Trautmann 2716 c.trautmann@gsi.de parasitic HTA Kr - 150 MeV/u 1e9 ions/spill   6 z.B. 9.-10.4.06 no no no no no 50 cm air no no no no 10.04.2006 11.04.2006 prio:2 text:"SMAT, Trautmann/Trautmann, Kr , ~150 MeV/u, 1e9 ions/spill, HTA" 20.03.2006 27.01.2010
1630 20.03.2006 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de main HTA U - 150 MeV/u 3e8 ions/spill - 9 10.-12.8.06 no no no no no 50 cm air no no no no 11.12.2006 17.12.2006 prio:4 text:"SMAT, Trautmann/Trautmann, U, 150 MeV/u, 3e8 ions/spill, -, HTA" 20.03.2006 27.01.2010
1655 22.03.2006 U215 -X4 Reaction 30Si + 238U / Energy -Control Nishio     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 30Si   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 Sept. 2005 - May 2006 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 28.04.2006 28.04.2006 prio:2 text:"U215 -X4, Nishio/Hofmann, 30Si, 4.8-5.6 MeV/u, 500 pnA / 1-2 Hz ( 10% Y7), copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1277 25.07.2005 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Lange 2151, 2147 j.stroth@gsi.de, J.S.Lange@gsi.de parasite HAD 12C   0.8 AGeV 10^8 / spill 9 s extraction 8 17.11-24.11.2005 i-butane, methane none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 06.11.2005 07.11.2005 prio:3 text:"S301, Salabura/Stroth, 12C (ECR), 0.8 AGeV, beam setup, 9 s extraction, HAD" 25.07.2005 27.01.2010
1293 10.08.2005 SBIO   Scholz 1340 m.scholz@gsi.de scholz 1340 m.scholz@gsi.de Therapy nights HTM 12C   100-400 MeV/u   Therapy conditions 6 night shifts Therapy block Feb. 2006, >6days after start of block no no vacuum window no no 12C, <1e8/spill, air, 6m no no no no 31.01.2006 05.02.2006 prio:2 text:"SBIO, Scholz/scholz, 12C, 100-400 MeV/u, Therapy conditions, HTM" 10.08.2005 27.01.2010
1302 08.09.2005 S271 2 proton decay of 19Mg Mukha   IvanMukha@yandex.ru Suemmerer 2737 k.suemmerer@gsi.de Main FRS 24Mg (MEVVA)   350 MeV/u 1e10/spill small mod. of FSR-S2 area (ca. 2 days between other FRS exp. before and after run) 16 Feb to May 2006                     10.08.2006 15.08.2006 prio:1 text:"S271, Mukha/Suemmerer, 24Mg (MEVVA), 350 MeV/u, 1e10/spill, small mod. of FSR-S2 area (ca. 2 days between other FRS exp. before and after run), FRS" 08.09.2005 27.01.2010
1304 13.10.2005 S244 isomer experiment Ni-54 Rudolph 0046-46-2227633 Dirk.Rudolph@nuclear.lu.se Gerl   j.gerl@gsi.de main S4 58Ni   600 MeV/u max spill flat long extraction 12 March 2006 (within 1st RISING stopped campaign)                     09.03.2006 12.03.2006 prio:1 text:"S244, Rudolph/Gerl, 58Ni(MEVVA), 600 MeV/u, max, spill flat long extraction, S4" 13.10.2005 27.01.2010
1310 05.11.2004 S244 Fission of 238U, isomer in130Cd Pfuetzner 0048 22 55 46 842 pfutzner@mimuw.edu.pl Gorska 2917 m.gorska@gsi.de main FRS 238U   750 MeV/u   flat spill, long extraction 21 May 2006 within RISING stopped beam                     10.07.2006 17.07.2006 prio:2 text:"S244, Pfuetzner/Gorska, 238U, 2e9/spill, 750 GeV/u, FRS" 05.11.2004 27.01.2010
64102 18.05.2007 UMAT Mikrosonde Du 2715 g.du@gsi.de B. Fischer 2651 B.Fischer@gsi.de Main X0 Ni 58Ni 4,8 100pnA 50Hz 9 23-25 sept. 2007 - - - - - 50Hz, long pulse, sharp energy -   - - 21.09.2007 24.09.2007 prio:1 text:"UMAT, Trautmann, 129Xe (PIG), 11.4 MeV, max. intens., 5Hz, 5ms, X0" 18.05.2007 27.01.2010
1460 20.12.2005 UBIO-PT04 delta-electron emissin Hagmann 2437 s.hagmann@gsi.de Hagmann 2437 s.hagmann@gsi.de main X4 C12   11.4 MeV/u 1microA 5ms pulse 12 1.-4.02.05 no no no no no no no no no no 01.02.2006 05.02.2006 prio:1 text:"UBIO-PT04, Hagmann, C12(ECR), 11.4 MeV/u, 1microA, 5ms pulse, X3" 20.12.2005 27.01.2010
1715 11.04.2006 UMAT Material science Fischer 2651 b.fischer@gsi.de Heiß 2715 m.heiss@gsi.de main X0 heavier or equal Xe   11.4 MeV/u max 5ms, 50 Hz, minimal energy spread 6 july or august 2006, after 17.07 no no no no no no no no no no 18.11.2006 19.11.2006 prio:1 text:"UMAT, Fischer/Heiß, 132Xe, 11.4 MeV/u, max, 5ms, 50 Hz, minimal energy spread, X0" 11.04.2006 27.01.2010
159691 19.02.2007 U225 Nuclear Structure Investigations of SHE Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de Main Y7 054 Cr (ECR)   4.6 - 5.1 MeV/u 2000 pnA, 50 Hz (Ar), 1000 pnA 50 Hz (Cr) 5 ms 36 summer 2007 no ethanol for detector cooling no no no no no no no high beam currents 10.10.2007 11.10.2007 prio:2 text:"U225, Heßberger, 40Ar (PIG), 4.5 - 5 MeV/u, 2000 pnA, 50 Hz, 5-5.5 ms, Y7" 19.02.2007 27.01.2010
1601 06.03.2006 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Ar   11.4 2 TnA >1ms 6 20.-21.04.2006                     20.04.2006 21.04.2006 prio:2 text:"UBIO, Scholz, Ar, 11.4, 2 TnA, >1ms, X6" 06.03.2006 27.01.2010
1610 13.03.2006 S302 HED matter generated by intense heavy ion beams Mintsev   minvb@icp.ac.ru Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT 238U73+ (PIG)   300-500 MeV/u >2-4E9 (max) fast extraction, bunch compression, e-cooling 20 3-9.08.2006 - August 2006 no no no no no no no no no no 31.07.2006 09.08.2006 prio:2 text:"S302, Mintsev/Varentsov, 238U73+ (PIG), 300-500 MeV/u, >2-4E9 (max), fast extraction, bunch compression, e-cooling, HHT" 13.03.2006 27.01.2010
1680 29.03.2006 E046 Inverse Photoionization Th. Stöhlker 2712 t.stoehlker@gsi.de Stöhlker       ESR 238 U   30 10^8 stored ions SIS cooler 12 2007 H2 target                   07.05.2008 10.05.2008 prio:2 text:"E046, Stöhlker, 238U (MEVVA), ESR" 29.03.2006 27.01.2010
1685 29.03.2006 E056 Low-Charged Ions Bob Dubois +1 573 341 4708 dubois@umr.edu Stöhlker 2712 t.stoehlker@gsi.de   ESR 238 U28+   10-60 MeV/u moderate 12 2007 H2 target                   28.04.2008 01.05.2008 prio:2 text:"E056, Dubois/Stöhlker, U28+, 10-60 MeV/u, moderate intens. , ESR / jet target " 29.03.2006 27.01.2010
1660 22.03.2006 U215 -X4 Reaction 30Si + 238U / Energy -Control Nishio     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 30Si   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 Sept. 2005 - May 2006 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 22.04.2006 22.04.2006 prio:2 text:"U215 -X4, Nishio/Hofmann, 30Si, 4.8-5.6 MeV/u, 500 pnA / 1-2 Hz ( 10% Y7), copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1665 22.03.2006 U215 -X4 Reaction 30Si + 238U / Energy -Control Nishio     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 30Si   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 Sept. 2005 - May 2006 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 17.04.2006 17.04.2006 prio:2 text:"U215 -X4, Nishio/Hofmann, 30Si, 4.8-5.6 MeV/u, 500 pnA / 1-2 Hz ( 10% Y7), copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1670 22.03.2006 U215 -X4 Reaction 30Si + 238U / Energy -Control Nishio     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 30Si   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 Sept. 2005 - May 2006 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 13.04.2006 13.04.2006 prio:2 text:"U215 -X4, Nishio/Hofmann, 30Si, 4.8-5.6 MeV/u, 500 pnA / 1-2 Hz ( 10% Y7), copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1675 22.03.2006 U215 -X4 Reaction 30Si + 238U / Energy -Control Nishio     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 30Si   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 6 Sept. 2005 - May 2006 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 08.04.2006 09.04.2006 prio:2 text:"U215 -X4, Nishio/Hofmann, 30Si, 4.8-5.6 MeV/u, 500 pnA / 1-2 Hz ( 10% Y7), copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1720 12.04.2006 U221 Diamant Detector test Braeuning-Demian 2711 a.braeuning-demian@gsi.de Mann 2724 r.mann@gsi.de parasite to U184 X4   50Ti 5 MeV/u bis 11.4 MeV/u     3 12 und 13 May no none thin foil window , ~ 20 mm^2 no no Yes, ~50 mm no no no none 12.05.2006 13.05.2006 prio:2 text:"U221, Braeuning-Demian/Mann, 54Cr, 5 MeV/u bis 11.4 MeV/u, X4" 12.04.2006 27.01.2010
1600 27.02.2006 UBIO PT04 electron spectroscopy Hagmann 2437 s.hagmann@gsi.de       parasite X4 Kr   11.4AMeV 1nA 5ms pulse 6 10-12April                     18.04.2006 19.04.2006 prio:2 text:"UBIO PT04, Hagmann, 30Si, 11.4AMeV, 1nA, 5ms pulse, X3" 27.02.2006 27.01.2010
1735 25.04.2006 U068 Response of Calorimetric Detectors Egelhof 2662 p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de main Z6 18O   several energies 50 pnA, 50 Hz   6 22.-23.5.06 4He cryostat no 4He cryostat no no no no no no no 22.05.2006 23.05.2006 prio:1 text:"U068, Egelhof/Egelhof, 7Li, several energies, 50 pnA, 50 Hz, Z7" 25.04.2006 27.01.2010
1276 21.07.2005 SBIO Fragmentation in tissue-equivalent targets Schardt 2432 d.schardt@gsi.de d.schardt@gsi.de 2432 d.schardt@gsi.de parasite - therapy days HTA 12C   100-400 MeV/u 1e4-1e6/spill 4 s extraction 5 therapy days therapy block Nov. 2005/ week 46/47 no no vacuum window, Al 0.1 mm, 50mm diam. no no 12C, 1e4-1e6/spill, air, 4m no no no no 17.11.2005 21.11.2005 prio:3 text:"SBIO, Schardt/d.schardt@gsi.de, 12C, 100-400 MeV/u, 1e4-1e6/spill, 4 s extraction, HTA" 21.07.2005 27.01.2010
1890 18.05.2006 U219 TASCA commissioning Schaedel, M. 2460 m.schadel@gsi.de Schaedel Schaedel m.schaedel@gsi.de nights, parasitic to UNILAC Tests X8 40Ar (Penning)   4.5-5.5 MeV/u 10 pmicroA (Pulse), 5 ms, 50 Hz   6 30.10.-04.11.2006 no no no no no 0.5 mbar He, ca. 200 cm (gas-filled separator) no no no coupling of a He-gas jet to the TASCA separator 30.10.2006 03.11.2006 prio:1 text:"U219, Schaedel, M./Schaedel, 40Ar (Penning), 4.5-5.5 MeV/u, 10 pmicroA (Pulse), 5 ms, 50 Hz, nights only, X8" 18.05.2006 27.01.2010
1736 25.04.2006 U068 Response of Calorimetric Detectors Egelhof 2662 p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de main Z6 18O   several energies 50 pnA, 50 Hz   6 22.-23.5.06 4He cryostat no 4He cryostat no no no no no no no 27.05.2006 28.05.2006 prio:1 text:"U068, Egelhof/Egelhof, 7Li, several energies, 50 pnA, 50 Hz, Z7" 25.04.2006 27.01.2010
1500 13.01.2006 SBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de Therapy nights HTM 12C   100-400 MeV/u   Therapy conditions 6 night shifts Therapy block nov/dec 2006 >6 days after start of therapy, preferentially starting on 20.11.     vacuum window     12C, <1E8/spill, air, 6m         21.11.2006 26.11.2006 prio:2 text:"SBIO, Scholz/Scholz, 12C, 100-400 MeV/u, Therapy conditions, nights only, HTM" 13.01.2006 27.01.2010
1520 30.01.2006 U217 Mass Measurements at SHIPTRAP Block 2742 m.block@gsi.de       Main Y7 48Ca / ECR 48Ca 4.5 MeV/u 1 puA 5ms 9 November/December 2006   alcohol for cooling Window foil between SHIP and SHIPTRAP             strong magnetic field, high beam current 08.12.2006 10.12.2006 prio:1 text:"U217, Block, 40Ar, 4.5 MeV/u, 1 puA, 1ms,5Hz Y7" 30.01.2006 27.01.2010
1560 17.02.2006 STHE-PT03 Development of PET Enghardt 0351-458-7411 Wolfgang.Enghardt@oncoray.de Schardt 2432 D.Schardt@gsi.de 12C: Therapy nights, 16O: main or parasite (with ~ 30 min continuous irradiation) HTM 12C, 16O   12C: as for therapy, 16O: 100-420 MeV/u 1e7-2e8/spill Extraction as for therapy 12C: 2 shifts, 16O: 4shifts 16O: asap, 2 runs of 2 shifts each, not Sept 2006, 12C: during therapy times         22Na (15 MBq), 68Ge (30 MBq), PET calibration sources, 1 m through air         19.02.2007 22.02.2007 prio:2 text:"STHE, Schardt, 12C, 1e8/spill, nights only, HTA" 17.02.2006 27.01.2010
1710 11.04.2006 UMAT Material science Fischer 2651 b.fischer@gsi.de Heiß 2715 m.heiss@gsi.de main X0 12C   9.6 MeV/u max 5ms, 50 Hz, minimal energy spread 9 july 2006, not between 07.07 and 17.07 no no no no no yes, 50µm in air no no no no 22.07.2006 24.07.2006 prio:1 text:"UMAT, Fischer/Heiß, 12C, 9.6 MeV/u, max, 5ms, 50 Hz, minimal energy spread, X0" 11.04.2006 27.01.2010
1595 27.02.2006 UBIO PT04 electron spectroscopy Hagmann 2437 s.hagmann@gsi.de       parasite X4 Kr   11.4AMeV 1nA 5ms pulse 6 10-12April                     10.04.2006 12.04.2006 prio:2 text:"UBIO PT04, Hagmann, 30Si, 11.4AMeV, 1nA, 5ms pulse, X3" 27.02.2006 27.01.2010
1602 06.03.2006 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 50Ti   11.4 2 TnA >1ms 6 15.-16.05.2006                     14.05.2006 15.05.2006 prio:2 text:"UBIO, Scholz, 54Cr, 11.4, 2 TnA, >1ms, X6" 06.03.2006 27.01.2010
1650 20.03.2006 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de parasitär HTA U - 150 MeV/u 3e8 ions/spill - 9 7.-17.7.06 parallel zu S244 no no no no no 50 cm air no no no no 09.08.2006 09.08.2006 prio:1 text:"SMAT, Trautmann/Trautmann, U, 150 MeV/u, 3e8 ions/spill, -, HTA" 20.03.2006 27.01.2010
1760 09.05.2006 UMAT Mikrosonde Fischer 2651 B.Fischer@gsi.de Heiß 2715 M.Heiss@gsi.de Main X0 116Sn from PIG no 4.8 MeV/u max 5ms, 50Hz, minimal energy spread 3 15.08.06 no no no no no no no no no no 15.08.2006 15.08.2006 prio:1 text:"UMAT, Fischer/Heiß, 116Sn from PIG, 4.8 MeV/u, max, 5ms, 50Hz, minimal energy spread, X0" 09.05.2006 27.01.2010
1740 26.04.2006 U220 Incomplete Fusion of Mg-25 and Pb-206 Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de parasite (to U205 at X1) Y7 Mg-25   5.9, 8.6 AMeV 100 pnA (5 Hz)   36 parasite to U205, week 30-32 2006 no ethanol for detector cooling no no alpha-,sf-sources (GSI property) no no no no   27.07.2006 07.08.2006 prio:2 text:"U220, Heßberger/Heßberger, Mg-25, 5.9, 8.6 AMeV, 100 pnA (5 Hz), Y7" 26.04.2006 27.01.2010
1730 24.04.2006 UMAT Mikrosonde Fischer 2651 B.Fischer@gsi.de Fischer 2651 B.Fischer@gsi.de Main X0 anything between Kr and Bi no about 4.8 MeV/u max max. macro-pulse duration, high energy definition 9 as soon as possible after August 2006 no no no no no yes 50 µm path in air no no no no 13.11.2006 15.11.2006 prio:1 text:"UMAT, Fischer/Fischer, 132Xe, about 4.8 MeV/u, max, max. macro-pulse duration, high energy definition, X0" 24.04.2006 27.01.2010
1745 03.05.2006 UBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de parasite X6 Xe,U   11.4 MeV 2 TnA 5 ms 9 05.07.-07.07.                     04.07.2006 06.07.2006 prio:2 text:"UBIO, Scholz/Scholz, Xe, 11.4 MeV, 2 TnA, 5Hz, 1ms, X6" 03.05.2006 27.01.2010
1750 04.05.2006 S279 Kaonic Cluster Herrmann 2768 N.Herrmann@gsi.de Schuettauf 2768 A.Schuettauf@gsi.de Parasite HTB Proton     5 khz   1 12.05.06                 Nitrogen laser for calibration   17.05.2006 17.05.2006 prio:1 text:"S279, Herrmann/Schuettauf, 3 hours, Proton, 5 khz, HTB" 04.05.2006 27.01.2010
1755 05.05.2006 E055 Direct mass measurements at FRS-ESR Scheidenberger 2706 c.scheidenberger@gsi.de Litvinov 2142 y.litvinov@gsi.de parasite ESR any available beam   400 MeV/u 10particles/spill-1e5particles/spill SIS cooler, ESR isochronous, fast extraction 1 22-25.06.2006 no no no no no no no no no no 23.06.2006 25.06.2006 prio:2 text:"E055, Scheidenberger/Litvinov, 136Xe, 400 MeV/u, 10particles/spill-1e5particles/spill, SIS cooler, ESR isochronous, fast extraction, ESR" 05.05.2006 27.01.2010
1690 05.04.2006 UBIO   scholz 1340 m.scholz@gsi.de scholz 1340 m.scholz@gsi.de parasite X6 12C   11.4 MeV 2 TnA 5 ms 9 17.7.-19.7.                     17.07.2006 17.07.2006 prio:1 text:"UBIO, scholz/scholz, 12C, 11.4 MeV, 2 TnA, 5 ms, X6" 05.04.2006 27.01.2010
1765 12.05.2006 E070 collision dynamics at relativistic energies r moshammer 06221516461 moshammer@mpi-hd.mpg.de s.hagmann 2437 s.hagmann@gsi.de main ESR He-like Xe to U no 100 -400AMeV 1e8/spill SIS cooler 20shifts after september 2006 no no no no no no no no no no 08.12.2006 10.12.2006 prio:3 text:"E070, r moshammer/s.hagmann, He-like Xe to U, 100 -400AMeV, 1e8/spill, SIS cooler, ESR jet target" 12.05.2006 27.01.2010
1770 17.05.2006 S328 RPC detector tests Benlliure   j.benlliure@usc.es Aumann 1408 t.aumann@gsi.de parasite HTC 12C   500 MeV/u <1e4/spill 5 s extraction 3 shifts, 1 shift/day week 29           12C, 500 MeV/u, 1e3/s, air, 10m         19.07.2006 21.07.2006 prio:3 text:"S328, Benlliure/Aumann, 12C, 500 MeV/u, <1e4/spill, 5 s extraction, 3 shifts at day only, HTC" 17.05.2006 27.01.2010
1298 29.04.2005 E049 Beta decay of highly charged ions Bosch 2713 f.bosch@gsi.de       main ESR Pb (PIG)   450 MeV/u 1e8/spill SIS-cooler 12 June 2 - June 7                     26.09.2005 03.10.2005 prio:2 text:"E049, Bosch, Sm+Pb (PIG), 450 MeV/u, 1e8/spill, SIS-cooler, SIS/ESR" 29.04.2005 27.01.2010
1282 27.07.2005 E047 forward electron spectroscopy Hagmann 2437 s.hagmann@gsi.de Hagmann 2437 s.hagmann@gsi.de parasitic/main ESR U89+ -- appr. 100AMeV 1e8 [SIS cooler] 9 oct 2005 no no no no no no no no no no 26.11.2005 01.12.2005 prio:2 text:" E039, Hagmann, U (PIG), appr. 100 MeV/u, 1e8, [SIS cooler], ESR jet target" 27.07.2005 27.01.2010
1286 01.08.2005 U114 multiple ionization hagmann 2437 s.hagmann@gsi.de hagmann 2437 s.hagmann@gsi.de main X4 any high Z , e.g. Au direct and poststripped no 3.6AMeV 1microamp long pulses if possible 9 sept/oct. but avoid collision with ourESRbeamtime no no no no no no no no no no 26.09.2005 28.09.2005 prio:1 text:"U114, Hagmann, Cr(ECR), 3.6MeV/u, 1microA, long pulses, X4" 01.08.2005 27.01.2010
1998 12.10.2006 U216 RBS Commissioning Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU 12C2+   1.4MeV/u few nA 5ms, >25Hz 8 13.-15. Nov. 2006     standard UHV viewport               22.11.2006 22.11.2006 prio:2 text:"U216, Bender/Bender, 12C, 1.4MeV/u, 2 shifts, few nA, HLI, UU" 12.10.2006 27.01.2010
1324 03.11.2005 S318 Study of the Borromean dripline nucleus 17Ne Jonson   bjn@fy.chalmers.se Aumann 1408 t.aumann@gsi.de main HTC 020 Ne   500 MeV/u 1e11/spill 12s extraction, spill flat 21 Block 3 or 4 in 2006 Ethan, 5 l/h   Vacuum window (20 cm diameter)   gamma calibrattion sources Ne, 500 MeV/u, air, ~10 m 2.5 kV, 3 mA       05.08.2007 13.08.2007 prio:1 text:"S318, Jonson/Aumann, 20Ne (MUCIS), 500 MeV/u, >1e10/spill, 10s extraction, spill flat, Vacuum at S2, FRS-HTC" 03.11.2005 27.01.2010
1312 11.11.2004 E000 ESR TEST Steck     Steck 2406 m.steck@gsi.de parasite ESR 12C3+   120 MeV/u >=1e8/spill in SIS SIS cooler 18 2005, block 2                 yes   10.04.2006 11.04.2006 prio:3 text:"E000, Steck, 86Kr (MUCIS), ESR" 11.11.2004 27.01.2010
1313 05.11.2004 S299 isomer experiment Pb<208 Podolyak   z.podolyak@surrey.ac.uk Gerl   j.gerl@gsi.de main S4 Pb-208   750 max spill flat long extraction 21 October/November 2005                     23.02.2006 24.02.2006 prio:2 text:"S299, Podolyak/Gerl, U(PIG), 1GeV/u, 10e6/spill, spill flat long extraction, FRS-S4" 05.11.2004 27.01.2010
1314 05.11.2004 S244 isomer experiment Nb-82 Regan   p.regan@surrey.ac.uk Gerl   j.gerl@gsi.de main S4 Mo-92   750 max spill flat long extraction 21 October/November 2005                     20.02.2006 22.02.2006 prio:2 text:"S244, Regan/Gerl, 107Ag(MEVVA), 750 MeV/u, max, spill flat long extraction, FRS-S4" 05.11.2004 27.01.2010
1315 01.11.2005 U207 Optical spectroscopy of nobelium Backe 06131-3925563 backe@kph.uni-mainz.de Block 2742 m.block@gsi.de Main Y7 52Cr   4-5 MeV/u 100-500 pnA   12 2 runs of 6 shifts each with 1 week in between     Window foil between SHIP and SHIPTRAP             strong magnetic field, high beam current 16.02.2006 19.02.2006 prio:1 text:"U217, Backe/Block, 50Cr, 4-5 MeV/u, 100-500 pnA, Y7" 01.11.2005 27.01.2010
1316 01.11.2005 U207 Optical spectroscopy of nobelium Backe 06131-3925563 backe@kph.uni-mainz.de Block 2742 m.block@gsi.de Main Y7 52Cr   4-5 MeV/u 100-500 pnA   12 2 runs of 6 shifts each with 1 week in between     Window foil between SHIP and SHIPTRAP             strong magnetic field, high beam current 05.07.2006 06.07.2006 prio:1 text:"U207, Backe/Block, 52Cr, 4-5 MeV/u, 100-500 pnA, Y7" 01.11.2005 27.01.2010
1317 04.08.2004 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de       parasite HTA 86Kr   300 MeV/u     6 14-15.4.2005                     13.03.2005 14.03.2005 prio:2 text:"SMAT, Trautmann, U (PIG), 300 MeV/u, HTA" 04.08.2004 27.01.2010
1330 28.11.2005 UMAT Material science Fischer 2561 B.Fischer@gsi.de       main X0 Au, admixture of W allowed   4.8 MeV/u max   12 beginning 2006, not 2.-7.feb and 13.-19. march no no no no no 50µm air no no no no 16.01.2006 17.01.2006 prio:1 text:"UMAT, Fischer, Pb, admixture of W allowed, 4.8 MeV/u, max I, short pulses X0" 28.11.2005 27.01.2010
1331 28.11.2005 UMAT Material science Fischer 2561 B.Fischer@gsi.de       main X0 Ni   4.8 MeV/u max max macro-pulse, min energy spread 12 beginning 2006, not 2.-7.feb and 13.-19. march no no no no no 50µm air no no no no 09.02.2006 10.02.2006 prio:1 text:"UMAT, Fischer, 58Ni(PIG), 4.8 MeV/u, max, max macro-pulse, min energy spread, X0" 28.11.2005 27.01.2010
1780 04.10.2004 S277 Single particle occupancies near 54Ca... Krücken 089-289-12433 Reiner.Kruecken@ph.tum.de Aumann 2668 T.Aumann@gsi.de 2 days parasitic / rest main FRS 2 days 48Ca parasitic, 2 days 48Ca main, rest 86Kr34+ main 48Ca 500 MeV/u Ca: 10e5/spill , Kr: 10e10 / spill 8s extraction 48 mid November 2005 - April 2006, best at beginning or end of this period due to. MINIBALL availability, should be scheduled together with S245 (beam request will be handed in shortly) which wants to use same setup     Standar GSI Vacuum Windows Remove Part of S2 SRS set-up, build up Ge holding structure   secondary beam: ca 400 MeV/u, 10e4 Hz, 4m 5 kV, 1 microAmp Ge High Voltage       31.03.2006 01.04.2006 prio:2 text:"S277, Krücken/Aumann, 2 days 48Ca parasitic, 2 days 48Ca main, rest 86Kr34+ main, 500 MeV/u, Ca: 10e5/spill , Kr: 10e10 / spill, 8s extraction, FRS" 04.10.2004 27.01.2010
1795 20.06.2005 S291 Residual radioactivity induced by U ions - experimental investigation and longtime predictions Mustafin 24-01 E.Mustafin@gsi.de       main HTA U   950 MeV/u up to 1e8/spill of SIS   20             U ions goes through air, path-length is about 30 cm         31.03.2006 01.04.2006 prio:1 text:"S291, Mustafin, U (PIG), 950 MeV/u, 1e8/spill, HTA" 20.06.2005 27.01.2010
1805 26.09.2005 S301 Dielectron production in pp,dp and AA col. Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Lange 2151, 2147 j.stroth@gsi.de, J.S.Lange@gsi.de Main user HAD 1H   1250 and 3500 MeV 10^8 / spill 10 s extractrion, perfect spill structure, small intensity variations from spill to spill 74+11 before July 2006, pref. April, Mai 2006 i-butane, methane, Hydrogen none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 03.05.2006 16.05.2006 prio:1 text:"S301, Salabura/Stroth, Lange, 1H, 3500 MeV, 10^8 / spill, 10 s extractrion, perfect spill structure, small intensity variations from spill to spill, HAD" 26.09.2005 27.01.2010
1820 29.11.2004 E067 Test of Time Dilation at the ESR Karpuk, Sergej +49 6131 39 25982 karpuk@uni-mainz.de Nörtershäuser, Wilfried +49 6159 71 2459 W.Noertershaeuser@gsi.de ? ESR 7Li+,   58.86 MeV/u >10 muA in ESR UNILAC Stripper to produce metastable ions 3x21 1) Nov/Dec 2005 2)Feb/Mar 2006 3)May/June 2006               1W@200MHz Diode Laser (776nm, 500mW)   22.05.2006 28.05.2006 prio:2 text:"E067, Karpuk/Nörtershäuser, 7Li+ (ECR), 58.86 MeV/u, >10 uA in ESR, ESR" 29.11.2004 27.01.2010
1825 09.06.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de       parasite, 1:3 HTA secondary protons - p > 2 GeV/c 1e5 protons/spill spill=4s total 4.5, in 2 runs: 2+2.5 March /April 2006           protons through 30 cm air max. 1kV       03.05.2006 16.05.2006 prio:2 text:"S280, Berdermann, protons, 3.5 GeV/c, 1e5 protons/spill, spill=4s, HTA" 09.06.2005 27.01.2010
1296 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de main X4 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           15.11.2005 16.11.2005 prio:2 text:"U206, Andreyev/Mann, 52Cr (PIG), 5 MeV/u, 500 pnA, X4" 11.04.2005 27.01.2010
1297 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de main X4 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           19.11.2005 19.11.2005 prio:2 text:"U206, Andreyev/Mann, 52Cr (PIG), 5 MeV/u, 500 pnA, X4" 11.04.2005 27.01.2010
1323 24.02.2005 S302 HED matter generated by intense heavy ion beams Mintsev   minvb@icp.ac.ru Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT U, Pb   300-400 MeV/u 2e9-1e10 (max) fast extraction, bunch compression 10-30 autumn and winter 2005                     21.04.2006 27.04.2006 prio:2 text:"S302, Mintsev/Varentsov, Ar(MUCIS), 300-400 MeV/u, 1.5*10^11, fast extraction, bunch compression, HHT" 24.02.2005 27.01.2010
1333 30.11.2005 UBIO Radiobiology Scholz 1340 m.scholz@gsi.de M. Scholz 1340 m.scholz@gsi.de parasitic X6 C   11.4 MeV/u 2TnA 5ms pulse 9 20.-22.2.2006 no no no no no no no no no no 20.02.2006 22.02.2006 prio:1 text:"UBIO, Scholz/M. Scholz, C, 11.4 MeV/u, 2TnA, 5ms pulse, X6" 30.11.2005 27.01.2010
1400 02.12.2005 U218 Coulomb excitation of 112, 114, 116Sn Doornenbal 06159-71 2738 p.doornenbal@gsi.de Doornenbal 06159-71 2738 p.doornenbal@gsi.de main X6 112Sn (ECR), 114Sn (ECR), 116Sn (ECR) 112Sn, 114Sn, 116Sn 3.6MeV/u 5pnA   3 times 7 Starting from April 2006 but not in the second week of may 2006                     10.08.2006 14.08.2006 prio:1 text:"U218, Doornenbal/Doornenbal, 114Sn (ECR), 116Sn (PIG), 3.6MeV/u, 5pnA, X7" 02.12.2005 27.01.2010
1338 11.04.2005 U206 Rn isotopes Andreyev     Hofmann 2734/2685 s.hofmann@gsi.de parasitic X4 52Cr   5 MeV/u 500 pnA   24 Sept-Dec. 2005     standard vacuum glas window (4x) 300kV SHIP high voltage Standard calibration sources (GSI sources)           29.06.2006 03.07.2006 prio:2 text:"U206, Andreyev/Mann, 52Cr (PIG), Y6-energy measurements, X4" 11.04.2005 27.01.2010
1000040 28.01.2010 S391 PRESPEC commissioing Bentley +44 1904 432256 mab503@york.ac.uk Gorska 2917 M.Gorska@gsi.de parasite S4 any - A~50 ideal   ~ 500 MeV/u (approx) up to 10^8 / spill for 10% of time   20 see e-mail Standard FRS detectors none none none none none none none none none 16.05.2011 19.05.2011 prio:2 text:"S391, Bentley/Gerl, Cr(EZR), 500 MeV/u, up to 10^8 / spill, FRS- S4" 28.01.2010 21.02.2011
1000186 18.01.2011 S000 B-Experimente Spiller           main SIS             1.04.-7.04.2011 no no no no no no no no no no 01.04.2011 07.04.2011 prio:1 text:"S000, Spiller, 40Ar (MUCIS), SIS" 18.01.2011 20.01.2011
1700 05.04.2006 UBIO   scholz 1340 m.scholz@gsi.de scholz 1340 m.scholz@gsi.de parasite X6 12C   11.4 MeV 2 TnA 5 ms 9 17.7.-19.7.                     18.07.2006 19.07.2006 prio:2 text:"UBIO, scholz/scholz, 12C, 11.4 MeV, 2 TnA, 5 ms, X6" 05.04.2006 27.01.2010
1470 13.01.2006 UBIO   Scholz 1340 m.scholz@gsi.de       parasite X6 Pb   11.4 2 TnA >1ms 6 06.-07.03.2006                     06.03.2006 07.03.2006 prio:2 text:"UBIO, Scholz, Pb, 11.4, 2 TnA, >1ms, X6" 13.01.2006 27.01.2010
1850 19.04.2006 S000 2006-2 machine experiments             SIS                                   19.04.2006 20.04.2006 prio:2 text:"S000, machine experiments, 40Ar" 19.04.2006 27.01.2010
1855 13.12.2005 S317 High-Intensity Effect and Beam Loss Issues in FAIR Hofmann +49 6159 71 2409 I.Hofmann@gsi.de Franchetti +49 6159 712410 G.Franchetti@gsi.de Main SIS/UNILAC Ar40+,Xe,N,Ne: ion which garantees high reproducibility and allow to reach space charge limit   11.4 MeV/u, SIS18 injection energy maximum intensity (space charge limit)   6 shifts, 2 shifts per day for 3 days Block 3, autum/winter 2006                     27.02.2006 01.03.2006 prio:3 text:"S000, 106Ag, SIS-experiment" 13.12.2005 27.01.2010
1550 08.02.2006 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasitic to therapy; full UNILAC intensity X1 12C no 6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 3 shifts (nights only) 26.-28.06. (3 night shifts) or end of 25. KW 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 26.06.2006 26.06.2006 prio:2 text:"U210, Novikov/Schaedel, 12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 5 Hz, 5 ms, X1" 08.02.2006 27.01.2010
1860 13.12.2005 S317 High-Intensity Effect and Beam Loss Issues in FAIR Hofmann +49 6159 71 2409 I.Hofmann@gsi.de Franchetti +49 6159 712410 G.Franchetti@gsi.de Main SIS/UNILAC Ar40+,Xe,N,Ne: ion which garantees high reproducibility and allow to reach space charge limit   11.4 MeV/u, SIS18 injection energy maximum intensity (space charge limit)   6 shifts, 2 shifts per day for 3 days Block 3, autum/winter 2006                     04.04.2006 08.04.2006 prio:3 text:"S000 86Kr, SIS-experiment" 13.12.2005 27.01.2010
1865 02.03.2006 S000 2005-3 P.Spaedtke             SIS 107Ag                                 02.03.2006 07.03.2006 prio:4 text:"U (MEVVA) test" 02.03.2006 27.01.2010
1000189 18.01.2011 S000 B-Experimente Spiller           main SIS             17.10.-21.10.2011 no no no no no no no no no no 25.10.2011 30.10.2011 prio:1 text:"S000, Spiller, SIS" 18.01.2011 26.09.2011
1599 28.02.2006 U219 TASCA commissioning Schaedel, M. 2460 m.schadel@gsi.de Schaedel     parasite X8 50Ti   4.5-6.0 MeV/u 1 pmicroA (Pulse), 5 ms, 5 Hz   6 16.-17.May (end of SHIP experiment) no no no no no 0.5 mbar He, ca. 200 cm (gas-filled separator) no no no no 16.05.2006 17.05.2006 prio:2 text:"U219, Schaedel, 54Cr, 4.5-6.0 MeV/u, 1 pmicroA (Pulse), 5 ms, 5 Hz, X8" 28.02.2006 27.01.2010
1000187 18.01.2011 S000 B-Experimente Spiller           main SIS             27.06.-01.07.2011 no no no no no no no no no no 27.06.2011 30.06.2011 prio:1 text:"S000, Spiller, Ta (MEVVA), SIS" 18.01.2011 31.05.2011
1620 20.03.2006 UMAT Material science Fischer 2561 B.Fischer@gsi.de Heiß 2715 M.Heiss@gsi.de main X0 Xe or heavier (alternatively O or lighter)   4.8 MeV/u max max macro-pulse, min energy spread 12 End of May 2006 no no no no no 50µm air no no no no 24.05.2006 26.05.2006 prio:1 text:"UMAT, Fischer/Heiß, 7Li, 4.8 MeV/u, 50Hz, 5ms, min energy spread, X0" 20.03.2006 27.01.2010
1640 20.03.2006 UMAT Material science Trautmann 2716 c.trautmann@gsi.de Trautmann 2716 c.trautmann@gsi.de main X0 U - 11.4 MeV/u max 5ms, 50 Hz if possible 9 10.-12.8.06 oder in anderer Lücke no no no no no no no no no no 08.08.2006 09.08.2006 prio:1 text:"UMAT, Trautmann/Trautmann, U, 11.4 MeV/u, max, 1ms, 5 Hz or higher, X0" 20.03.2006 27.01.2010
1960 04.07.2006 E077 Beta decay of highly charged ions Bosch 2713 f.bosch@gsi.de       main ESR 147Sm (PIG) no 450-500 MeV/u 1e8/spill SIS-cooler 30 January 2007 no no no no no no no no no no 19.01.2007 10.02.2007 prio:1 text:"E077, Bosch, Litvinov 152Sm (PIG), 450-500 MeV/u, 1e8/spill, SIS-cooler, ESR/FRS" 04.07.2006 27.01.2010
1793 02.11.2005 U223 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de Hofmann 2734/2685 s.hofmann@gsi.de main Y7 50Ti   5.00 MeV/u 1 pmicroA   2 * 105 2006-2007   alcohol for cooling         +-300kV       19.01.2007 14.02.2007 prio:1 text:"U223, Hofmann/Hofmann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, Y6" 02.11.2005 27.01.2010
1000175 11.01.2011 B Inbetriebnahme Dahl           main UNILAC   40 Ar 11.4 MeV/u       28.-31.03.2011                     28.03.2011 31.03.2011 prio:1 text:"B, Dahl, 40Ar (MUCIS), UNILAC" 11.01.2011 20.01.2011
1000176 11.01.2011 B Inbetriebnahme Spiller           main SIS   40 Ar 300 MeV/u       28.-31.03.2011                     29.03.2011 31.03.2011 prio:1 text:"B, Spiller, 40Ar (MUCIS), SIS" 11.01.2011 10.02.2011
1631 20.03.2006 SMAT Material science Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de main HTA U - 150 MeV/u 3e8 ions/spill - 9 10.-12.8.06 no no no no no 50 cm air no no no no 05.03.2007 07.03.2007 prio:2 text:"SMAT, Trautmann, Pb, 150 MeV/u, 3e8 ions/spill, HTA" 20.03.2006 27.01.2010
1925 24.05.2006 UBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de parasite or main X6 C   11.4 MeV 2 TnA 5 ms 9 04.12.-06.12.                     05.12.2006 07.12.2006 prio:2 text:"UBIO, Scholz/Scholz, C, 11.4 MeV, 2 TnA, 50Hz, 5 ms, X6" 24.05.2006 27.01.2010
1935 29.05.2006 S302 HED matter generated by intense heavy ion beams Mintsev   minvb@icp.ac.ru Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT 238U73+ (PIG)   300-400 MeV/u 5e9/spill fast extraction, bunch compression, SIS cooler 18 11-17.12.2006 no no no no no no no no no no 11.12.2006 17.12.2006 prio:2 text:"S302, Mintsev/Varentsov, 238U73+ (PIG), 300-400 MeV/u, 5e9/spill, fast extraction, bunch compression, SIS cooler, HHT" 29.05.2006 27.01.2010
1561 17.02.2006 STHE-PT03 Development of PET Enghardt 0351-458-7411 Wolfgang.Enghardt@oncoray.de Schardt 2432 D.Schardt@gsi.de 12C: Therapy nights, 16O: main or parasite (with ~ 30 min continuous irradiation) HTM 12C, 16O   12C: as for therapy, 16O: 100-420 MeV/u 1e7-2e8/spill Extraction as for therapy 12C: 2 shifts, 16O: 4shifts 16O: asap, 2 runs of 2 shifts each, not Sept 2006, 12C: during therapy times         22Na (15 MBq), 68Ge (30 MBq), PET calibration sources, 1 m through air         17.02.2007 18.02.2007 prio:1 text:"STHE, Enghardt/Schardt, 16O: 100-420 MeV/u, 1e7-2e8/spill, HTM / HTA" 17.02.2006 27.01.2010
1721 12.04.2006 U221 Diamant Detector test Braeuning-Demian 2711 a.braeuning-demian@gsi.de Mann 2724 r.mann@gsi.de main X4 238U   5 MeV/u bis 11.4 MeV/u     6 12 und 13 May no none thin foil window , ~ 20 mm^2 no no Yes, ~50 mm no no no none 03.12.2006 04.12.2006 prio:1 text:"U221, Braeuning-Demian/Mann, 238U, 5 MeV/u bis 11.4 MeV/u, ,<5Hz, 1ms, X4" 12.04.2006 27.01.2010
1996 12.10.2006 U216 RBS Commissioning Bender 1362 m.bender@gsi.de Bender 1362 m.bender@gsi.de parasite UU 12C2+   1.4MeV/u few nA 5ms, >25Hz 8 13.-15. Nov. 2006     standard UHV viewport               12.12.2006 14.12.2006 prio:1 text:"U216, Bender/Bender, 136Xe, 1.4MeV/u, few nA, 5ms, >25Hz, HLI, UU" 12.10.2006 27.01.2010
1994 11.05.2009 U000 Inbetriebnahme UNILAC               UNILAC                                   11.05.2009 13.05.2009 prio:1 text:"U000" 11.05.2009 27.01.2010
1950 30.06.2006 UBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de parasite X6 U   11.4 MeV 2 TnA   9 13.12.-15.12.                     13.12.2006 16.12.2006 prio:2 text:"UBIO, Scholz/Scholz, U, 11.4 MeV, 2 TnA, X6" 30.06.2006 27.01.2010
1140 08.12.2006 S297 Kaon Flow Herrmann 2768 n.herrmann@gsi.de Leifels 2767 y.leifels@gsi.de main HTB 12C,56Fe   1.5GeV 1e8/spill max. extraction 3 any time 2005, after Al production run Drift chambers (Ar, CH4, C4H8)   50 mu Ti exit window beam pipe     from exit window to Cave wall (15 m)         02.03.2007 04.03.2007 prio:3 text:"S325, Herrmann/Kim, 12C, 1.5 GeV, 1e8/spill, max. extraction, days only, HTB" 08.12.2006 27.01.2010
1945 26.06.2006 S301 Dielectron production in pp,dp Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Pietraszko 2151, 2147 j.stroth@gsi.de, j.pietraszko@gsi.de Main user HAD 1H, 2H   1250 and 3500 MeV 10^8 / spill 10 s extraction, perfect spill structure, small intensity variations from spill to spill, minimized halo 128+12 first block in 2007, not in blocks with therapy i-Butane, Methane, Hydrogen none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 07.05.2007 20.05.2007 prio:1 text:"S301, Salabura/Stroth, 2H (MUCIS) 1250 MeV, 10^8 / spill, 10 s extraction, perfect spill structure, small intensity variations, minimized halo, HAD" 26.06.2006 27.01.2010
1970 05.07.2006 S327 Dipole response of 32Ar and 34Ar Boretzky 2668 k.boretzky@gsi.de Aumann 1408 t.aumann@gsi.de main HTC 040 Ca (Penning?)   800 MeV/u 1e10 ions/spill (SIS) slow extraction 30 2007 Ethan, 5l/h   vacuum window, 20 cm   gamma-calibration sources 40Ca, 32,34Ar through air 10 m 2.5 kV, 3 mA       23.08.2008 31.08.2008 prio:1 text:"S327, Boretzky/Aumann, 36Ar (MUCIS), 800 MeV/u, 1e10/spill, slow extr., FRS-HTC" 05.07.2006 27.01.2010
1000200 24.01.2011 S367 Opacity Measurements in Warm Dense Matter Tauschwitz     Tauschwitz     parasite HHT U73+   250 MeV/u >4E9 single bunch, bunch compressor, SIS cooler 12                           prio:3 text:"S367, Tauschwitz, U73+, 250 MeV/u, >4E9, single bunch, bunch compressor, SIS cooler, HHT" 24.01.2011 24.05.2011
1401 02.12.2005 U218 Coulomb excitation of 112, 114, 116Sn Doornenbal 06159-71 2738 p.doornenbal@gsi.de Doornenbal 06159-71 2738 p.doornenbal@gsi.de main X6 136Xe   3.6MeV/u 5pnA   3 times 7 Starting from April 2006 but not in the second week of may 2006                     07.07.2006 07.07.2006 prio:2 text:"U218, Doornenbal/Doornenbal, 136Xe, 3.6 MeV/u, X7" 02.12.2005 27.01.2010
1551 08.02.2006 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasitic to therapy; full UNILAC intensity X1 12C no 6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 3 shifts (nights only) 26.-28.06. (3 night shifts) or end of 25. KW 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 08.07.2006 09.07.2006 prio:2 text:"U210, Novikov/Schaedel, 12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 5 Hz, 5 ms, X1" 08.02.2006 27.01.2010
1552 08.02.2006 U210 Missing alpha-emitters in the transuranium region Novikov   Y.Novikov@gsi.de Schaedel 2460 m.schaedel@gsi.de parasitic to therapy; full UNILAC intensity X1 12C no 6.5 - 7.5 MeV/u >= 500 pnA, 50 Hz 5 ms 3 shifts (nights only) 26.-28.06. (3 night shifts) or end of 25. KW 1 L/min He (He/KCl-jet) Be window Be window (in closed apparatus) no Gamma- and alpha- calibration source ca. 10 cm 1 bar He in recoil chamber no no no open radioactivity, Th-232 target 28.06.2006 28.06.2006 prio:2 text:"U210, Novikov/Schaedel, 12C, 6.5 - 7.5 MeV/u, >= 500 pnA, 5 Hz, 5 ms, X1" 08.02.2006 27.01.2010
2000 21.05.2007 U000 2007-2 machine experiments             UNILAC                                   21.05.2007 23.05.2007 prio:1 text:"U000, Ar (MUCIS) machine experiments" 21.05.2007 27.01.2010
1995 10.11.2006 FRS000 Inbetriebnahme FRS               FRS-S4                                   10.11.2006 11.11.2006 prio:3 text:"FRS000, Start FRS, at day" 10.11.2006 27.01.2010
1794 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 20.01.2007 20.01.2007 prio:2 text:"U223 -X4, Hofmann/Hofmann, 48Ca, copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1796 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 24.01.2007 24.01.2007 prio:2 text:"U223 -X4, Hofmann/Hofmann, 48Ca, copy of Y7 but only 1 Hz, X4 (R. Mann)" 22.03.2006 27.01.2010
1944 26.06.2006 S301 Dielectron production in pp,dp Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Pietraszko 2151, 2147 j.stroth@gsi.de, j.pietraszko@gsi.de Main user HAD 1H, 2H   1250 and 3500 MeV 10^8 / spill 10 s extraction, perfect spill structure, small intensity variations from spill to spill, minimized halo 128+12 first block in 2007, not in blocks with therapy i-Butane, Methane, Hydrogen none carbon composite vaccum vessel, < 1 liter     8 m air       super conducting magnet 13.04.2007 06.05.2007 prio:1 text:"S301, Salabura/Stroth, 1H (MUCIS) 3500MeV, 10^8 / spill, 10 s extraction, perfect spill structure, small intensity variations, minimized halo, HAD" 26.06.2006 27.01.2010
55121 06.12.2006 U207 Optical spectroscopy of nobelium Backe 06131-3925563 backe@kph.uni-mainz.de Herfurth 1360 Frank.Herfurt@gsi.de Main Y7 48Ca   5 MeV/u 320 pnA   6 1-2 weeks after 52Cr beamtime XeF, XeCl 10l   thin foil window       5 kV/nA   Excimer/Dye (20 W), Nd:YAG/OPO (25W)   17.08.2007 21.08.2007 prio:1 text:"U207, Backe/Herfurth, 48Ca, 5 MeV/u, 320 pnA, Y7" 06.12.2006 27.01.2010
15969 19.02.2007 U225 Nuclear Structure Investigations of SHE Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de Main Y7 054 Cr (ECR)   4.6 - 5.1 MeV/u 2000 pnA, 50 Hz (Ar), 1000 pnA 50 Hz (Cr) 5 ms 36 summer 2007 no ethanol for detector cooling no no no no no no no high beam currents 17.10.2007 21.10.2007 prio:1 text:"U225, Heßberger, 40Ar (PIG), 4.5 - 5 MeV/u, 2000 pnA, 50 Hz, 5-5.5 ms, Y7" 19.02.2007 27.01.2010
56761 13.12.2006 SMAT Materials research Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de parasite in block sharing mode HTA 208Pb - 200 MeV/u max.   9 11.-13.7.07 no no no no no 50 cm air no no no no 11.07.2007 13.07.2007 prio:3 text:"SMAT, C. Trautmann, Pb (PIG), 200 MeV/u, max., HTA, block sharing mode" 13.12.2006 27.01.2010
1915 23.05.2006 S249 Precise Measurement of Stopping Power Golubev +74951274735 alexander.golubev@itep.ru Mustafin 2224 E.Mustafin@gsi.de parasite HTA Ar   1600 MeV/u 1e7/spill SIS   8 November 2006                     08.12.2006 10.12.2006 prio:2 text:"S249, Golubev/Mustafin, Ar, 1600 MeV/u, 1e7/spill SIS, days only HTA" 23.05.2006 27.01.2010
1904 14.11.2003 E045 Two-electron Lamb shift... Stoehlker 2712 t.stoehlker@gsi.de         ESR U91+, U92+   350 MeV/u 1e8 in ESR SIS cooler, deceleration in ESR to 20-50 MeV/u 21 2004 block 3-4     Thin Fe X-ray window               10.08.2006 15.08.2006 prio:2 text:"E045, Stoehlker, 114Sn(ECR), 116Sn(PIG), 100-200MeV/u, 1e8 in ESR, SIS cooler, electron cooler, ESR" 14.11.2003 27.01.2010
1975 13.07.2006 S223 Coul.Diss. of 23Al / Cave C commissioning Suemmerer 2737 k.suemmerer@gsi.de Aumann 1408 t.aumann@gsi.de parasite, therapy days HTC 12C - 500 1E3/spill slow extraction 2 * 3shifts parasitic /days only 3 days week 47, 3 days week 49 Ar/C2H6 (50%/50%) for drift chambers - - - - - - - - - 06.12.2006 07.12.2006 prio:3 text:"S223, Suemmerer/Aumann, 12C, 500, 1E3/spill, slow extraction, days only, HTC" 13.07.2006 27.01.2010
1251 09.06.2005 S280 R&D on Synthetic Diamond Detectors Berdermann 2207 / 2277 E.Berdermann@gsi.de       parasite, 1:3, FRS main user FRS 84Kr and 131Xe - 100 MeV/u, 500 MeV/u and 1 GeV/u 1e9/spill spill=8s 18 spring or early summer 2006             max. 1kV       12.11.2006 17.11.2006 prio:4 text:"S312, FRS" 09.06.2005 27.01.2010
1999 03.11.2005 S223 Coul.Diss. of 23Al Suemmerer 2737 k.suemmerer@gsi.de - - - Main HTC 36Ar - 350     36 >= July/August 2006 Ar/C2H6 (50%/50%) for drift chambers - - - - - - - - - 21.05.2007 23.05.2007 prio:2 text:"S223, Suemmerer, Ar (MUCIS), 350 MeV/u, HTC, nights only" 03.11.2005 27.01.2010
1991 22.08.2006 S312 Beta-decay spectroscopy south of 208-Pb J. Benlliure (34) 981563100 ext:13967 j.benlliure@usc.es J.Gerl 2643 j.gerl@gsi.de main FRS 208 Pb   1000 MeV/u 1e9/spill (SIS) 4-10 s extraction 21 shifts beginning 2007 no no no no no yes (10 particles per second) no no no no 08.07.2007 08.07.2007 prio:3 text:"S312, J. Benlliure/J.Gerl, 208Pb, 1000 MeV/u, 1e9/spill (SIS), 4-10 s extraction, FRS-S4" 22.08.2006 27.01.2010
609256 01.01.2008 B Irradiation of SC magnet components Mustafin             HHD                                   02.04.2008 02.04.2008 prio:3 text:"B, Mustafin, 58 Ni (PIG), 1930 MeV/u , HHD" 01.01.2008 27.01.2010
1737 25.04.2006 U068 Response of Calorimetric Detectors Egelhof 2662 p.egelhof@gsi.de Egelhof 2662 p.egelhof@gsi.de main Z6 18O   several energies 50 pnA, 50 Hz   6 22.-23.5.06 4He cryostat no 4He cryostat no no no no no no no 26.05.2006 26.05.2006 prio:2 text:"U068, Egelhof/Egelhof, 7Li, several energies, 50 pnA, 50 Hz, Z7" 25.04.2006 27.01.2010
1792 02.11.2005 U184 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de Hofmann 2734/2685 s.hofmann@gsi.de main Y7 50Ti   5.00 MeV/u 1 pmicroA   2 * 105 2006-2007   alcohol for cooling         +-300kV       02.10.2006 29.10.2006 prio:1 text:"U184, Hofmann/Hofmann, 48Ca (ECR), 5.0 MeV/u, 1 pmicroA, Y6" 02.11.2005 27.01.2010
1920 24.05.2006 UMAT material modification trautmann 2716 c.trautmann@gsi.de Trautmann Christina 2716 c.trautmann@gsi.de Main X0 Uran no 11.4 MeV/u 10 nA 1ms, 5Hz, (larger if possible) 9 28-30.11.2006 no no no no no no no no no no 28.11.2006 02.12.2006 prio:1 text:"UMAT, trautmann/Trautmann Christina, Uran, 11.4 MeV/u, 10 nA, 1ms, 5Hz, (larger if possible), X0" 24.05.2006 27.01.2010
1930 24.05.2006 S279 Kaonic Cluster Herrmann 2768 N.Herrmann@gsi.de Schuettauf 2768 A.Schuettauf@gsi.de Parasite HTB 12C   1-2 AGeV 0.5 Mhz 10 s extraction 3 01.11.06 CDC, Helitron operational with Gas Argon,Isobutan, Methan, 20l/h         12C, 1-2AGeV, 0.5 MHz     Nitrogen laser for calibration   20.11.2006 21.11.2006 prio:3 text:"S279, Herrmann/Schuettauf, 12C, 1-2 AGeV, 5e5/s, 10 s extraction, HTB" 24.05.2006 27.01.2010
1990 22.08.2006 S312 Beta-decay spectroscopy south of 208-Pb J. Benlliure (34) 981563100 ext:13967 j.benlliure@usc.es J.Gerl 2643 j.gerl@gsi.de main FRS 208 Pb   1000 MeV/u 1e9/spill (SIS) 4-10 s extraction 21 shifts beginning 2007 no no no no no yes (10 particles per second) no no no no 09.07.2007 17.07.2007 prio:2 text:"S312, J. Benlliure/J.Gerl, 208Pb (PIG), 1000 MeV/u, 1e9/spill (SIS), 4-10 s extraction, FRS-S4" 22.08.2006 27.01.2010
60561 27.02.2007 U182 Hs chemistry Kratz, J.V. 06131-39-25704 jvkratz@uni-mainz.de Schaedel 2460 m.schaedel@gsi.de parasitic X1 040 Ar (PIG)   7-9 MeV/u 1 pmicroA (Pulse) 5 ms, 5 Hz 3 x 2 shifts separated by > 1 d October 2007 no no Be vacuum window in closed apparatus no no 10 cm He at 1 bar in closed apparatus no no no open radioactivity 21.10.2007 21.10.2007 prio:2 text:"U182, Kratz, J.V./Schaedel, 40Ar (Penning), 7-9 MeV/u, 1 pmicroA (Pulse), 5 ms, 5 Hz, X1" 27.02.2007 27.01.2010
17960 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 13.04.2007 13.04.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
11701 06.12.2004 S296 Quasifree Hadronic Scattering Studies of Exotic Nuclei Lemmon +44 (0)1925 603926 R.Lemmon@dl.ac.uk Aumann   T.Aumann@gsi.de main HTC 012 C6+   700 MeV/u 1e5/spill (SIS)   27 Block 4 : September 14 - November 24, 2005 We use the LAND/ALADIN setup (liquid hydrogen target, isobutane gas detectors, etc.)                   23.09.2007 25.09.2007 prio:3 text:"S296, Lemmon/Aumann, 12C6+, 700 MeV/u, 1e5/spill, HTC" 06.12.2004 27.01.2010
17962 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 24.04.2007 24.04.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
1646 20.03.2006 UMAT Material science Trautmann 2716 c.trautmann@gsi.de Trautmann 2716 c.trautmann@gsi.de main X0 Sn - 11.4 MeV/u max 5ms, 50 Hz if possible 6-9 13.-15.8.06 no no no no no no no no no no 10.07.2006 14.07.2006 prio:1 text:"UMAT, Trautmann/Trautmann, U, 11.4 MeV/u, max, 1ms, 5 Hz or higher, 13-14.7 nights only, X0" 20.03.2006 27.01.2010
17964 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 30.04.2007 30.04.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
17965 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 04.05.2007 04.05.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
17966 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 07.05.2007 07.05.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
17967 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 11.05.2007 11.05.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
17968 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 14.05.2007 14.05.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
17969 22.03.2006 U223-X4 48Ca / Energy -Control Hofmann     Hofmann 2734/2685 s.hofmann@gsi.de parasitic , parallel to main X4 48Ca   4.8-5.6 MeV/u 500 pnA / 1-2 Hz ( 10% Y7) copy of Y7 but only 1 Hz 3 1st block 2007 -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 18.05.2007 18.05.2007 prio:2 text:"U223 -X4, Hofmann/Mann, 64Ni, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
56101 11.12.2006 S330 100Sn Faestermann     Gorska   m.gorska@gsi.de parasite FRS 124 Xe 124Xe 1000 MeV/u 1e8/spill 4s extraction 21 Block 4, preferably October no no no no no Sn isotopes, <1e4/spill, few meters no no no no 16.09.2007 22.09.2007 prio:2 text:"S330, Faestermann/Gorska, 129Xe (PIG), 1000 MeV/u, 1e8/spill, 4s extraction, FRS S4" 11.12.2006 27.01.2010
19702 05.07.2006 S327 Dipole response of 32Ar and 34Ar Boretzky 2668 k.boretzky@gsi.de Aumann 1408 t.aumann@gsi.de main HTC 040 Ca (Penning?)   800 MeV/u 1e10 ions/spill (SIS) slow extraction 30 2007 Ethan, 5l/h   vacuum window, 20 cm   gamma-calibration sources 40Ca, 32,34Ar through air 10 m 2.5 kV, 3 mA       15.07.2008 16.07.2008 prio:2 text:"S245, Boretzky/Aumann, 12C (EZR), 800 MeV/u, slow extr., FRS-HTC" 05.07.2006 27.01.2010
609222 01.01.2009 B 2008-1 P. Forck     E.Guetlich       UNILAC                                   09.10.2008 10.10.2008 prio:2 text:"B, Forck, Guetlich, 64Ni (EZR), 11,4 MeV/u, max intens., X2" 01.01.2009 27.01.2010
609251 01.01.2008 B Inbetriebnahme TK               SIS                                   16.01.2008 12.02.2008 prio:1 text:"Inbetriebnahme TK, 40Ar (MUCIS)" 01.01.2008 27.01.2010
609221 01.01.2008 B 2008-1 P. Forck     E.Guetlich       UNILAC                                   22.01.2008 17.02.2008 prio:3 text:"B, Forck, Guetlich, 64Ni (EZR) or 40Ar (MUCIS), same energy as main user, X2" 01.01.2008 27.01.2010
71701 30.11.2007 UMAT UMAT C. Trautmann 2716 c.trautmann@gsi.de C.Trautmann 2716 c.trautmann@gsi.de beides möglich X0 Ta (KW14) und U(KW19)   11.4     6-12 shifts Ta (KW14) und U(KW19)                     27.08.2008 31.08.2008 prio:1 text:"UMAT, C. Trautmann, 197Au (PIG), 11.4 MeV/u, 50Hz, X0" 30.11.2007 27.01.2010
55895 11.12.2006 E073 Electron Screening and alpha-decay Musumarra +39-095-542297 musumarra@lns.infn.it Nociforo +49-6159-712741 c.nociforo@gsi.de main FRS 238 U   400-600 MeV/u 1e9/spill SIS cooler 21 Summer 2007 no no no no no no no no no no 30.04.2008 03.05.2008 prio:1 text:"E073, Musumarra/Nociforo, 238U (MEVVA), 400-600 MeV/u, 1e9/spill, SIS cooler, vacuum at S2, FRS" 11.12.2006 27.01.2010
68701 31.10.2007 U217 Mass Measurements at SHIPTRAP Block 2148 m.block@gsi.de Block 2148 m.block@gsi.de Parasitic to therapy / Y7 12Ca (ECR)   5 MeV/u >1000pnA, 50Hz 5ms 12 25.06.08 - 28.06.08     Window foil between SHIP and SHIPTRAP               04.08.2008 10.08.2008 prio:1 text:"U238 , Block, 48Ca (ECR) , 5 MeV/u, >1000pnA, 50Hz , 5ms, Y7" 31.10.2007 27.01.2010
69291 13.11.2007 S347 Along the N=126 closed shell Podolyak +44-1483-686811 Z.Podolyak@surrey.ac.uk Magda Gorska 2917 M.Gorska@gsi.de 18 shifts main + 6 shift parasitic beam RISING (FRS S4 area) 238U, MEVVA source no 1000 MeV/u maximum available, towards 1e10/spill   24 (18+6 parasitic) no restrictions standard gas detectors (MUSIC and MW)   FRS S4 area, foil windows no no ~202Os, 100 MeV/u, 10 ion/spill, air, 2m no no no   19.04.2008 26.04.2008 prio:2 text:"S347, Podolyak/Gorska, 238U, MEVVA source, 1000 MeV/u, maximum available, 2E9/spill, RISING (FRS S4 area)" 13.11.2007 27.01.2010
197011 05.07.2006 S327 Dipole response of 32Ar and 34Ar Boretzky 2668 k.boretzky@gsi.de Aumann 1408 t.aumann@gsi.de main HTC 040 Ca (Penning?)   800 MeV/u 1e10 ions/spill (SIS) slow extraction 30 2007 Ethan, 5l/h   vacuum window, 20 cm   gamma-calibration sources 40Ca, 32,34Ar through air 10 m 2.5 kV, 3 mA       19.08.2008 19.08.2008 prio:2 text:"S327, Boretzky/Aumann, 40Ar (MUCIS), 800 MeV/u, slow extr., nights only, FRS-HTC" 05.07.2006 27.01.2010
77891 02.07.2008 UMAT Materialforschung C.Trautmann     C.Trautmann     Parasite X0 64Ni   11.4 MeV/u long pulses (4 ms)   12 Week 37/38                     19.10.2008 19.10.2008 prio:2 text:"UMAT, C.Trautmann/ Voss, 65Ni, 11.4 MeV/u, X0" 02.07.2008 27.01.2010
609255 01.01.2008 B Irradiation of SC magnet components Mustafin             HHD                                   06.05.2008 12.05.2008 prio:1 text:"B, Mustafin, 238U (MEVVA), 1GeV/u 3E9/pulse, HHD" 01.01.2008 27.01.2010
567611 13.12.2006 SMAT Materials research Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de parasite in block sharing mode HTA 238 U - 200 MeV/u 3e8 ions/spill 1 s extraction 12 1.-7.6.07 no no no no no 50 cm air no no no no 03.03.2008 03.03.2008 prio:1 text:"SMAT, C. Trautmann, 124Xe (MUCIS), 200 MeV/u, 1E9/spill, HTA" 13.12.2006 27.01.2010
567612 13.12.2006 SMAT Materials research Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de parasite in block sharing mode HTA 238 U - 200 MeV/u 3e8 ions/spill 1 s extraction 12 1.-7.6.07 no no no no no 50 cm air no no no no 24.03.2008 24.03.2008 prio:1 text:"SMAT, C. Trautmann, 132Xe (PIG), 200 MeV/u, 1E9/spill, HTA" 13.12.2006 27.01.2010
604921 27.02.2007 S325 Charched Kaon studies Herrmann 2768 N.Herrmann@gsi.de Y.Leifels 2767 Y.Leifels@gsi.de Main HTB NI 58+ no 1930 Mev/u 1e7/spill(SIS) 10 s extraction 45 summer 2007           Yes, Start-system to Target 2m         29.02.2008 02.03.2008 prio:2 text:"S325, Herrmann/Y.Leifels, 64Ni (EZR), max. energy, 1e7/spill(SIS), 10 s extraction, HTB" 27.02.2007 27.01.2010
15578 09.08.2004 M000 Therapy 2008-2 Haberer 2627 T.Haberer@gsi.de       main HTM 12C (ECR)         87 2007 block 4                     01.07.2008 29.07.2008 prio:1 text:"Therapy, Haberer, 12C (EZR), HTM" 09.08.2004 27.01.2010
70301 22.11.2007 E074 Radiative Double Electron Capture in bare HCI Warczak +48 12 663 5658 ufwarcza@cyf-kr.edu.pl Steck, (Braeuning-Demian) (2711) a.braeuning-demian@gsi.de parasite ESR 132 Xe 54+   400 MeV/u (SIS), 20 MEV/u (ESR) 1e8/spill in ESR slow extraction from ESR to HTA, cooled,bare Xe ions, 21 March 2008 (in block with E000) no none   no   no no no no none 14.03.2008 21.03.2008 prio:2 text:"E074 / E076, Warczak/Steck, (Braeuning-Demian), 124Xe 54+, 400 MeV/u(SIS), 20 MEV/u (ESR), 1e8/spill in ESR, slow extr. from ESR to HTA, cooled,bare Xe ions, ESR-HTA" 22.11.2007 27.01.2010
72091 04.12.2007 UMAT UMAT Voss, Kay-Obbe 2169 k.-o.@gsi.de Voss, K.-O. 2169 k.-o.voss@gsi.de beides möglich? X0 C   4.8 ~50Hz ~5ms 6-9 shifts Woche 16 oder 17                     25.04.2008 28.04.2008 prio:1 text:"UMAT, Trautmann, 197Au (PIG), 11.4 MeV/u, 50Hz, 5ms, X0" 04.12.2007 27.01.2010
52284 10.10.2006 U221 Diamant Detector test Braeuning-Demian 2711 a.braeuning-demian@gsi.de Braeuning-Demian 2711 a.braeuning-demian@gsi.de main HTA 238 U   5 MeV/u bis 11.4 MeV/u     6 December 2006 no none thin foil window , ~ 20 mm^2 no no Yes, ~50 mm no no no none 29.02.2008 01.03.2008 prio:1 text:"U221, Braeuning-Demian, 124 Xe (MUCIS), 100 MeV/u, HTA" 10.10.2006 27.01.2010
13271 05.11.2005 STHE-PT07 ALTEA Narici +39 06 72594519 livio.narici@roma2.infn.it Schardt 06159 71 2432 D.Schardt@gsi.de main / therapy nights HTA C to Ni   100 to 800 MeV/n 1e2 to 1e4 and 1e9 1-3 ms spill for some irradiations 6 4th block 2007                     27.03.2008 31.03.2008 prio:2 text:"SBIO-PT07, Narici/Schardt, 12C (ECR), 100 to 800 MeV/u, 1e2 to 1e4 and 1e9, 1-3 ms spill, nights only,HTA" 05.11.2005 27.01.2010
18701 15.10.2007 SiSt   Fehrenbacher             HTA 012 C         7 days 4th block parallel to therapy                     15.10.2007 21.10.2007 prio:2 text:"SiSt, Fehrenbacher, 12C, (EZR), 200 MeV, days only,HTA" 15.10.2007 27.01.2010
179621 22.03.2006 U230-X4 40Ar / Energy -Control Antalic     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 01.10.2007 01.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179611 22.03.2006 U228-X4 40Ar / Energy -Control Khuyagbaatar     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 29.06.2007 07.07.2007 prio:2 text:"U228 -X4, Khuyagbaatar/Mann, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179613 22.03.2006 U228-X4 40Ar / Energy -Control Khuyagbaatar     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 27.07.2007 31.07.2007 prio:2 text:"U228 -X4, Khuyagbaatar/Mann, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179615 22.03.2006 U228-X4 40Ar / Energy -Control Khuyagbaatar     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 12.10.2007 14.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179616 22.03.2006 U228-X4 40Ar / Energy -Control Khuyagbaatar     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 16.10.2007 16.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179622 22.03.2006 U230-X4 40Ar / Energy -Control Antalic     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 05.10.2007 07.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179631 22.03.2006 U225-X4 40Ar / Energy -Control Heßberger     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 17.10.2007 17.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179632 22.03.2006 U225-X4 40Ar / Energy -Control Heßberger     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 19.10.2007 20.10.2007 prio:2 text:"B-Experiments, R. Mann, energy measurement for SHIP, 40Ar, copy of Y7 but only 1 Hz, X4" 22.03.2006 27.01.2010
179641 22.03.2006 U200-X4 48Ca / Energy -Control Heßberger     R.Mann     parasitic , parallel to main X4 48Ca       copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 22.08.2007 26.08.2007 prio:3 text:"U200 -X4, Heßberger/Mann, 48Ca, copy of Y7 but only 1 Hz, X4 " 22.03.2006 27.01.2010
68301 23.10.2007 SBIO   Scholz 1340 m.scholz@gsi.de Scholz     therapy nights HTM 12C       therapy conditions 8 in April during therapy nights                     11.04.2008 16.04.2008 prio:2 text:"SBIO, Scholz, 12C, therapy conditions, nights, HTM" 23.10.2007 27.01.2010
567614 13.12.2006 SMAT Materials research Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de parasite in block sharing mode HTA 238 U - 200 MeV/u 3e8 ions/spill 1 s extraction 12 1.-7.6.07 no no no no no 50 cm air no no no no 04.05.2008 05.05.2008 prio:1 text:"SMAT, C. Trautmann, 238U (MEVVA), 200 MeV/u, 1E9/spill, HTA" 13.12.2006 27.01.2010
1000178 11.01.2011 S398 Electrical Conductivity of WDM Udrea   s.udrea@gsi.de Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT U (preferred) or other heavy species   200-500 MeV/u MAXIMUM ( > 4e9/spill for U) fast extraction, preferably SIS cooler 15 2011                         prio:2 text:"S398, Udrea/Varentsov, U (preferred) or other heavy species, 200-500 MeV/u, MAXIMUM ( > 4e9/spill for U), fast extraction, preferably SIS cooler, HHT" 11.01.2011  
60491 27.02.2007 S325 Charched Kaon studies Herrmann 2768 N.Herrmann@gsi.de Y.Leifels 2767 Y.Leifels@gsi.de Main HTB NI 58+ no 1930 Mev/u 1e7/spill(SIS) 10 s extraction 45 summer 2007           Yes, Start-system to Target 2m         14.09.2007 22.09.2007 prio:1 text:"S325, Herrmann/Y.Leifels, 58Ni (MEVVA), 1930 Mev/u, 1e7/spill(SIS), 10 s extraction, HTB" 27.02.2007 27.01.2010
50881 06.09.2006 E075 HITRAP Decelerator Commissioning Kester +496159712047 O.Kester@gsi.de Kester 2047 O.Kester@gsi.de parasite HITRAP any ion with A/q ~ 3   4 MeV/u 1E6/cycle (ESR) Cooling and deceleration in ESR 21 preferable February-March 2007 - - - Installation of HITRAP buncher cavities in re-injection channel - - - - - - 14.05.2007 20.05.2007 prio:2 text:"E075, Kester, 64 Ni (EZR), 4 MeV/u, 1E6/cycle (ESR), Cooling and deceleration in ESR, HITRAP" 06.09.2006 27.01.2010
59691 20.07.2007 U228     2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de Main Y7 040 Ar (PIG)       5 ms 36 summer 2007 no ethanol for detector cooling no no no no no no no high beam currents 24.07.2007 31.07.2007 prio:1 text:"U228, Khuyagbaatar, 40 Ar (PIG), 4.5 - 5 MeV/u, 2000 pnA, 50 Hz (Ar), 5-5.5 ms, Y7" 20.07.2007 27.01.2010
15105 30.01.2006 U217 Mass Measurements at SHIPTRAP Block 2742 m.block@gsi.de       Main Y7 050 Cr / ECR 50Cr 3.4 4.0 MeV/u 100-500 pnA   9 July 2006     Window foil between SHIP and SHIPTRAP   223 Ra, 10kBq.         strong magnetic field, high beam current 03.08.2007 05.08.2007 prio:1 text:"U217, Block, 40Ar (PIG), 3.4 4.0 MeV/u, 1 puA, Y7 - SHIPTRAP" 30.01.2006 27.01.2010
60560 27.02.2007 U182 Hs chemistry Kratz, J.V. 06131-39-25704 jvkratz@uni-mainz.de Schaedel 2460 m.schaedel@gsi.de parasitic X1 040 Ar (PIG)   7-9 MeV/u 1 pmicroA (Pulse) 5 ms, 5 Hz 3 x 2 shifts separated by > 1 d October 2007 no no Be vacuum window in closed apparatus no no 10 cm He at 1 bar in closed apparatus no no no open radioactivity 15.10.2007 15.10.2007 prio:2 text:"U182, Kratz, J.V./Schaedel, 40Ar (Penning), 7-9 MeV/u, 1 pmicroA (Pulse), 5 ms, 5 Hz, X1" 27.02.2007 27.01.2010
60562 27.02.2007 U182 Hs chemistry Kratz, J.V. 06131-39-25704 jvkratz@uni-mainz.de Schaedel 2460 m.schaedel@gsi.de parasitic X1 040 Ar (PIG)   7-9 MeV/u 1 pmicroA (Pulse) 5 ms, 5 Hz 3 x 2 shifts separated by > 1 d October 2007 no no Be vacuum window in closed apparatus no no 10 cm He at 1 bar in closed apparatus no no no open radioactivity 18.10.2007 18.10.2007 prio:2 text:"U182, Kratz, J.V./Schaedel, 40Ar (Penning), 7-9 MeV/u, 1 pmicroA (Pulse), 5 ms, 5 Hz, X8" 27.02.2007 27.01.2010
19911 22.08.2006 S312 Beta-decay spectroscopy south of 208-Pb J. Benlliure (34) 981563100 ext:13967 j.benlliure@usc.es J.Gerl 2643 j.gerl@gsi.de main FRS 208 Pb   1000 MeV/u 1e9/spill (SIS) 4-10 s extraction 21 shifts beginning 2007 no no no no no yes (10 particles per second) no no no no 05.07.2007 07.07.2007 prio:3 text:"S312, J. Benlliure/J.Gerl, 40Ar, 1000 MeV/u, 1e9/spill (SIS), 4-10 s extraction, FRS-S4" 22.08.2006 27.01.2010
1000179 12.01.2011 U264 Direct mass measurements and trap-assisted decay spectroscopy of rare isotopes with SHIPTRAP Block 2845 m.block@gsi.de Block 2845 m.block@gsi.de Main Y7 SHIPTRAP 48Ca (ECR) 48Ca 4-5 MeV/u 1000 pnA, 50Hz 5ms 24 May or June 2010                     13.06.2011 20.06.2011 prio:1 text:"U264, Block, 48Ca (EZR), 4-5 MeV/u, 1000 pnA, 50Hz, 5ms, Y7 SHIPTRAP" 12.01.2011 15.02.2011
11334 16.10.2004 U223 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main Y7 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       19.01.2008 24.03.2008 prio:1 text:"U223, Hofmann, 64 Ni (EZR), 5 MeV/u, 1 puA, Y7" 16.10.2004 27.01.2010
51881 28.09.2006 UMAT material modification trautmann 2716 c.trautmann@gsi.de Trautmann Christina 2716 c.trautmann@gsi.de main X0 0238 U no 11.4 MeV/u 10 nA 5ms, 50Hz, (if possible) 6 1.-3.12.2006 no no no no no no no no no no 08.07.2007 12.07.2007 prio:1 text:"UMAT, K.Voss, Pb (PIG), 11.4 MeV/u, X0" 28.09.2006 27.01.2010
51882 28.09.2006 UMAT material modification trautmann 2716 c.trautmann@gsi.de Trautmann Christina 2716 c.trautmann@gsi.de main X0 0238 U no 11.4 MeV/u 10 nA 5ms, 50Hz, (if possible) 6 1.-3.12.2006 no no no no no no no no no no 28.03.2008 31.03.2008 prio:1 text:"UMAT, C. Trautmann, 12C (EZR), 11.4 MeV/u, 50 Hz, X0" 28.09.2006 27.01.2010
16389 16.05.2007 UBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de parasite X6 12 C   11.4 MeV     9 01.10.-03.10.2007                     16.01.2008 16.01.2008 prio:1 text:"UBIO, Scholz, 208Pb (PIG), 11.4 MeV, X6" 16.05.2007 27.01.2010
11335 16.10.2004 U223 Heavy Elements Hofmann 2734 S.Hofmann@gsi.de       main Y7 64Ni 64Ni 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling         +-300 kV SHIP high voltage       17.01.2008 18.01.2008 prio:2 text:"U223, Hofmann, 64 Ni (EZR), 5 MeV/u, 1 puA, Y7" 16.10.2004 27.01.2010
15577 09.08.2004 M000 Therapy 2008-1 Haberer 2627 T.Haberer@gsi.de       main HTM 12C (ECR)         87 2007 block 4                     27.03.2008 26.04.2008 prio:1 text:"Therapy, Haberer, 12C (EZR), HTM" 09.08.2004 27.01.2010
604911 27.02.2007 S325 Charched Kaon studies Herrmann 2768 N.Herrmann@gsi.de Y.Leifels 2767 Y.Leifels@gsi.de Main HTB NI 58+ no 1930 Mev/u 1e7/spill(SIS) 10 s extraction 45 summer 2007           Yes, Start-system to Target 2m         01.04.2008 10.04.2008 prio:2 text:"S325, Herrmann/Leifels, 58Ni (PIG), 1930 Mev/u, 1e7/spill(SIS), 10s extr., HTB" 27.02.2007 27.01.2010
61891 03.04.2007 S330 Sn-100 Faestermann 089-28912438 thomas.faestermann@ph.tum.de Gorska 2917 M.Gorska@gsi.de main FRS 124Xe2+(MUCIS) >90% 1000MeV/u 4e9/spill (FRS-target) 4 s extraction 57 1. block 2008 early, perhaps 6 shifts of the parasitic time at the beginning no no beam exit at S2 and S4 no no at S2 S4, Sn isotopes,800MeV/u, <1e4/spill, few meters no no no none 03.03.2008 03.03.2008 prio:2 text:"S330, Faestermann/Gorska, 124Xe (MUCIS), 1000MeV/u, 4e9/spill (FRS-target), 4 s extraction, FRS S2 S4" 03.04.2007 27.01.2010
508811 06.09.2006 E075 HITRAP Decelerator Commissioning Kester +496159712047 O.Kester@gsi.de Kester 2047 O.Kester@gsi.de parasite HITRAP any ion with A/q ~ 3   4 MeV/u 1E6/cycle (ESR) Cooling and deceleration in ESR 21 preferable February-March 2007 - - - Installation of HITRAP buncher cavities in re-injection channel - - - - - - 25.08.2008 31.08.2008 prio:2 text:"E075, Kester, 197Au (PIG), 4 MeV/u, 1E6/cycle (ESR), Cooling and deceleration in ESR, HITRAP" 06.09.2006 27.01.2010
61892 03.04.2007 S330 Sn-100 Faestermann 089-28912438 thomas.faestermann@ph.tum.de Gorska 2917 M.Gorska@gsi.de main FRS 124Xe2+(MUCIS) >90% 1000MeV/u 4e9/spill (FRS-target) 4 s extraction 57 1. block 2008 early, perhaps 6 shifts of the parasitic time at the beginning no no beam exit at S2 and S4 no no at S2 S4, Sn isotopes,800MeV/u, <1e4/spill, few meters no no no none 25.03.2008 26.03.2008 prio:1 text:"S330, Faestermann/Gorska, 124Xe (MUCIS), 1000MeV/u, 4e9/spill (FRS-target), nights only, FRS S2 S4" 03.04.2007 27.01.2010
609257 01.01.2008 B Irradiation of SC magnet components Mustafin             HHD                                   09.04.2008 09.04.2008 prio:3 text:"B, Mustafin, 58 Ni (PIG), 1930 MeV/u , HHD" 01.01.2008 27.01.2010
64101 18.05.2007 UMAT Mikrosonde Du 2715 g.du@gsi.de B. Fischer 2651 B.Fischer@gsi.de Main X0 Ni 58Ni 4,8 100pnA 50Hz 9 23-25 sept. 2007 - - - - - 50Hz, long pulse, sharp energy -   - - 25.09.2007 26.09.2007 prio:1 text:"UMAT, Du/B. Fischer, 129Xe (PIG), 4,8 MeV, 50Hz, 5ms, X0" 18.05.2007 27.01.2010
65491 11.07.2007 U234 g-factor measurement in stable Sn isotopes Jungclaus 0034-914977654 andrea.jungclaus@uam.es Wollersheim 49-6159-71 2670 h.j.wollersheim@gsi.de main X6 112,114,116Sn   about 4 MeV/u 2 pnA   18 october 2007 or later                     29.10.2007 30.10.2007 prio:1 text:"U234, Jungclaus/Wollersheim, 116Sn (PIG), about 4 MeV/u, 2 pnA, X7" 11.07.2007 27.01.2010
65492 11.07.2007 U234 g-factor measurement in stable Sn isotopes Jungclaus 0034-914977654 andrea.jungclaus@uam.es Wollersheim 49-6159-71 2670 h.j.wollersheim@gsi.de main X6 112,114,116Sn   about 4 MeV/u 2 pnA   18 october 2007 or later                     27.10.2007 28.10.2007 prio:1 text:"U234, Jungclaus/Wollersheim, 112Sn (ECR), about 4 MeV/u, 2 pnA, X7" 11.07.2007 27.01.2010
1000198 21.01.2011 S411 Commissioning cryogenic stopping cell Dendooven +31 50 363 3615 / 3600 dendooven@kvi.nl Purushothaman 6159 71 2439 sivajip@gmail.com main S4 238U   1000 MeV/u 10^9 /s slow & fast extraction, pulse 4s - 20 ms 15 August-October 2011 5 l/h P10 (MUSIC) none steel window on separate small chamber yes 4 kBq 223Ra yes, ions from FRS, 20 cm of air 10 kV, 2 mA 1 to 5 MHz, 400 W Nd-YAG, 50 mJ, 20 Hz possible use of liquid nitrogen 08.10.2011 11.10.2011 prio:1 text:"S411, Dendooven/Purushothaman, 238U (MEVVA), 1000 MeV/u, 1E9 /s, slow & fast extr., pulse 4s - 20 ms, FRS-S4" 21.01.2011 26.09.2011
60492 27.02.2007 S325 Charched Kaon studies Herrmann 2768 N.Herrmann@gsi.de Y.Leifels 2767 Y.Leifels@gsi.de Main HTB NI 58+ no 1930 Mev/u 1e7/spill(SIS) 10 s extraction 45 summer 2007           Yes, Start-system to Target 2m         10.10.2007 15.10.2007 prio:3 text:"S339, Herrmann/Y.Leifels, 12C (EZR), block mode, HTB" 27.02.2007 27.01.2010
113345 01.01.2008 U223-X4 Heavy Elements, energy control R.Mann           parasite X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling                 21.02.2008 24.02.2008 prio:2 text:"U223, Mann, 64 Ni (EZR), copy of Y7 machine for periodic energy control, 1 Hz, X4" 01.01.2008 27.01.2010
1000202 03.02.2011 E000 (for E087) Breakout from the hot CNO cycles Woods   pjw@ph.ed.ac.uk Litvinov 1758 y.litvinov@gsi.de test ESR 22Ne10+   100-400 MeV/u 1e9 particles/spill (SIS) ESR Cooler, SIS Cooler, fast extraction 5 days, day only, test of stacking, ESR 000 as soon as 22Ne beam is available no no no no no no no no no no 23.05.2011 26.05.2011 prio:4 text:"E000/ E087, Woods/Litvinov, 22Ne10+, 100-400 MeV/u, 1e9 particles/spill (SIS), ESR Cooler, SIS Cooler, fast extr., ESR" 03.02.2011 13.04.2011
113346 01.01.2008 U223-X4 Heavy Elements, energy control R.Mann           parasite X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling                 21.01.2008 18.02.2008 prio:2 text:"U223, Mann, 64 Ni (EZR), copy of Y7 machine for periodic energy control, 1 Hz, X4" 01.01.2008 27.01.2010
1836 01.01.2008 B Beam Diagnostics test Becker             X2                                   07.04.2008 09.04.2008 prio:2 text:"B, Becker/ForcK, 58 Ni (PIG), 11,4 MeV/u , nights only, X2" 01.01.2008 27.01.2010
51883 28.09.2006 UMAT material modification trautmann 2716 c.trautmann@gsi.de Trautmann Christina 2716 c.trautmann@gsi.de main X0 0238 U no 11.4 MeV/u 10 nA 5ms, 50Hz, (if possible) 6 1.-3.12.2006 no no no no no no no no no no 13.01.2008 15.01.2008 prio:1 text:"UMAT, C. Trautmann, 208Pb (PIG), 11.4 MeV/u, X0" 28.09.2006 27.01.2010
16801 29.03.2006 E069   Hagmann             ESR 238 U         12                       02.05.2008 06.05.2008 prio:2 text:"E069, Hagmann, 238U (MEVVA), ESR" 29.03.2006 27.01.2010
60921 01.01.2008 B 2008-1 UNILAC start             UNILAC                                   09.01.2008 10.01.2008 prio:1 text:"UNILAC start, Pb (PIG)" 01.01.2008 27.01.2010
66491 26.07.2007 S333 pion beam test Salabura +48 12 663 5609 salabura@if.uj.edu.pl Stroth, Traxler, Pietraszko 2151, 1348, 2147 j.stroth@gsi.de, M.Traxler@gsi.de, j.pietraszko@gsi.de therapy nights HAD 12C   2.0GeV/u maximum 2s, fast ramping 8 10.10. - 15.10. i-Butane, Methane none       secondary pion beam going through air for about 1 m         16.10.2007 21.10.2007 prio:4 text:"S333, Salabura/Stroth, Traxler, Pietraszko, 12C, 2.0GeV/u, 10E9, 2s extr., fast ramping, nights only, HAD" 26.07.2007 27.01.2010
63691 10.05.2007 U230 Investigation of K isomers in 246Fm Antalic ++421 2 60295 451 s.antalic@gsi.de Hessberger 2735 F.P.Hessberger@gsi.de main Y7 040 Ar not necessary around 4.6 MeV/u 2000 pnA pulse 5.5 ms (UNILAC) 36 during therapy block in october No 20 liters of alcohol for cooling no no no no no no no High beam currents (2000 pnA) 06.10.2007 09.10.2007 prio:1 text:"U230, Antalic/Hessberger, 40 Ar, around 4.6 MeV/u, 2000 pnA, pulse 5.5 ms (UNILAC), Y7" 10.05.2007 27.01.2010
70303 22.11.2007 E000   Steck             ESR               no none   no   no no no no none 12.10.2008 17.10.2008 prio:3 text:"E000, Steck, 64 Ni(EZR), 400 MeV/u, ESR" 22.11.2007 27.01.2010
71491 29.11.2007 U219 TASCA commissioning Schädel 2460 m.schaedel@gsi.de Schädel 2460 m.schaedel@gsi.de Prasitic X8 48Ca(ECR) 48Ca 4.9 MeV/u 1 pµA (DC) 5 ms, 5 Hz 6 3. Block 2008 < 1 mbar He in TASCA no no no no ca. 1.5 m < 1 mbar He in TASCA no no no no 04.08.2008 10.08.2008 prio:2 text:"U219, Schädel, 48Ca(ECR), 4.9 MeV/u, 1 pµA (DC), 5 ms, 5 Hz, X8" 29.11.2007 27.01.2010
60923 01.07.2008 B 2008-3 UNILAC start             UNILAC                                   25.06.2008 26.06.2008 prio:1 text:"UNILAC start" 01.07.2008 27.01.2010
11009 26.01.2010 E000 barrier bucket accumulation Steck 1539 M.Steck @gsi.de       parasite ESR light or medium ion   400 MeV/u 1e8/spill from SIS SIS cooler 15 KW 27 (26) no none no no no no no no no none     prio:4 text:"E000, Steck/Grisenti, 238U, (100-400) MeV/u, SIS cooler, ESR" 26.01.2010 05.05.2010
60801 01.01.2008 B 2008-2 SIS start             SIS                                   27.02.2008 28.02.2008 prio:1 text:"SIS start" 01.01.2008 27.01.2010
60802 01.05.2008 B 2008-3 SIS start             SIS                                   25.06.2008 26.06.2008 prio:1 text:"SIS start" 01.05.2008 27.01.2010
60841 01.07.2008 S000 2008-3 machine experiments             SIS                                   08.05.2008 09.05.2008 prio:4 text:"S000, machine experiments" 01.07.2008 27.01.2010
11010 26.01.2010 SMAT High pressure irradiations Schuster 2173 bea.schuster@gsi.de Trautmann 2716 C.Trautmann@gsi.de main HTA 238U   150-350 MeV/u 3e8/spill   12 5.-8. May 2010 parallel to HHT no no no no no 45 cm air no no no no 05.05.2010 11.05.2010 prio:1 text:"SMAT, Schuster, 238U, 150-350 MeV/u, 3e8/spill, HTA" 26.01.2010 10.05.2010
60925 01.01.2008 B Inbetriebnahme TK               SIS                                   25.01.2008 17.02.2008 prio:2 text:"Inbetriebnahme TK, 238U (PIG)" 01.01.2008 27.01.2010
60926 01.01.2008 B Inbetriebnahme SIS               SIS                                   14.02.2008 24.02.2008 prio:1 text:"Inbetriebnahme SIS, 238U (MEVVA)" 01.01.2008 27.01.2010
19701 05.07.2006 S327 Dipole response of 32Ar and 34Ar Boretzky 2668 k.boretzky@gsi.de Aumann 1408 t.aumann@gsi.de main HTC 040 Ca (Penning?)   800 MeV/u 1e10 ions/spill (SIS) slow extraction 30 2007 Ethan, 5l/h   vacuum window, 20 cm   gamma-calibration sources 40Ca, 32,34Ar through air 10 m 2.5 kV, 3 mA       17.04.2008 18.04.2008 prio:2 text:"S245, Boretzky/Aumann, 12C (EZR), 800 MeV/u, slow extr., (nights only) FRS-HTC" 05.07.2006 27.01.2010
18702 11.04.2008 SiSt   Fehrenbacher             HTA 012 C         7 days 4th block parallel to therapy                     11.04.2008 16.04.2008 prio:3 text:"SiSt, Fehrenbacher, 12C, (EZR), 200 MeV, days only,HTA" 11.04.2008 27.01.2010
508812 06.09.2006 E075 HITRAP Decelerator Commissioning Kester +496159712047 O.Kester@gsi.de Kester 2047 O.Kester@gsi.de parasite HITRAP any ion with A/q ~ 3   4 MeV/u 1E6/cycle (ESR) Cooling and deceleration in ESR 21 preferable February-March 2007 - - - Installation of HITRAP buncher cavities in re-injection channel - - - - - - 06.10.2008 11.10.2008 prio:2 text:"E075, Kester, 64Ni (EZR), 4 MeV/u, 1E6/cycle (ESR), Cooling and deceleration in ESR, HITRAP" 06.09.2006 27.01.2010
609253 22.03.2006 U229-X4 40Ca / Energy -Control Andreyev     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 04.07.2008 05.07.2008 prio:2 text:"U229, R. Mann, energy measurement for SHIP, 40Ca, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
1000181 14.01.2011 s362 gem-tpc ketzer 089/289-14485 bernhard.ketzer@cern.ch leifels 2767 y.leifels@gsi.de parasite HTB 12C   2AGeV 1*10**5-1*10**8 long extraction 21 Beginning of April                     14.04.2011 21.04.2011 prio:2 text:"S362, Ketzer/Leifels, 22Ne (MUCIS), 1.7 AGeV, 1E5-1E8, long extraction, block mode, HTB" 14.01.2011 20.04.2011
72711 15.05.2008 U211 Nuclear Structure of SHE / K-Isomers Sulignano / Heßberger 2735 f.p.hessberger@gsi.de Heßberger 2735 f.p.hessberger@gsi.de parasite Y7 36S (ECR) 36S 4.5-5.9, 8.6, 11.4 100 pnA 5 Hz 39 parasite to exp. U231 (X1, Türler, Düllmann) no ethanol for cooling, ca. 20 l no no only GSI alpha- sf- sources no no no no no 14.07.2008 27.07.2008 prio:2 text:"U233, S. Hofmann, 22Ne (PIG), 5.2 MeV/u, 1-10 pnA, 5 Hz, Y7" 15.05.2008 27.01.2010
70304 30.07.2008 E000   Steck             ESR               no none   no   no no no no none 30.07.2008 30.07.2008 prio:2 text:"E000, Steck, 132Xe (MUCIS), 500 MeV/u, ESR" 30.07.2008 27.01.2010
609254 22.03.2006 U181-X4 40Ca / Energy -Control Andreyev     R.Mann     parasitic , parallel to main X4         copy of Y7 but only 1 Hz     -------- ----------- standard vacuum glas window (3x) -- --- ---- ---- ----- ------ ------ 11.07.2008 11.07.2008 prio:2 text:"U181, R. Mann, energy measurement for SHIP, 40Ca, copy of Y7, 1 Hz, X4" 22.03.2006 27.01.2010
1000204 03.02.2011 E100 Measurement of the bound-state beta decay of bare 205Tl ions Bosch 1758 f.bosch@gsi.de Litvinov 1758 y.litvinov@gsi.de main ESR 208Pb   600 MeV/u 5e9 particles/spill FRS, ESR cooler, SIS cooler 18 as soon as possible no no no no no no no no no no     prio:1 text:"E100, Bosch/Litvinov, 208Pb, 600 MeV/u, 5e9 particles/spill, FRS, ESR cooler, SIS cooler, ESR" 03.02.2011  
70901 27.11.2007 S349 pp2ppK Laura Fabbietti 089 2891431 laura.fabbietti@ph.tum.de yvonne leifels 06159712768 y.leifels@ph.tum.de parasite HTB proton   3. GeV 1e8/spill   12 summer 2008 (parallel to HADES)                     01.10.2008 03.10.2008 prio:2 text:"S349, Fabbietti/Leifels, p, 3 GeV, 1e8/spill, block mode, HTB" 27.11.2007 27.01.2010
608427 01.09.2008                   SIS                                   06.09.2008 17.09.2008 prio:1 text:"breakdown of injection septum" 01.09.2008 27.01.2010
113349 01.01.2008 U223-X4 Heavy Elements, energy control R.Mann           parasite X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling                 22.09.2008 24.09.2008 prio:2 text:"U233, Mann, 64 Ni (EZR), copy of Y7 machine for periodic energy control, 1 Hz, X4" 01.01.2008 27.01.2010
1000180 14.01.2011 S394 Constraining the symmetry energy at Lemmon 00 44 (0)1925 603926 roy.lemmon@stfc.ac.uk Leifels 2767 y.leifels@gsi.de parasitic HTC heavier than Ni   400MeV/u ~5e5/spill long extraction (10s), some conditions as E082 15 before main run no no foil windows (25-50 um Ti) no no yes yes no no no 04.05.2011 08.05.2011 prio:2 text:"S394, Lemmon/Leifels, Au(PIG), 400MeV/u, ~5E5/spill, 10s extraction, HTC" 14.01.2011 13.04.2011
60924 01.01.2009 B 2009-1 UNILAC start             UNILAC                                   07.01.2009 10.01.2009 prio:1 text:"UNILAC start" 01.01.2009 27.01.2010
60803 01.01.2008 B 2009-1 SIS start             SIS                                   07.01.2009 10.01.2009 prio:1 text:"SIS start" 01.01.2008 27.01.2010
60843 01.01.2009 S000 2009-1 machine experiments             SIS                                   13.01.2009 16.01.2009 prio:1 text:"S000, 40Ar (MUCIS) machine experiments" 01.01.2009 27.01.2010
60844 01.03.2009 S000 2009-2 machine experiments             SIS                                   17.02.2009 20.02.2009 prio:1 text:"S000, Ta (MEVVA) machine experiments" 01.03.2009 27.01.2010
78291 04.07.2008 S338 K- flow, strange resonances Herrmann ++496221549664 n.herrmann@gsi.de Schuettauf 2768 a.schuettauf@gsi.de main htb 58Ni no 1.9 AGeV (maximum rigidity) ~5-10 10e6/spill long extraction (max) 51 2009 Ar/Met/Iso (88/10/2), Ar/SF6/Reclin   vaccuum windows (titan 50um, 300 cm2) no no 15 m drift chambers 15kV/1.5 kV no no no 28.01.2009 13.02.2009 prio:1 text:"S338, Herrmann/Leifels, 58Ni (PIG), 1.9 AGeV (maximum rigidity), ~5-10 10e6/spill, long extraction (max), HTB" 04.07.2008 27.01.2010
82891 11.11.2008 U239 Toward Element 117 Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de parasitic X8 TASCA 58Ni 58Ni ~4.5-5.5 MeV/u 1 particle-microAmp (pulse) 5 ms / 5 Hz 4 Feb. 10: 2 shifts. Feb. 12: 2 shifts. isobutane-filled MWPC (few mbar) no no no alpha and gamma calibration soucres 0.1-2.0 mbar He in TASCA no no no no 09.02.2009 09.02.2009 prio:2 text:"U239, Düllmann, 58Ni (PIG), ~4.5-5.5 MeV/u, 1 particle-microAmp (pulse), 5 ms / 5 Hz, X8 TASCA" 11.11.2008 27.01.2010
1000205 03.02.2011 E109 Exploring long-living K isomers via Schottky mass spectrometry at the ESR Walker   P.Walker@surrey.ac.uk Litvinov 1758 y.litvinov@gsi.de main ESR 208Pb   400-600 MeV/u 5e9 particles/spill FRS, ESR cooler, SIS cooler 21 as soon as possible no no no no no no no no no no     prio:4 text:"E109, Walker/Litvinov, Au (PIG),400-600 MeV/u, 5E9/spill, FRS, ESR and SIS cooler, ESR" 03.02.2011 24.05.2011
1000215 17.02.2011 S386 PANDA-DIRC Schwarz 2765 C.Schwarz@gsi.de Schwarz 2765 C.Schwarz@gsi.de parasite HTD 14N   2 GeV >1e10 10s extraction, pion target, block mode 21 June 2011, 3rd to 9th - 10 litre Marcol82 oil     Sr99 10 uC air HV 3kV, commercial HV devices   evtl. visible laser 1mW   14.06.2011 19.06.2011 prio:2 text:"S386, Schwarz, 14N, 2 GeV, >1E10, 10s extr., pion target, block mode, HTD" 17.02.2011 13.04.2011
609223 01.01.2009 B 2009-1               UNILAC                                   26.01.2009 06.02.2009 prio:2 text:"B, commissioning M-Branch " 01.01.2009 27.01.2010
82691 10.11.2008 UBIO   Scholz 1340 m.scholz@gsi.de Scholz 1340 m.scholz@gsi.de parasite X6 C   11.4 MeV     6 Anfang Block I / 2009                     17.01.2009 18.01.2009 prio:2 text:"UBIO, Scholz/Voss, 34S (EZR), 4.8 MeV, long pulses, X0" 10.11.2008 27.01.2010
1000216 17.02.2011 U239 Toward Element 117 Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de parasitic X8 TASCA 48Ca (EZR) 48Ca 4.5-5.5 MeV/u 15 particle-microAmp (pulse) in X8 5 ms / 5 Hz 24 Parallel to SHIPTRAP: June 12-19 <2mbar He or He/H2 mix. in TASCA. Isobutane-filled MWPC (few mbar) no no no alpha and gamma calibration soucres 0.1-2.0 mbar He in TASCA standard alpha and gamma HV no no no     prio:2 text:"U239, Düllmann/Düllmann, 48Ca (EZR), 4.5-5.5 MeV/u, 15 particle-microAmp (pulse) in X8, 5 ms / 5 Hz, X8 TASCA" 17.02.2011  
609241 01.01.2009 B 2009-1 UNILAC start             UNILAC                                   25.02.2009 26.02.2009 prio:1 text:"UNILAC-Inbetriebnahme" 01.01.2009 27.01.2010
608031 01.01.2009 B 2009-1 SIS start             SIS                                   25.02.2009 26.02.2009 prio:1 text:"SIS-Inbetriebnahme" 01.01.2009 27.01.2010
18611 03.08.2009 U000 2009-2 machine experiments             UNILAC                                   03.08.2009 07.08.2009 prio:1 text:"U000, machine experiments" 03.08.2009 27.01.2010
18612 13.10.2009 U000 2009-2 machine experiments             UNILAC                                   13.10.2009 14.10.2009 prio:1 text:"U000, machine experiments" 13.10.2009 27.01.2010
1000208 10.02.2011 B Inbetriebnahme UNILAC Barth           main UNILAC   40 Ar 11.4 MeV/u       21.-27.03.2011                     21.03.2011 27.03.2011 prio:1 text:"B, Barth, 40Ar (MUCIS) 11.4 MeV/u, UNILAC" 10.02.2011 10.02.2011
1000213 16.02.2011 U265 Energy loss in laser generated plasma Roth Markus 06151 165417 m.roth@gsi.de Blazevic Abel 2294 a.blazevic@gsi.de parasite Z6 48Ca, q=20+   3,6 MeV/u >10 µA   30 8. - 17. Mai 2011 - - - - - - - - - - 08.06.2011 17.06.2011 prio:2 text:"U265, Roth/Blazevic, 48Ca17+, 3,6 MeV/u, >10 µA, Z6" 16.02.2011 09.05.2011
1000217 18.02.2011 UMAT   Severin 2715 d.severin@gsi.de Trautmann 2716 c.trautmann@gsi.de parasite M-branch Au   4.8 PIG Au long pulses   21 30.5.-5.6.2011                     01.06.2011 05.06.2011 prio:2 text:"UMAT, Severin/Trautmann , Au (PIG), 4.8 MeV/u, 5 ms, M1, M3" 18.02.2011 17.03.2011
1000221 22.02.2011 ubio microbeam Voss / Jakob 2637 k.-o.voss@gsi.de Voss     parasite X0 Au   4.8MeV/u   5Hz lange Pulse 3 parasitaere Tage Anfang Mai                         prio:2 text:"UBIO, Voss / Jakob, Au, 4.8MeV/u, 5Hz lange Pulse, X0" 22.02.2011 17.03.2011
1000223 24.02.2011 B InbetriebnahmeESR Scheeler           main ESR   12C (EZR) 200 MeV/u       12.04. -13.04.2011                         prio:1 text:"B, Scheeler, 200 MeV/u, ESR" 24.02.2011  
608421 01.01.2008 S000 2008-3 machine experiments             SIS                                   04.08.2008 08.08.2008 prio:2 text:"S000, 132Xe, 200 MeV/u, machine experiments, days only" 01.01.2008 27.01.2010
70741 23.11.2007 U219 TASCA commissioning Schädel 2460 m.schaedel@gsi.de Schädel 2460 m.schaedel@gsi.de Main X8 40Ca no 5.5 - 6.5 MeV/u 2 pµA (DC) 5 ms, 50 Hz 42 July-August 2008 < 1 mbar He in TASCA Pu244 target n no Pu244 target ca. 1.5 m < 1 mbar He in TASCA no no no Pu244 target, Chemistry behind TASCA, open radioactivity 10.07.2008 10.07.2008 prio:2 text:"U219, Schädel, 40Ca (PIG), copy of Y7, 5 Hz, X8" 23.11.2007 27.01.2010
113348 01.01.2008 U223-X4 Heavy Elements, energy control R.Mann           parasite X4 48Ca 48Ca 5.0 MeV/u 1 pmicroA   126 early in 2005, before 54Cr/Sulignano   alcohol for cooling                 12.09.2008 14.09.2008 prio:2 text:"U233, Mann, 64 Ni (EZR), copy of Y7 machine for periodic energy control, 1 Hz, X4" 01.01.2008 27.01.2010
77901 02.07.2008 UMAT Materialforschung C.Trautmann           Main X0 Au   11.4 MeV/u 50 Hz, long pulses (4 ms)   12 first block 2009                     25.03.2009 31.03.2009 prio:1 text:"UMAT, C.Trautmann, Au, PIG, 11.4 MeV/u, 5 Hz, long pulses (4 ms), X0" 02.07.2008 27.01.2010
12081 26.05.2005 S304 SPALADIN Ducret +33 1 69087308 jean-eric.ducret@cea.fr Trautmann 2774 w.trautmann@gsi.de Main HTC 197Au   1000 MeV/u 30000 / spill 10 s extraction 24 shifts 4th block H, 300 l (STP), P10 (1m^3), closed volumes No Aladin magnet vacuum windows TPC MUSIC IV & TOF wall to install behind ALADIN No No 3000 V, 3 mA (phototube power supply) No No / 28.03.2009 31.03.2009 prio:2 text:"S304/S357, Ducret/Simon, 197Au, 1000 MeV/u, PIG, 30000/spill, 10 s extraction, HTC" 26.05.2005 27.01.2010
508814 06.09.2006 E075 HITRAP Decelerator Commissioning Kester +496159712047 O.Kester@gsi.de Kester 2047 O.Kester@gsi.de parasite ESR any ion with A/q ~ 3   4 MeV/u 1E6/cycle (ESR) Cooling and deceleration in ESR 21 preferable February-March 2007 - - - Installation of HITRAP buncher cavities in re-injection channel - - - - - - 06.04.2009 11.04.2009 prio:2 text:"E075, Herfurth, 136Xe, PIG, 4 MeV/u, 1E6/cycle (ESR), Cooling and deceleration in ESR, HITRAP" 06.09.2006 27.01.2010
18613 24.04.2009 U000 2009-2 machine experiments             UNILAC                                   24.04.2009 24.04.2009 prio:1 text:"U000, machine experiments" 24.04.2009 27.01.2010
186117 01.01.2009 U000 2009-2 machine experiments             UNILAC                                   06.07.2009 12.07.2009 prio:1 text:"U000, machine experiments, 40Ar, MUCIS, 197Au, PIG" 01.01.2009 27.01.2010
94291 01.04.2009 FRS000 FRS000 Nociforo 2741 c.nociforo@gsi.de Gorska     parasite FRS Ni beam   300-500 MeV 1e4/spill -1e8/spill slow extraction 5 days (10% /day) 7-11 October 2009           air at S2-FRS, gas detectors (P10,CF4)         02.10.2009 06.10.2009 prio:2 text:"FRS000, Nociforo/Gorska, U, PIG, 300-500 MeV, 1e4/spill -1e8/spill , slow extraction, FRS" 01.04.2009 27.01.2010
82901 11.11.2008 U239 Toward Element 117 Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de Düllmann +49-6159-71-2462 c.e.duellmann@gsi.de main X8 TASCA 48Ca (ECR) 48Ca 4.5-5.5 MeV/u 4 particle-microAmp (pulse) in X8 5 ms / 50 Hz 126 Starting April 6, 2009. Extending into Block 3/2009 isobutane-filled MWPC (few mbar) no no no alpha and gamma calibration soucres 0.1-2.0 mbar He or He/H2 mixture in TASCA no no no no 19.05.2009 19.05.2009 prio:2 text:"U239, Düllmann/Düllmann, 48Ca , ECR, 4.5-5.5 MeV/u, 4 particle-microAmp (pulse), 5 ms / 50 Hz, X8 TASCA" 11.11.2008 27.01.2010
1000177 11.01.2011 S397 Diagnostics for Intense Focused Heavy Ion Beams Ulrich   andreas.ulrich@ph.tum.de Varentsov 1329 d.varentsov@gsi.de parasite, single shots HHT U (preferred) or other heavy species   200-500 MeV/u MAXIMUM ( > 4e9/spill for U) fast extraction, preferably SIS cooler 10 2011                         prio:2 text:"S397, Ulrich/Varentsov, U (MEVVA), 200-500 MeV/u, > 4E9/spill, fast extr., preferably SIS cooler, HHT" 11.01.2011 28.07.2011
1000206 07.02.2011 U258 Synthesis of New Elements at TASCA Düllmann 06159-71-2462 c.e.duellmann@gsi.de Düllmann 06159-71-2462 c.e.duellmann@gsi.de Main X8 TASCA 48Ca10+ 48Ca 4.5-5.5 60 particleMicroAmps in Pulse in X8 50 Hz / >= 5 ms 21 End of block 2 (second half of June 2011) isobutane-filled MWPC inside TASCA (few mbar) no no no transuranium target in TASCA, standard alpha- and gamma-calibration sources 0.1-2.0 mbar He or He/H2 mixture inside TASCA no no no no 06.06.2011 12.06.2011 prio:1 text:"U261, Rudolph/Düllmann, 48Ca10+ (EZR), 4.5-5.5, 60 pµA (pulse), 50 Hz, > 5 ms, X8 TASCA" 07.02.2011 13.04.2011
1000210 10.02.2011 B Inbetriebnahme SIS Scheeler           main HTM   12C (EZR) 200 MeV/u       29.03. -01.04.2011                     29.03.2011 01.04.2011 prio:2 text:"B, Scheeler, 12C (EZR) 200 MeV/u, HTM" 10.02.2011 10.02.2011
1000222 22.02.2011 ubio microbeam Voss / Jakob 2637 k.-o.voss@gsi.de Voss     parasite X0 Cr   4.8MeV/u   5Hz lange Pulse 3 parasitaere Tage Ende Mai                     23.05.2011 26.05.2011 prio:2 text:"UBIO, Voss/Jakob, Cr (EZR), 4.8MeV/u, 5 ms, 5Hz, X0" 22.02.2011 17.05.2011
1000224 01.03.2011 UMAT   Severin 2715 d.severin@gsi.de Trautmann 2716 c.trautmann@gsi.de parasite X0 Au   11.4 PIG Au   9 between 27.4. and 12.5.                     27.04.2011 29.04.2011 prio:2 text:"UMAT, Severin/Trautmann , Au (PIG), 11.4 MeV/u , X0" 01.03.2011 26.04.2011
2002 23.07.2009 UMAT Materialforschung (X0 und M-Zweig) Severin 2715 d.severin@gsi.de Trautmann 2715 d.severin@gsi.de Parasite M-branch C   11.4 MeV/u Intensität nach Absprache mit. K.O. Voss, M-Zweig   12 11.08. - 14.08.                     11.08.2009 14.08.2009 prio:2 text:"UMAT, Severin/Trautmann, C, 11.4 MeV/u, Intensität nach Absprache mit K. Voss, M-branch" 23.07.2009 27.01.2010
10069 28.07.2009 U242 MSS of 140Ba from an alpha-transfer reaction RAINOVSKI 00359896744723 rig@phys.uni-sofia.bg Hans-Jürgen Wollersheim +49/(0)6159/71-2670 H.J.Wollersheim@gsi.de main X7 136Xe 136Xe 4 MeV/u 1 pnA 15 mid March - beginning of April, 2009; May 2009. The experiment should preferably be performed together with the experiment U246 (spokesperson J. Leske)                     18.06.2010 23.06.2010 prio:1 text:"U242, Rainovski/Wollersheim, 136Xe, PIG, 4 MeV/u, 1 pnA, X7" 28.07.2009 28.01.2010
74891 20.02.2008 U229 New Island of strong deformation above the shell closure at Z=82 and close to the neutron mid-shell at N=104 Andreyev +32-16327822 andrei.andreyev@fys.kuleuven.be Hofmann S.   s.hofmann@gsi.de main Y7 40Ca no ~5 MeV/u 1000 pnA   21 summer 2008 (possible during the carbon therapy campaign) no no no no no no no no no no 04.07.2008 06.07.2008 prio:1 text:"U229, Andreyev/Hofmann S., 40Ca (PIG), ~5 MeV/u, 1000 pnA, Y7" 20.02.2008 27.01.2010
75691 31.03.2008 Forster Irradiation of mineral samples Forster             HTB                                   11.01.2009 12.01.2009 prio:1 text:"Forster, 12C (ECR), 200, 300, 450, 600 MeV/u, 10^8/s, HTB" 31.03.2008 27.01.2010
68703 31.10.2007 U217 Mass Measurements at SHIPTRAP Block 2148 m.block@gsi.de Block 2148 m.block@gsi.de Parasitic to therapy / Y7 12Ca (ECR)   5 MeV/u >1000pnA, 50Hz 5ms 12 25.06.08 - 28.06.08     Window foil between SHIP and SHIPTRAP               02.08.2008 03.08.2008 prio:2 text:"U238 , Block, 48Ca (ECR) , 5 MeV/u, >1000pnA, 50Hz , 5ms, Y7" 31.10.2007 27.01.2010
71711 30.11.2007 SMAT Materials research Trautmann 2716 C.Trautmann@gsi.de Trautmann 2716 C.Trautmann@gsi.de main or parasitic (block sharing mode) HTA Xe (KW10-11), Ta(KW14), U(KW19) - 200 MeV/u max.   each 3-6(main) or 6-15(parasitic) Xe (KW10-11), Ta(KW14), U(KW19) no no no no no 50 cm air no no no no 28.07.2008 29.07.2008 prio:2 text:"SMAT, Trautmann, 132Xe (MUCIS), 500 MeV/u, HTA" 30.11.2007 27.01.2010
75692 31.03.2008 Forster Irradiation of mineral samples Forster             HTB                                   13.10.2008 15.10.2008 prio:2 text:"Forster, p, 150, 220, 400, 600 MeV/u, 10^9/s, HTB (total beamtime 3 shifts)" 31.03.2008 27.01.2010
60842 01.07.2008 S000 2008-3 machine experiments             SIS                                   05.09.2008 05.09.2008 prio:1 text:"S000, 181Ta (MEVVA) machine experiments" 01.07.2008 27.01.2010
18411 01.07.2008 B 2008-3 machine experiments     U. Scheeler       HTA                                   01.07.2008 04.07.2008 prio:2 text:"B, 12C, 100-400 MeV/u, HTA" 01.07.2008 27.01.2010
1000065 05.02.2010 UMAT Mikrosonde Voss 2715 k.-o.voss@gsi.de Voss 2637   main X0 7Li   4.8   >=25Hz 6 13.-14.4.2010                     13.04.2010 14.04.2010 prio:1 text:"UMAT, Voss, 7Li, 4.8, >=25Hz, X0" 05.02.2010 12.03.2010
1000066 09.02.2010 E081 inelstic electron scatterting Hagmann 2437 s.hagmann@gsi.de hagmann 2437 s.hagmann@gsi.de main ESR Kr   30 AMeV 1e8   21 29. März bis 5. April standard H2 target no no no no no